Bid tab 220235

Let Jul 14, 2022 · Division 8 · Tulsa Sign up free

‹ Jul 2022 results

PAVEMENT REHABILITATION (P.C. CONCRETE) SH-51: FROM 0.2 MILES EAST OF THE I -444 INTERCHANGE, EXTEND EAST IN TULSA . PROJECT LENGTH = 0.984 MILE

Let date
Thursday, July 14, 2022
Contract
220235
J/P numbers
26303(08)
District
Division 8
County
Tulsa
Highway
Limits
PAVEMENT REHABILITATION (P.C. CONCRETE) SH-51: FROM 0.2 MILES EAST OF THE I -444 INTERCHANGE, EXTEND EAST IN TULSA . PROJECT LENGTH = 0.984 MILE
Project number
NHPP-015N(034)PM

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$15,190,258
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $15,308,698 +0.8%
2 DUIT CONSTRUCTION COMPANY, INC. $15,367,083 +1.2% +0.4%

Bid tab: unit prices 103 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 DUIT CONSTRUCTI…
10202(A)2200 UNCLASSIFIED EXCAVATION12,423CY $15.00 $42.26 $22.00
20202(D)2500 UNCLASSIFIED BORROW1,000CY $15.00 $25.40 $1.00
30205(A)6200 TYPE A-SALVAGED TOPSOIL1LSUM $53,200.00 $28,196.26 $75,000.00
40221(B)2300 TEMPORARY SILT FENCE12,000LF $2.00 $3.50 $2.40
50221(C)2400 TEMPORARY SEDIMENT FILTER16EA $300.00 $400.00 $420.68
60221(H)2900 (PL)TEMPORARY INLET SEDIMENT FILTER17EA $700.00 $400.00 $420.68
70230(A)7200 SOLID SLAB SODDING7,700SY $4.00 $3.94 $3.14
80241 3100 MOWING30.28AC $100.00 $250.00 $265.19
90303(A)1200 AGGREGATE BASE TYPE A14,217CY $65.00 $51.13 $65.00
100307(K)4200 STABILIZED SUBGRADE84,781SY $6.00 $5.35 $7.50
110317 7100 CEMENT TREATED BASE84,134SY $19.00 $16.34 $16.50
120326(A)1200 GEOTEXTILE REINFORCEMENT179,962SY $2.00 $1.10 $1.74
130402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E749TON $53.00 $25.08 $24.24
140414(A)5200 P.C.CONCRETE PAVEMENT(PLACEMENT)28,691SY $20.00 $18.36 $20.00
150414(B)5300 DOWEL JOINTED P.C.C.PAVT.(PLACEMENT)51,584SY $30.00 $27.93 $30.00
160414(G)5800 P.C. CONCRETE FOR PAVEMENT20,502CY $150.00 $159.45 $145.00
170609(A)4220 CONC.CURB(4" MNTBLE-INTEGRAL)3,588LF $8.00 $1.27 $7.00
180611(G)8155 INLET - LONG. BARRIER - TYPE I, DES.24EA $3,000.00 $5,922.71 $4,597.06
190611(G)8170 INLET - LONG. BARRIER - TYPE II, DES. 17EA $5,000.00 $3,331.27 $3,883.58
200611(G)8175 INLET - LONG. BARRIER - TYPE II, DES.21EA $5,000.00 $5,666.36 $6,615.03
210611(H)0400 ADDITIONAL DEPTH IN INLET34VF $350.00 $200.00 $198.55
220611(I)1000 RPLC INLT FRM&GRT(SSIF-FRM,CIG-GRT-VG-F)14EA $2,200.00 $840.17 $544.67
230611(M)1700 REPLACEMENT OF CAST IRON HOOD51EA $550.00 $576.14 $341.40
240612(C)3400 INLET ADJUST TO GRADE13EA $1,400.00 $1,716.48 $1,625.96
250613(J)6400 EDGE DRAIN CONDUIT-PERFORATED15,326LF $15.00 $14.81 $14.00
260613(K)6500 EDGE DRAIN OUTLET LATERAL-NONPERFORATED5,870LF $16.00 $16.00 $14.00
270613(Q)7500 OUTLET LATERAL HEADWALL78EA $500.00 $475.00 $600.00
280619(A)6200 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $8,940.00 $29,952.76 $150,000.00
290619(B)6356 REMOVAL OF CURB AND GUTTER9,965LF $5.00 $8.10 $7.00
300619(B)6360 REMOVAL OF CONCRETE PAVEMENT40,260SY $7.00 $6.54 $11.00
310619(B)6364 REMOVAL OF ASPHALT PAVEMENT20,765SY $4.00 $7.10 $5.00
320619(B)6368 REMOVAL OF DRAINAGE INLETS12EA $700.00 $665.90 $400.00
330619(B)6376 REMOVAL OF CONC.PAV.W/ASPH.OVERLAY10,520SY $10.00 $9.70 $12.00
340619(B)6396 REMOVAL OF GUARDRAIL3,750LF $5.00 $5.68 $13.78
350619(B)6416 REMOVAL OF CONCRETE MEDIAN BARRIER115LF $16.00 $23.76 $25.00
