| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$67,000.00 |
$14,000.00 |
$3,100.00 |
$40,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 9,236 | CY |
$13.20 |
$25.00 |
$24.50 |
$22.00 |
$25.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$5,000.00 |
$16,000.00 |
$17,000.00 |
$20,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 7,367 | LF |
$3.06 |
$2.25 |
$2.40 |
$1.40 |
$5.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 448 | LF |
$16.46 |
$19.00 |
$19.00 |
$10.00 |
$20.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 7,530 | SY |
$4.78 |
$4.00 |
$4.25 |
$5.15 |
$6.00 |
| 70 | 233(A)0200 |
VEGETATIVE MULCHING | 2.53 | AC |
$1,756.37 |
$975.00 |
$975.00 |
$1,025.00 |
$1,500.00 |
| 80 | 303(A)1200 |
AGGREGATE BASE TYPE A | 1,892 | CY |
$87.29 |
$50.00 |
$57.00 |
$60.00 |
$75.00 |
| 90 | 310(B)5300 |
SUBGRADE, METHOD B | 8,512 | SY |
$3.72 |
$1.00 |
$2.15 |
$3.50 |
$8.00 |
| 100 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 8,370 | SY |
$5.82 |
$4.00 |
$5.00 |
$7.00 |
$7.00 |
| 110 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$46.80 |
$25.00 |
$40.00 |
$30.00 |
$75.00 |
| 120 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,411 | TON |
$131.54 |
$75.00 |
$88.25 |
$125.00 |
$110.00 |
| 130 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 3,052 | TON |
$150.80 |
$95.00 |
$119.35 |
$150.00 |
$135.00 |
| 140 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 143 | TON |
$214.98 |
$100.00 |
$205.00 |
$175.00 |
$225.00 |
| 150 | 411(I)2000 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 3 | TON |
$319.34 |
$600.00 |
$235.00 |
$485.00 |
$225.00 |
| 160 | 412 3100 |
COLD MILLING PAVEMENT | 13,089.03 | SY |
$5.61 |
$4.00 |
$4.10 |
$2.50 |
$5.00 |
| 170 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 514 | CY |
$31.06 |
$50.00 |
$20.00 |
$36.20 |
$30.00 |
| 180 | 501(G)1810 |
CLSM BACKFILL | 500 | CY |
$197.31 |
$125.00 |
$165.00 |
$150.00 |
$400.00 |
| 190 | 509(A)0200 |
CLASS AA CONCRETE | 82 | CY |
$1,012.91 |
$900.00 |
$975.00 |
$1,240.00 |
$1,300.00 |
| 200 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 5.66 | CY |
$1,276.45 |
$1,500.00 |
$1,100.00 |
$1,200.00 |
$750.00 |
| 210 | 509(D)0500 |
CLASS C CONCRETE | 58 | CY |
$540.86 |
$600.00 |
$525.00 |
$535.00 |
$650.00 |
| 220 | 511(A)2200 |
REINFORCING STEEL | 12,889 | LB |
$1.87 |
$2.00 |
$2.75 |
$2.20 |
$2.00 |
| 230 | 601(F)1610 |
TYPE IV GROUTED RIPRAP | 138 | SY |
$139.10 |
$100.00 |
$140.00 |
$170.00 |
$175.00 |
| 240 | 609(B)4315 |
COMBINED CURB & GUTTER(8" BARRIER) | 9,788 | LF |
$41.47 |
$23.00 |
$36.00 |
$26.00 |
$55.00 |
| 250 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 2,152 | SY |
$114.08 |
$130.00 |
$100.00 |
$108.00 |
$120.00 |
| 260 | 611(G)8000 |
INLET CDI RCB DES. 1 | 1 | EA |
$4,385.28 |
$4,500.00 |
$4,000.00 |
$3,800.00 |
$5,000.00 |
| 270 | 611(G)8004 |
INLET CDI RCB DES. 2 | 4 | EA |
$5,268.50 |
$5,000.00 |
$4,200.00 |
$3,900.00 |
$5,000.00 |
| 280 | 611(L)1600 |
JUNCTION BOXES | 152.95 | CF |
$154.34 |
$45.00 |
$65.00 |
$45.00 |
$250.00 |
| 290 | 613(A)5400 |
14" X 23" R.C.PIPE ELL. CLASS HE-III | 55 | LF |
$136.88 |
$130.00 |
$110.00 |
$195.00 |
$200.00 |
| 300 | 613(A)5404 |
19" X 30" R.C.PIPE ELL. CLASS HE-III | 102 | LF |
$150.61 |
$135.00 |
$130.00 |
$210.00 |
$215.00 |
| 310 | 613(A)5408 |
24" X 38" R.C.PIPE ELL. CLASS HE-III | 144 | LF |
$231.36 |
$155.00 |
$160.00 |
$215.00 |
$305.00 |
| 320 | 613(A)5424 |
43" X 68" R.C.PIPE ELL. CLASS HE-III | 68 | LF |
$180.00 |
$325.00 |
$400.00 |
$480.00 |
$250.00 |
| 330 | 613(EE)5965 |
15" CORRUGATED POLYPROPYLENE PIPE | 127 | LF |
$57.33 |
$95.00 |
$75.00 |
$100.00 |
$100.00 |
| 340 | 613(EE)5969 |
18" CORRUGATED POLYPROPYLENE PIPE | 500 | LF |
$61.15 |
$105.00 |
$80.00 |
$105.00 |
$100.00 |
| 350 | 613(EE)5973 |
24" CORRUGATED POLYPROPYLENE PIPE | 112 | LF |
$95.98 |
$120.00 |
$98.00 |
$160.00 |
$150.00 |
| 360 | 613(EE)5977 |
30" CORRUGATED POLYPROPYLENE PIPE | 61 | LF |
$134.45 |
$150.00 |
$145.00 |
$190.00 |
$200.00 |
| 370 | 613(EE)5981 |
36" CORRUGATED POLYPROPYLENE PIPE | 143 | LF |
$124.01 |
$170.00 |
$165.00 |
$220.00 |
$200.00 |
| 380 | 613(L)6704 |
15" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$362.36 |
