SH 214-NBI051850046106005-Parmer
0461-06-028 · let Sep 4, 2025 · Parmer, Lubbock · Bridge Maintenance
$4,197,908Low bid: PATHFIELD INVESTMENTS LLC-3.1% vs estimate $4,332,214
$279,771Left on the table6.7% gap to the second bid
10BiddersSpread 75% low to high
43Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | PATHFIELD INVESTMENTS LLC | $4,197,908 | -3.1% | $279,771 | 2+$213,337 | 0 | |
| 2 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $4,477,679 | +6.7% | 3.4% | $54,531 | 2+$51,963 | 0 |
| 3 | TI-ZACK CONCRETE, LLC | $4,532,210 | +8.0% | 4.6% | $164,492 | 6+$411,583 | 2-$145,867 |
| 4 | SILVER CREEK CONSTRUCTION, INC. | $4,696,702 | +11.9% | 8.4% | $213,202 | 3+$289,161 | 1-$28,522 |
| 5 | GIBSON & ASSOCIATES, INC. | $4,909,904 | +17.0% | 13.3% | $27,725 | 2+$484,857 | 2-$184,956 |
| 6 | RAGLE CONSTRUCTION, INC. | $4,937,629 | +17.6% | 14.0% | $12,460 | ||
| 7 | GILVIN-TERRILL, LTD. | $4,950,089 | +17.9% | 14.3% | $234,668 | ||
| 8 | STRUCTURAL INTEGRITY GROUP LLC | $5,184,757 | +23.5% | 19.7% | $1,808,173 | ||
| 9 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $6,992,930 | +66.6% | 61.4% | $358,830 | ||
| 10 | ICOS MANAGEMENT, LLC | $7,351,760 | +75.1% | 69.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
PATHFIELD INVESTMENTS LLC vs SCOTT TUCKER CONSTRUCTION COMPANY, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 439-7025 POLYESTER POLYMER CONC OVERLAY | 554 CY | $2,300.00 | $3,456.00 | $3,291.39 | $640,424 |
| 451-7024 RETROFIT RAIL (TY SSTR) | 2,446 LF | $260.00 | $185.00 | $175.01 | -$183,450 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 1,500 SF | $180.00 | $60.00 | $95.74 | -$180,000 |
| 427-7005 EPOXY WATERPROOF FINISH (TY X) | 10,360 SF | $18.00 | $7.00 | $9.61 | -$113,960 |
| 420-7062 CL C CONC (VEH DEFL WALL) | 63.6 CY | $500.00 | $1,427.00 | $982.01 | $58,957 |
| 500-7001 MOBILIZATION | 1 LS | $390,000.00 | $447,771.00 | $523,850.32 | $57,771 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $11,000.00 | $5,973.00 | $11,585.04 | -$50,270 |
| 454-7003 ARMOR JOINT (SEALED) | 882 LF | $165.00 | $218.00 | $154.25 | $46,746 |
| 450-7024 RAIL (TY SSTR) | 2,308 LF | $80.00 | $95.00 | $69.92 | $34,620 |
| 420-7052 CL C CONC (RAIL FOUNDATION) | 514 CY | $550.00 | $490.00 | $552.17 | -$30,840 |
| 505-7001 TMA (STATIONARY) | 306 DAY | $210.00 | $289.00 | $217.57 | $24,174 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 500 SF | $225.00 | $181.00 | $150.68 | -$22,000 |
| 104-7016 REMOV CONC (CURB) | 3,540 LF | $10.00 | $4.00 | $6.82 | -$21,240 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 540 DAY | $120.00 | $87.00 | $87.82 | -$17,820 |
| 788-7003 CONCRETE BEAM REP(STRAND SPLICE & CFRP) | 1 EA | $20,000.00 | $37,418.00 | $10,082.27 | $17,418 |
| 432-7002 RIPRAP (CONC)(5 IN) | 30 CY | $540.00 | $1,092.00 | $585.15 | $16,560 |
| 420-7050 CL C CONC (CRASHWALL) | 77.6 CY | $1,200.00 | $1,019.00 | $1,012.86 | -$14,046 |
| 432-7012 RIPRAP (CONC)(FLUME) | 10 CY | $760.00 | $1,943.00 | $674.93 | $11,830 |
| 540-7020 MTL THRIE-BEAM GD FEN (STEEL POST) | 4 EA | $600.00 | $3,509.00 | $2,274.69 | $11,636 |
| 788-7002 CONCRETE BEAM REPAIR (CFRP) | 3 EA | $11,000.00 | $14,701.00 | $6,492.05 | $11,103 |
Positive: the low bidder was cheaper on that item. These 20 items account for $297,614 of the $279,771 gap.
PATHFIELD INVESTMENTS LLC: unbalanced items
Placed 1SCOTT TUCKER CONSTRUCTION COMPANY, LLC: unbalanced items
Placed 2TI-ZACK CONCRETE, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 450-7024 RAIL (TY SSTR) | 2,308 LF | $140.00 | $69.92 | 2.00x | $161,739 |
| 427-7005 EPOXY WATERPROOF FINISH (TY X) | 10,360 SF | $19.04 | $9.61 | 1.98x | $97,726 |
| 354-7052 PLANE ASPH CONC PAV(3") | 6,640 SY | $12.32 | $2.92 | 4.22x | $62,413 |
| 788-7002 CONCRETE BEAM REPAIR (CFRP) | 3 EA | $19,040.00 | $6,492.05 | 2.93x | $37,644 |
| 540-7020 MTL THRIE-BEAM GD FEN (STEEL POST) | 4 EA | $9,520.00 | $2,274.69 | 4.19x | $28,981 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 4 EA | $8,960.00 | $3,190.07 | 2.81x | $23,080 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $1,680.00 | $11,585.04 | 0.15x | -$99,050 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 540 DAY | $1.12 | $87.82 | 0.01x | -$46,817 |
SILVER CREEK CONSTRUCTION, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 454-7003 ARMOR JOINT (SEALED) | 882 LF | $375.00 | $154.25 | 2.43x | $194,697 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 3,540 LF | $20.00 | $2.84 | 7.03x | $60,735 |
| 354-7052 PLANE ASPH CONC PAV(3") | 6,640 SY | $8.00 | $2.92 | 2.74x | $33,729 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 540 DAY | $35.00 | $87.82 | 0.40x | -$28,522 |
GIBSON & ASSOCIATES, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 454-7003 ARMOR JOINT (SEALED) | 882 LF | $625.00 | $154.25 | 4.05x | $415,197 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 500 SF | $290.00 | $150.68 | 1.92x | $69,660 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 1,500 SF | $20.00 | $95.74 | 0.21x | -$113,615 |
| 429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH)) | 500 SF | $50.00 | $192.68 | 0.26x | -$71,341 |