| 10 | 202(D)2500 |
UNCLASSIFIED BORROW | 5,452 | CY |
$12.00 |
$20.00 |
$21.00 |
$23.15 |
| 20 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$60,000.00 |
$150,000.00 |
$90,000.00 |
$114,665.04 |
| 30 | 209 9100 |
MACHINE GRADING | 165,209 | LF |
$2.00 |
$1.15 |
$3.15 |
$2.99 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 14,910 | LF |
$2.50 |
$3.25 |
$5.05 |
$4.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 7,560 | LF |
$13.00 |
$14.30 |
$13.25 |
$15.96 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 193,058 | SY |
$3.50 |
$3.20 |
$3.25 |
$4.35 |
| 70 | 310(B)5300 |
SUBGRADE, METHOD B | 211,489 | SY |
$2.00 |
$0.6000 |
$2.15 |
$2.16 |
| 80 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 38,720 | TON |
$100.00 |
$99.35 |
$113.29 |
$105.36 |
| 90 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 138,405 | LF |
$0.3500 |
$0.2900 |
$0.2500 |
$0.2800 |
| 100 | 509(A)0200 |
CLASS AA CONCRETE | 231 | CY |
$675.00 |
$725.00 |
$800.00 |
$828.00 |
| 110 | 510(C)1420 |
SLOPE WALL (4") | 280 | SY |
$200.00 |
$181.50 |
$112.00 |
$126.50 |
| 120 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 35,140 | LB |
$1.75 |
$1.90 |
$1.65 |
$1.78 |
| 130 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,000.00 |
$33,000.00 |
$12,540.00 |
$8,696.81 |
| 140 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 183,565 | SY |
$4.00 |
$1.80 |
$3.35 |
$4.49 |
| 150 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 14,084 | LF |
$6.00 |
$7.20 |
$7.25 |
$8.23 |
| 160 | 619(C)6600 |
SAWING PAVEMENT | 162 | LF |
$15.00 |
$1.25 |
$13.50 |
$18.73 |
| 170 | 623 1100 |
(PL)GUARDRAIL CURBING | 24 | EA |
$2,000.00 |
$1,700.00 |
$1,575.00 |
$1,782.50 |
| 180 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 22,763 | LF |
$32.00 |
$19.00 |
$19.50 |
$21.82 |
| 190 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 55 | EA |
$1,850.00 |
$1,586.00 |
$1,610.00 |
$1,823.90 |
| 200 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 75 | EA |
$3,250.00 |
$3,825.00 |
$3,900.00 |
$4,398.75 |
| 210 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 24 | EA |
$2,250.00 |
$3,802.00 |
$3,900.00 |
$4,372.30 |
| 220 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 2,518 | SD |
$15.00 |
$15.65 |
$15.25 |
$17.25 |
| 230 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 960 | SD |
$20.00 |
$1.05 |
$1.05 |
$1.10 |
| 240 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,760 | SD |
$1.00 |
$0.0200 |
$0.0500 |
$0.0300 |
| 250 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 8,640 | SD |
$2.00 |
$0.1000 |
$0.1000 |
$0.0600 |
| 260 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 7,680 | SD |
$3.00 |
$0.6800 |
$0.7500 |
$0.7200 |
| 270 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$3.00 |
$15.65 |
$15.50 |
$16.50 |
| 280 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 8,640 | SD |
$0.7500 |
$1.36 |
$1.40 |
$1.43 |
| 300 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 107,700 | SD |
$0.2500 |
$0.1300 |
$0.1500 |
$0.1300 |
| 310 | 880(G)6805 |
CHANNELIZER CONES | 91,560 | SD |
$0.1000 |
$1.04 |
$1.05 |
$1.10 |
| 320 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 480 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 330 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$20.00 |
$12.52 |
$12.25 |
$13.20 |
| 340 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 54 | EA |
$250.00 |
$166.95 |
$163.00 |
$184.00 |
| 350 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 210 | EA |
$70.00 |
$77.21 |
$75.25 |
$85.10 |
| 360 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 589 | EA |
$20.00 |
$15.65 |
$15.85 |
$17.99 |
| 370 | 856(A)8206 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 138,405 | LF |
$1.00 |
$0.7100 |
$1.25 |
$0.7800 |
| 380 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 138,405 | LF |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1700 |
| 390 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$95,000.00 |
$29,000.00 |
$26,105.00 |
| 400 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$15,000.00 |
$45,000.00 |
$16,000.00 |
$21,552.01 |
| 410 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$388,530.00 |
$375,000.00 |
$550,000.00 |
$649,597.96 |