| 10 | 202(D)2500 |
UNCLASSIFIED BORROW | 864 | CY |
$16.50 |
$15.00 |
$10.00 |
$47.75 |
$35.00 |
$38.21 |
$33.65 |
| 20 | 209 9100 |
MACHINE GRADING | 192,384 | LF |
$2.00 |
$2.00 |
$2.30 |
$1.50 |
$2.50 |
$0.8500 |
$2.75 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 18,859 | LF |
$2.50 |
$3.00 |
$4.50 |
$1.00 |
$2.10 |
$3.80 |
$3.00 |
| 40 | 221(E)2600 |
TEMPORARY SILT DIKE | 6,930 | LF |
$14.00 |
$15.00 |
$25.00 |
$1.00 |
$12.00 |
$19.69 |
$15.85 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 63,209 | SY |
$2.90 |
$4.00 |
$3.20 |
$6.50 |
$2.00 |
$5.09 |
$4.20 |
| 60 | 310(B)5300 |
SUBGRADE, METHOD B | 290,221 | SY |
$1.80 |
$1.00 |
$4.00 |
$1.55 |
$1.85 |
$2.11 |
$2.50 |
| 70 | 407(B)7300 |
TACK COAT | 90 | GAL |
$5.50 |
$3.00 |
$12.00 |
$4.00 |
$6.00 |
$12.73 |
$31.15 |
| 80 | 408 8100 |
PRIME COAT | 101,568 | GAL |
$3.60 |
$3.00 |
$2.50 |
$0.0500 |
$2.85 |
$4.75 |
$5.10 |
| 90 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 59,701 | TON |
$105.00 |
$89.00 |
$95.00 |
$119.25 |
$132.90 |
$111.73 |
$115.00 |
| 100 | 545 0101 |
(PL)REPLACE BRIDGE ITEMS | 7 | EA |
$4,000.00 |
$19,500.00 |
$10,000.00 |
$14,750.00 |
$5,400.00 |
$16,167.85 |
$11,622.15 |
| 110 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 253,969 | SY |
$4.30 |
$6.50 |
$3.00 |
$3.50 |
$3.00 |
$4.75 |
$4.60 |
| 120 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 194 | SY |
$6.00 |
$20.00 |
$15.00 |
$25.00 |
$12.00 |
$15.67 |
$6.35 |
| 130 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 16,272 | LF |
$7.00 |
$10.00 |
$10.00 |
$6.00 |
$9.68 |
$10.73 |
$8.95 |
| 140 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 16,712.5 | LF |
$31.00 |
$24.00 |
$26.00 |
$25.00 |
$26.45 |
$29.24 |
$24.50 |
| 150 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 47 | EA |
$1,870.00 |
$1,400.00 |
$2,000.00 |
$1,575.00 |
$1,667.05 |
$1,853.82 |
$1,537.00 |
| 160 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 55 | EA |
$4,400.00 |
$3,500.00 |
$4,200.00 |
$3,500.00 |
$3,961.75 |
$4,385.68 |
$3,651.70 |
| 170 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$4,000.00 |
$3,000.00 |
$3,700.00 |
$3,500.00 |
$3,717.95 |
$4,178.30 |
$3,427.00 |
| 180 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 189,627 | LF |
$0.2000 |
$0.2500 |
$0.2800 |
$0.5000 |
$0.2500 |
$0.2700 |
$0.4000 |
| 190 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 76 | EA |
$215.00 |
$100.00 |
$400.00 |
$400.00 |
$4.14 |
$438.91 |
$381.60 |
| 200 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 360 | EA |
$48.00 |
$70.00 |
$85.00 |
$82.50 |
$87.40 |
$92.66 |
$80.55 |
| 210 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 415 | EA |
$20.00 |
$20.00 |
$22.00 |
$20.00 |
$18.80 |
$19.93 |
$17.50 |
| 220 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 192,405 | LF |
$0.7000 |
$0.7000 |
$0.8000 |
$0.7000 |
$0.7200 |
$0.7700 |
$1.00 |
| 230 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 192,405 | LF |
$0.2000 |
$0.2500 |
$0.1800 |
$0.1500 |
$0.1500 |
$0.1600 |
$0.2000 |
| 240 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 1,000 | SD |
$25.00 |
$30.00 |
$65.00 |
$75.00 |
$85.00 |
$79.25 |
$88.00 |
| 250 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 200 | SD |
$8.00 |
$30.00 |
$40.00 |
$60.00 |
$46.00 |
$48.77 |
$42.50 |
| 260 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,230 | SD |
$0.8000 |
$0.5000 |
$0.1000 |
$0.0500 |
$0.1200 |
$0.1200 |
$0.1500 |
| 270 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,800 | SD |
$1.00 |
$0.5000 |
$0.2000 |
$0.0500 |
$0.2300 |
$0.2400 |
$0.2000 |
| 280 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,750 | SD |
$2.00 |
$0.7500 |
$0.5500 |
$0.2500 |
$0.6300 |
$0.6700 |
$0.7500 |
| 290 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 2,000 | SD |
$2.00 |
$0.5000 |
$0.4000 |
$0.3000 |
$0.4600 |
$0.4900 |
$0.5000 |
| 300 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 3,200 | SD |
$0.7000 |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1200 |
$0.1200 |
$0.1500 |
| 310 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 2,830 | SD |
$0.6000 |
$0.5000 |
$0.7000 |
$0.6000 |
$0.8000 |
$0.8500 |
$1.00 |
| 320 | 880(F)6700 |
DRUMS | 5,600 | SD |
$0.5000 |
$0.4000 |
$0.5000 |
$0.1000 |
$0.5700 |
$0.6100 |
$0.6000 |
| 330 | 880(G)6805 |
CHANNELIZER CONES | 24,300 | SD |
$0.5000 |
$0.4500 |
$0.5500 |
$1.00 |
$0.6300 |
$0.6700 |
$0.6000 |
| 340 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 800 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 350 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 956 | SD |
$18.00 |
$10.00 |
$7.00 |
$6.50 |
$8.05 |
$8.53 |
$7.50 |
| 360 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$78,442.00 |
$60,000.00 |
$25,000.00 |
$35,000.00 |
$69,828.16 |
$37,100.00 |
| 370 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$35,000.00 |
$3,500.00 |
$7,500.00 |
$3,500.00 |
$12,189.46 |
$15,900.00 |
| 380 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$481,400.00 |
$485,825.50 |
$200,000.00 |
$509,251.05 |
$235,000.00 |
$705,505.76 |
$682,565.25 |