| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$72,120.25 |
$21,530.43 |
$145,000.00 |
$160,000.00 |
$225,000.00 |
$68,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 10,135 | CY |
$13.00 |
$9.38 |
$4.73 |
$25.00 |
$25.00 |
$14.50 |
$18.00 |
| 30 | 202(B)2300 |
MUCK EXCAVATION | 4,690 | CY |
$4.00 |
$13.73 |
$10.72 |
$25.00 |
$25.00 |
$12.00 |
$55.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 92,808 | CY |
$10.00 |
$7.80 |
$16.67 |
$14.00 |
$16.50 |
$19.50 |
$21.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$80,000.00 |
$62,704.93 |
$32,267.80 |
$135,000.00 |
$100,000.00 |
$325,000.00 |
$110,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 11,164 | LF |
$3.00 |
$4.05 |
$3.00 |
$2.75 |
$3.25 |
$2.70 |
$6.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 98 | LF |
$20.00 |
$11.20 |
$11.43 |
$10.00 |
$10.00 |
$10.25 |
$25.00 |
| 80 | 221(F)2720 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 37 | CY |
$200.00 |
$128.27 |
$139.54 |
$100.00 |
$115.00 |
$215.00 |
$150.00 |
| 90 | 221(F)2730 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 24 | CY |
$330.00 |
$130.35 |
$139.52 |
$200.00 |
$275.00 |
$225.00 |
$150.00 |
| 100 | 230(A)7200 |
SOLID SLAB SODDING | 107,174 | SY |
$4.00 |
$2.32 |
$2.37 |
$2.00 |
$2.05 |
$2.10 |
$5.00 |
| 110 | 232(A)9200 |
SEEDING METHOD A | 16.61 | AC |
$2,800.00 |
$583.85 |
$595.57 |
$500.00 |
$250.00 |
$495.00 |
$3,500.00 |
| 120 | 233(A)0200 |
VEGETATIVE MULCHING | 16.61 | AC |
$1,300.00 |
$819.75 |
$836.20 |
$700.00 |
$350.00 |
$695.00 |
$3,500.00 |
| 130 | 241 3100 |
MOWING | 33.22 | AC |
$320.00 |
$324.36 |
$330.87 |
$285.00 |
$150.00 |
$275.00 |
$500.00 |
| 140 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$4,300.00 |
$6,441.15 |
$2,436.74 |
$3,500.00 |
$5,000.00 |
$2,650.00 |
$6,500.00 |
| 150 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 99,040 | SY |
$5.00 |
$3.66 |
$3.77 |
$4.00 |
$4.75 |
$7.00 |
$2.60 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,840 | TON |
$42.00 |
$19.47 |
$24.04 |
$25.00 |
$37.00 |
$30.00 |
$125.00 |
| 170 | 509(A)0200 |
CLASS AA CONCRETE | 171 | CY |
$1,100.00 |
$906.77 |
$814.33 |
$1,300.00 |
$1,200.00 |
$1,350.00 |
$900.00 |
| 180 | 511(A)2200 |
REINFORCING STEEL | 25,113 | LB |
$1.60 |
$1.79 |
$1.36 |
$3.00 |
$2.00 |
$1.75 |
$2.20 |
| 190 | 613(A)5220 |
30" R.C.PIPE CLASS III | 22 | LF |
$145.00 |
$172.62 |
$272.55 |
$150.00 |
$230.00 |
$175.00 |
$220.00 |
| 200 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,720.00 |
$1,284.95 |
$2,531.40 |
$1,500.00 |
$2,700.00 |
$2,000.00 |
$8,500.00 |
| 210 | 613(S)7700 |
STANDARD BEDDING MATERIAL, CLASS B | 8 | CY |
$80.00 |
$35.91 |
$17.81 |
$40.00 |
$45.00 |
$85.00 |
$65.00 |
| 220 | 613(V)8000 |
TRENCH EXCAVATION | 12 | CY |
$25.00 |
$11.16 |
$147.15 |
$40.00 |
$25.00 |
$50.00 |
$60.00 |
| 230 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$15,619.31 |
$6,080.03 |
$32,357.00 |
$52,288.10 |
$65,000.00 |
$18,500.00 |
| 240 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 69 | CY |
$30.00 |
$27.54 |
$13.32 |
$75.00 |
$50.00 |
$20.00 |
$100.00 |
| 250 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 145 | CY |
$36.00 |
$59.66 |
$10.77 |
$100.00 |
$70.00 |
$35.00 |
$120.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 268.4 | CY |
$1,100.00 |
$620.42 |
$704.60 |
$1,300.00 |
$720.00 |
$1,050.00 |
$900.00 |
| 270 | 511(A)2210 |
REINFORCING STEEL | 41,940 | LB |
$1.60 |
$1.79 |
$1.22 |
$3.00 |
$1.60 |
$1.35 |
$3.00 |
| 280 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$66,609.37 |
$18,693.08 |
$60,000.00 |
$100,000.00 |
$25,000.00 |
$38,500.00 |
| 290 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 6 | EA |
$390.00 |
$294.87 |
$421.11 |
$400.00 |
$265.00 |
$375.00 |
$500.00 |
| 300 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 360 | SD |
$1.00 |
$4.72 |
$2.41 |
$2.00 |
$4.20 |
$2.15 |
$2.50 |
| 310 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,080 | SD |
$2.00 |
$4.42 |
$1.80 |
$2.00 |
$3.95 |
$1.60 |
$2.00 |
| 320 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,080 | SD |
$1.00 |
$0.9400 |
$2.41 |
$2.00 |
$0.8500 |
$2.15 |
$2.50 |
| 330 | 880(F)6700 |
DRUMS | 24,840 | SD |
$0.5000 |
$0.2400 |
$0.3600 |
$0.3500 |
$0.2500 |
$0.3500 |
$0.8000 |
| 340 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 388 | SD |
$23.00 |
$10.61 |
$18.05 |
$16.00 |
$9.40 |
$16.00 |
$22.50 |
| 350 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$33,000.00 |
$19,674.11 |
$15,019.29 |
$46,621.30 |
$70,000.00 |
$35,000.00 |
$28,500.00 |
| 360 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$4,128.26 |
$3,007.92 |
$10,000.00 |
$40,000.00 |
$2,500.00 |
$29,500.00 |
| 370 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$180,000.00 |
$143,352.36 |
$181,000.00 |
$215,000.00 |
$226,520.00 |
$227,000.00 |
$220,000.00 |