| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$2,702.43 |
$50,000.00 |
$25,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 1,987 | CY |
$17.00 |
$13.95 |
$50.00 |
$38.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$2,383.91 |
$30,000.00 |
$40,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 6,042 | LF |
$3.00 |
$3.96 |
$4.00 |
$2.50 |
| 50 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 4 | EA |
$460.00 |
$355.05 |
$350.00 |
$500.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 4,205 | SY |
$5.00 |
$5.34 |
$5.50 |
$4.25 |
| 70 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,907 | TON |
$41.00 |
$55.21 |
$55.00 |
$80.00 |
| 80 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 134 | SY |
$156.50 |
$115.03 |
$65.00 |
$71.50 |
| 90 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 24 | CY |
$300.00 |
$260.15 |
$300.00 |
$181.50 |
| 100 | 504(F)5600 |
HANDRAILING | 227 | LF |
$218.00 |
$123.72 |
$150.00 |
$137.50 |
| 110 | 509(B)0300 |
CLASS A CONCRETE | 23 | CY |
$900.00 |
$1,136.20 |
$1,000.00 |
$660.00 |
| 120 | 509(D)0500 |
CLASS C CONCRETE | 15 | CY |
$527.00 |
$932.49 |
$750.00 |
$159.50 |
| 130 | 609 4100 |
(PL) PARKING BLOCK | 1 | EA |
$220.00 |
$469.39 |
$250.00 |
$100.00 |
| 140 | 609(B)4360 |
2'-8" COMB.CRB.& GUT.(6" BARRIER) | 8,271 | LF |
$40.00 |
$28.05 |
$40.00 |
$45.10 |
| 150 | 610(A)5200 |
4" CONCRETE SIDEWALK | 5,438 | SY |
$75.00 |
$77.96 |
$100.00 |
$99.00 |
| 160 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 3,627 | SY |
$100.00 |
$132.71 |
$120.00 |
$99.00 |
| 170 | 610(B)5320 |
8" CONCRETE DRIVEWAY | 275 | SY |
$109.00 |
$168.05 |
$150.00 |
$99.00 |
| 180 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 687 | SF |
$37.50 |
$47.47 |
$50.00 |
$22.00 |
| 190 | 610(J)6100 |
(PL) STAMPED CONCRETE FINISH | 369 | SY |
$132.50 |
$173.77 |
$150.00 |
$104.50 |
| 200 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 43 | LF |
$68.50 |
$129.72 |
$75.00 |
$125.00 |
| 210 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$2,085.00 |
$1,895.82 |
$2,000.00 |
$5,000.00 |
| 220 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$3,097.05 |
$50,000.00 |
$25,000.00 |
| 230 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 1,254 | LF |
$11.00 |
$11.54 |
$15.00 |
$22.00 |
| 240 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 4,655 | SY |
$8.00 |
$6.70 |
$15.00 |
$20.00 |
| 250 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 1,894 | SY |
$15.50 |
$14.73 |
$15.00 |
$30.00 |
| 260 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 539 | SY |
$11.00 |
$5.76 |
$15.00 |
$25.00 |
| 270 | 619(B)6404 |
REMOVAL OF SIDEWALK | 1,394 | SY |
$14.50 |
$11.09 |
$15.00 |
$25.00 |
| 280 | 619(C)6600 |
SAWING PAVEMENT | 9,561 | LF |
$3.75 |
$6.63 |
$5.00 |
$7.50 |
| 290 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 4 | EA |
$276.00 |
$186.87 |
$300.00 |
$225.00 |
| 300 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 4 | EA |
$145.00 |
$85.94 |
$100.00 |
$94.00 |
| 310 | 629(E)7600 |
MAILBOX | 4 | EA |
$140.00 |
$62.29 |
$200.00 |
$70.00 |
| 320 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 120 | SD |
$46.85 |
$6.23 |
$24.00 |
$50.00 |
| 330 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$9.50 |
$0.0200 |
$12.00 |
$50.00 |
| 340 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,400 | SD |
$0.7000 |
$0.9300 |
$1.20 |
$1.00 |
| 350 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.50 |
$2.49 |
$2.40 |
$3.00 |
| 360 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,160 | SD |
$2.00 |
$3.74 |
$3.60 |
$4.00 |
| 370 | 880(C)6405 |
CONSTRUCTION BARRICADES(TYPE II) | 720 | SD |
$1.80 |
$1.25 |
$1.20 |
$3.00 |
| 380 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$1.70 |
$2.49 |
$2.40 |
$3.00 |
| 390 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 5,760 | SD |
$0.5000 |
$0.1000 |
$0.6000 |
$0.5000 |
| 400 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 1,200 | SD |
$0.4500 |
$0.0600 |
$0.3000 |
$0.5000 |
| 410 | 880(F)6700 |
DRUMS | 1,200 | SD |
$0.5000 |
$1.25 |
$0.6000 |
$2.00 |
| 420 | 880(G)6805 |
CHANNELIZER CONES | 1,920 | SD |
$0.8000 |
$1.25 |
$0.3000 |
$2.50 |
| 430 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$20.00 |
$31.15 |
$18.00 |
$40.00 |
| 440 | 890 1100 |
(PL)TRAFFIC ITEMS | 1 | LSUM |
$3,750.00 |
$9,343.52 |
$5,000.00 |
$30,000.00 |
| 450 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$370.00 |
$249.16 |
$540.00 |
$360.00 |
| 460 | 836 7110 |
RECTANGULAR RAPID FLASHING BEACON | 2 | EA |
$17,400.00 |
$15,572.53 |
$12,500.00 |
$15,000.00 |
| 470 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 419 | SF |
$45.00 |
$24.92 |
$50.00 |
$30.00 |
| 480 | 851(C)2415 |
2" SQUARE TUBE POST | 602 | LF |
$12.00 |
$14.95 |
$30.00 |
$15.00 |
| 490 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 144 | LF |
$15.50 |
$14.95 |
$42.00 |
$16.00 |
| 500 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 2,000 | LF |
$2.00 |
$1.25 |
$2.40 |
$2.50 |
| 510 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 1,420 | LF |
$2.25 |
$1.87 |
$4.80 |
$2.50 |
| 520 | 856(A)8208 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,837 | LF |
$2.25 |
$6.23 |
$7.20 |
$7.00 |
| 530 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 900 | LF |
$12.00 |
$12.46 |
$18.00 |
$15.00 |
| 540 | 856(B)8308 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 3 | EA |
$610.00 |
$622.90 |
$300.00 |
$600.00 |
| 550 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 6,000 | LF |
$0.5500 |
$0.6200 |
$1.20 |
$1.35 |
| 560 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$24,916.04 |
$25,000.00 |
$75,000.00 |
| 570 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$112,000.00 |
$85,839.17 |
$145,000.00 |
$148,175.00 |