$700.00 |
$775.00 |
$1,220.00 |
$450.00 |
| 390 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 18 | EA |
$724.01 |
$800.00 |
$915.00 |
$1,460.00 |
$1,000.00 |
| 400 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,502.89 |
$900.00 |
$1,050.00 |
$1,780.00 |
$2,500.00 |
| 410 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$2,385.02 |
$1,700.00 |
$2,115.00 |
$3,230.00 |
$3,000.00 |
| 420 | 613(L)6800 |
14" X 23" PREFAB. CULVERT END SEC., ELLI | 1 | EA |
$1,869.36 |
$1,300.00 |
$1,680.00 |
$2,000.00 |
$2,800.00 |
| 430 | 613(L)6804 |
19" X 30" PREFAB. CULVERT END SEC., ELLI | 2 | EA |
$1,974.89 |
$1,400.00 |
$1,820.00 |
$2,315.00 |
$2,800.00 |
| 440 | 613(L)6808 |
24" X 38" PREFAB. CULVERT END SEC., ELLI | 4 | EA |
$2,901.24 |
$1,600.00 |
$2,240.00 |
$3,040.00 |
$4,000.00 |
| 450 | 613(L)6824 |
43" X 68" PREFAB. CULVERT END SEC., ELLI | 2 | EA |
$4,500.00 |
$4,000.00 |
$5,400.00 |
$7,040.00 |
$6,200.00 |
| 460 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$85,000.00 |
$16,000.00 |
$50,442.07 |
$50,000.00 |
| 470 | 619(B)6300 |
REMOVAL OF HEADWALL | 2 | EA |
$1,842.28 |
$2,000.00 |
$2,400.00 |
$7,400.00 |
$1,500.00 |
| 480 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 54.05 | LF |
$16.46 |
$10.00 |
$22.00 |
$5.00 |
$25.00 |
| 490 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 2,497.72 | SY |
$10.91 |
$10.00 |
$12.50 |
$7.00 |
$15.00 |
| 500 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 2,032.72 | SY |
$16.07 |
$10.00 |
$15.00 |
$6.25 |
$15.00 |
| 510 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 2,702.61 | SY |
$7.90 |
$10.00 |
$15.00 |
$6.25 |
$17.00 |
| 520 | 805(A)3200 |
REMOVAL OF SIGN FOOTING | 28 | EA |
$137.36 |
$50.00 |
$270.00 |
$105.00 |
$135.00 |
| 530 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 22 | EA |
$142.65 |
$110.00 |
$108.00 |
$100.00 |
$125.00 |
| 540 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 144.84 | SF |
$40.21 |
$65.00 |
$65.00 |
$49.35 |
$75.00 |
| 550 | 851(C)2415 |
2" SQUARE TUBE POST | 424 | LF |
$10.62 |
$8.00 |
$7.55 |
$8.40 |
$15.00 |
| 560 | 855(A)7201 |
(SP) TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 11,932 | LF |
$1.27 |
$1.10 |
$1.05 |
$0.6500 |
$1.00 |
| 570 | 855(A)7209 |
(SP) TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 75 | LF |
$3.42 |
$2.20 |
$2.15 |
$1.35 |
$1.60 |
| 580 | 855(A)7217 |
(SP) TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 43 | LF |
$17.27 |
$30.00 |
$27.00 |
$3.95 |
$5.00 |
| 590 | 855(B)7313 |
(SP) TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 27 | EA |
$258.22 |
$230.00 |
$240.00 |
$235.00 |
$300.00 |
| 600 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 20 | SD |
$26.44 |
$22.00 |
$21.50 |
$18.90 |
$23.00 |
| 610 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 276 | LF |
$29.23 |
$25.00 |
$70.00 |
$24.00 |
$60.00 |
| 620 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 426 | LF |
$5.88 |
$10.00 |
$12.00 |
$1.60 |
$5.00 |
| 630 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,600 | SD |
$0.5300 |
$1.10 |
$1.05 |
$0.2100 |
$0.2000 |
| 640 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 960 | SD |
$1.38 |
$5.50 |
$6.00 |
$4.75 |
$4.50 |
| 650 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,080 | SD |
$1.79 |
$2.00 |
$1.65 |
$0.0300 |
$0.0200 |
| 660 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 9,280 | SD |
$1.03 |
$0.3000 |
$0.2700 |
$0.0600 |
$0.0500 |
| 670 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 19,440 | SD |
$0.5100 |
$0.3000 |
$0.2700 |
$0.0300 |
$0.0200 |
| 690 | 880(F)6700 |
DRUMS | 36,920 | SD |
$0.3100 |
$0.1000 |
$0.0500 |
$0.2500 |
$0.2200 |
| 700 | 880(I)7000 |
FLAGGER | 10 | SD |
$281.48 |
$600.00 |
$400.00 |
$575.00 |
$5.00 |
| 710 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 200 | SD |
$25.14 |
$25.00 |
$21.00 |
$16.80 |
$16.00 |
| 720 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$35,000.00 |
$27,000.00 |
$9,300.00 |
$35,000.00 |
| 730 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$1,750.00 |
$16,000.00 |
$3,500.00 |
| 740 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$150,676.83 |
$163,000.00 |
$115,000.00 |
$380,000.00 |