Bid Tab X-ray: 6485-19-001

Jun 10, 2025 · Pecos Sign up free
Set your company to personalize scores

6485-19-001 ASPPM

6485-19-001 · let Jun 10, 2025 · Pecos, Odessa · Material Maintenance Project

$98,560Low bid: SOUTHERN SOURCING SOLUTIONS, LLC-6.1% vs estimate $105,000
$12,040Left on the table12.2% gap to the second bid
2BiddersSpread 12% low to high
5Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1SOUTHERN SOURCING SOLUTIONS, LLC $98,560-6.1% $12,040 0 0
2TOUCHSTONE RESOURCES, LLC $110,600+12.2%5.3% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

SOUTHERN SOURCING SOLUTIONS, LLC vs TOUCHSTONE RESOURCES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8012-7042 ASPH CONC PATCH MAT (DEL)(ST3)100 TON $198.21$244.00$195.54 $4,579
8012-7044 ASPH CONC PATCH MAT (DEL)(ST5)100 TON $209.10$242.00$197.24 $3,290
8012-7040 ASPH CONC PATCH MAT (DEL)(ST1)100 TON $185.37$215.00$158.39 $2,963
8012-7043 ASPH CONC PATCH MAT (DEL)(ST4)100 TON $198.02$210.00$197.37 $1,198
8012-7041 ASPH CONC PATCH MAT (DEL)(ST2)100 TON $194.90$195.00$175.27 $10

Positive: the low bidder was cheaper on that item. These 5 items account for $12,040 of the $12,040 gap.