| 10 | 221(G)2800 |
TEMPORARY FIBER LOG | 20 | LF |
$6.00 |
$50.75 |
$55.00 |
$17.00 |
$25.00 |
$5.00 |
| 20 | 221(M)3400 |
TEMPORARY ENVIRONMENTAL FENCE | 2,210 | LF |
$8.00 |
$4.00 |
$14.00 |
$18.50 |
$11.25 |
$10.00 |
| 30 | 804(A)2200 |
STRUCTURAL CONCRETE | 2 | CY |
$1,200.00 |
$300.00 |
$350.00 |
$1,800.00 |
$550.00 |
$450.00 |
| 40 | 804(B)2300 |
REINFORCING STEEL | 240 | LB |
$4.00 |
$2.50 |
$2.00 |
$8.50 |
$3.00 |
$15.00 |
| 50 | 828(A)0200 |
VEHICLE LOOP DETECTOR | 1 | EA |
$2,000.00 |
$975.00 |
$1,500.00 |
$3,750.00 |
$2,700.00 |
$3,500.00 |
| 60 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 2 | EA |
$200.00 |
$150.00 |
$100.00 |
$225.00 |
$100.00 |
$150.00 |
| 70 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 50 | SF |
$50.00 |
$116.00 |
$15.00 |
$175.00 |
$25.00 |
$75.00 |
| 80 | 851(B)2310 |
2 1/2"@5.79 GALV.STL.PIPE POST | 130 | LF |
$35.00 |
$18.00 |
$15.00 |
$27.00 |
$22.00 |
$45.00 |
| 90 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 170 | EA |
$100.00 |
$65.00 |
$150.00 |
$96.75 |
$80.00 |
$135.00 |
| 100 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 8,693 | LF |
$3.00 |
$0.6000 |
$2.00 |
$0.9000 |
$1.50 |
$4.00 |
| 110 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 4,200 | LF |
$12.00 |
$2.50 |
$10.00 |
$6.75 |
$22.00 |
$15.00 |
| 120 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 157 | LF |
$15.22 |
$6.00 |
$25.00 |
$8.95 |
$20.00 |
$20.00 |
| 130 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 3 | EA |
$275.00 |
$100.00 |
$200.00 |
$148.75 |
$250.00 |
$150.00 |
| 140 | 856(B)8311 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(SYMBOLS) | 20 | EA |
$500.00 |
$400.00 |
$500.00 |
$1,599.50 |
$475.00 |
$450.00 |
| 150 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 2,538 | LF |
$1.50 |
$0.0900 |
$2.00 |
$0.4000 |
$1.00 |
$0.1000 |
| 160 | 857(F)9710 |
PAVEMENT MARKING REMOVAL(ARROWS) | 4 | EA |
$98.72 |
$25.00 |
$200.00 |
$37.25 |
$50.00 |
$5.00 |
| 170 | 857(F)9730 |
PAVEMENT MARKING REMOVAL(SYMBOLS) | 17 | EA |
$222.00 |
$50.00 |
$200.00 |
$74.50 |
$100.00 |
$5.00 |
| 180 | 880(J)7100 |
(SP) CONSTRUCTION TRAFFIC CONTROL | 60 | SD |
$250.00 |
$60.47 |
$50.00 |
$186.00 |
$25.00 |
$25.00 |
| 190 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,200.00 |
$30,865.00 |
$10,000.00 |
$11,500.00 |
$7,500.00 |
$12,500.00 |