| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$21,000.00 |
$24,700.00 |
$13,279.65 |
$30,000.00 |
| 20 | 202(H)2900 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$45,000.00 |
$49,000.00 |
$93,800.00 |
$98,279.36 |
$70,000.00 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 200 | LF |
$4.00 |
$4.50 |
$4.00 |
$4.50 |
$3.10 |
$6.00 |
| 40 | 221(E)2600 |
TEMPORARY SILT DIKE | 400 | LF |
$16.00 |
$15.25 |
$12.00 |
$12.00 |
$9.93 |
$10.00 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 6,900 | SY |
$4.00 |
$3.20 |
$3.68 |
$6.10 |
$5.58 |
$6.00 |
| 60 | 233(A)0200 |
VEGETATIVE MULCHING | 1.43 | AC |
$1,000.00 |
$1,000.00 |
$300.00 |
$1,210.00 |
$1,489.31 |
$4,100.00 |
| 70 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 650 | TON |
$45.00 |
$42.00 |
$38.28 |
$46.00 |
$50.88 |
$60.00 |
| 80 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$350.00 |
$300.00 |
$310.00 |
$622.57 |
$600.00 |
| 90 | 613(B)5612 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 55 | LF |
$60.00 |
$60.00 |
$51.00 |
$69.80 |
$74.22 |
$100.00 |
| 100 | 613(B)5620 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 163 | LF |
$180.00 |
$120.00 |
$82.00 |
$125.00 |
$137.76 |
$150.00 |
| 110 | 613(M)6904 |
TYPE B3 CULVERT END TREATMENT | 2 | EA |
$2,100.00 |
$2,200.00 |
$1,567.00 |
$2,800.00 |
$2,079.06 |
$2,500.00 |
| 120 | 613(M)6908 |
TYPE C3 CULVERT END TREATMENT | 4 | EA |
$3,500.00 |
$3,500.00 |
$2,289.00 |
$4,200.00 |
$2,233.15 |
$5,500.00 |
| 130 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 210.6 | CY |
$17.50 |
$15.00 |
$14.00 |
$32.00 |
$18.99 |
$30.00 |
| 140 | 501(F)1700 |
GRANULAR BACKFILL | 109.6 | CY |
$72.00 |
$84.00 |
$80.00 |
$175.00 |
$93.31 |
$70.00 |
| 150 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 319 | LF |
$325.00 |
$320.00 |
$309.83 |
$379.40 |
$382.92 |
$380.00 |
| 160 | 504(D)5410 |
CONCRETE RAIL (TR3) | 233.3 | LF |
$92.50 |
$100.00 |
$101.00 |
$167.00 |
$89.60 |
$250.00 |
| 170 | 506(A)7200 |
STRUCTURAL STEEL | 660 | LB |
$4.50 |
$3.50 |
$4.69 |
$4.42 |
$3.34 |
$12.00 |
| 180 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,400.00 |
$1,050.00 |
$1,973.00 |
$2,368.00 |
$1,773.15 |
$2,000.00 |
| 190 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 4 | EA |
$1,400.00 |
$1,050.00 |
$1,973.00 |
$2,368.00 |
$1,773.15 |
$2,000.00 |
| 200 | 509(A)0210 |
CLASS AA CONCRETE | 71.1 | CY |
$850.00 |
$800.00 |
$925.00 |
$944.00 |
$1,309.34 |
$700.00 |
| 210 | 509(B)0320 |
CLASS A CONCRETE | 78.8 | CY |
$900.00 |
$800.00 |
$947.00 |
$818.00 |
$931.24 |
$700.00 |
| 220 | 511(A)2210 |
REINFORCING STEEL | 29,838 | LB |
$1.20 |
$1.20 |
$1.40 |
$1.62 |
$1.33 |
$4.00 |
| 230 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 120 | LF |
$42.50 |
$60.00 |
$80.80 |
$70.07 |
$86.51 |
$50.00 |
| 240 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 364 | LF |
$50.00 |
$75.00 |
$96.80 |
$87.00 |
$111.53 |
$70.00 |
| 250 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 120 | LF |
$12.00 |
$20.00 |
$20.20 |
$35.00 |
$69.83 |
$65.00 |
| 260 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 364 | LF |
$14.00 |
$20.00 |
$24.20 |
$30.00 |
$53.56 |
$65.00 |
| 270 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 280 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 1,214 | TON |
$58.50 |
$67.00 |
$60.88 |
$75.00 |
$101.77 |
$120.00 |
| 290 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$35.00 |
$35.00 |
$45.00 |
$35.00 |
$14.00 |
$25.00 |
| 300 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 36 | LF |
$35.00 |
$35.00 |
$55.00 |
$30.00 |
$18.29 |
$25.00 |
| 310 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$35,000.00 |
$20,000.00 |
$12,999.00 |
$8,500.00 |
$37,000.00 |
$30,000.00 |
| 320 | 623(F)1748 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$6,000.00 |
$3,900.00 |
$4,000.00 |
$4,980.00 |
$4,933.33 |
$6,000.00 |
| 330 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$3.50 |
$1.05 |
$5.00 |
$3.27 |
$11.17 |
$3.50 |
| 340 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 720 | SD |
$2.50 |
$1.85 |
$0.3500 |
$0.2800 |
$0.3100 |
$0.5000 |
| 350 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$2.00 |
$1.30 |
$1.50 |
$1.63 |
$0.0200 |
$3.00 |
| 360 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 2,640 | SD |
$0.3000 |
$0.6500 |
$0.5000 |
$0.8300 |
$1.05 |
$1.50 |
| 370 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,400.00 |
$7,300.00 |
$7,400.00 |
$6,849.73 |
$7,500.00 |
| 380 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$2,750.00 |
$3,000.00 |
$3,723.27 |
$5,000.00 |
| 390 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$62,500.00 |
$34,000.00 |
$45,000.00 |
$49,000.00 |
$73,000.00 |
$65,000.00 |