360619(B)6476 REMOVAL OF EXISTING PARAPET2,500LF $100.00 $56.69 $35.00
370619(C)6600 SAWING PAVEMENT23,700LF $4.00 $3.41 $2.00
380623(I)2050 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")1EA $7,000.00 $6,015.61 $4,260.00
390627(A)6200 CONCRETE LONGITUDINAL BARRIER, DESIGN 14,744LF $78.00 $81.26 $50.00
400805(D)3504 (PL)REMOVE & RESET LIGHT POLE3EA $1,674.00 $18,715.25 $14,910.00
410853 5160 BARRIER DELINEATORS(TYPE 1, CODE 1)98EA $20.00 $29.60 $23.43
420871(A)2200 IMPACT ATTENUATOR12EA $25,200.00 $43,060.28 $34,080.00
430504(A)5200 APPROACH SLAB725SY $350.00 $305.97 $286.43
440504(B)5300 SAW-CUT GROOVING705.8SY $10.00 $6.42 $5.11
450504(E)5520 42" F-SHAPED PARAPET549LF $150.00 $81.26 $96.00
470511 2100 MECHANICAL SPLICES90EA $74.00 $56.32 $121.78
490515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)484.6SY $7.00 $6.02 $4.79
500518(B)0300 SEALED EXPANSION JOINTS159.8LF $500.00 $399.01 $323.59
510619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $20,000.00 $8,392.24 $30,000.00
530504(E)5500 CONCRETE PARAPET1,466LF $230.00 $121.44 $98.00
540515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)1,047.1SY $7.00 $6.02 $4.79
550619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $6,000.00 $8,392.24 $25,000.00
560504(E)5520 42" F-SHAPED PARAPET1,984LF $150.00 $81.26 $96.00
570515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)1,763.6SY $7.00 $6.02 $4.79
580619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $10,000.00 $8,392.24 $25,000.00
590504(E)5520 42" F-SHAPED PARAPET650LF $150.00 $81.26 $96.00
600515(A)7200 WATER REPELLENT (VISUALLY INSPECTED)534.2SY $7.00 $6.02 $4.79
610619(B)6304 REMOVAL OF BRIDGE ITEMS1LSUM $3,000.00 $8,392.24 $25,000.00
620854(A)6200 TRAFFIC STRIPE(PAINT)(4" WIDE)70,638LF $0.2000 $0.3800 $0.3000
630857(C)9400 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)60,432LF $0.8000 $1.82 $1.44
640857(F)9700 PAVEMENT MRKNG.REMOVAL(TRAF.STRP)76,329LF $0.2500 $0.5800 $0.4600
650858(A)0224 PAVE.MARKERS CLASS A TYPE 2-C9,692EA $5.00 $9.89 $7.83
660858(A)0228 PAVE.MARKERS CLASS A TYPE 2-D3,922EA $5.00 $9.89 $7.83
670871(B)2300 CONST.ZONE IMPACT ATTEN.2,355SD $10.00 $53.83 $42.60
680876(A)3210 (PL)TRUCK MOUNTED ATTENUATOR40SD $25.00 $94.20 $74.55
690877(B)4300 DELIVER PORTABLE LONGITUDINAL BARRIER9,930LF $24.00 $12.91 $48.00
700877(C)4400 RELOCATION OF PORT. LONGITUDINAL BARRIER11,874LF $4.50 $1.78 $3.00
710877(D)4500 (PL) PORTABLE LONGITUDINAL BARRIER DELINEATOR478,620SD $0.0500 $0.0100 $0.0200
720880(A)6220 ARROW DISPLAY(TYPE C)985SD $6.00 $1.35 $1.07
730880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF10,220SD $0.5000 $0.2000 $0.1600
740880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,105SD $1.00 $7.00 $5.54
750880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF14,935SD $1.50 $7.00 $5.54
760880(B)6340 VARIABLE SPEED LIMIT SIGN6,000SD $12.50 $10.77 $8.52
770880(C)6410 CONSTRUCTION BARRICADES(TYPE III)3,655SD $2.00 $1.35 $1.07
780880(E)6607 WARNING LIGHTS(TYPE B)35,165SD $0.2500 $0.0700 $0.0500
790880(E)6616 WARNING LIGHTS(TYPE D)96,710SD $0.2500 $0.0300 $0.0200
800880(E)6625 (PL) WARNING LIGHTS (HIGH INTENSITY)(SEQUENTIAL FLASHING)20,230SD $0.5000 $0.1300 $0.1100
810880(F)6700 DRUMS103,880SD $0.2500 $0.0300 $0.0200
820880(G)6800 TUBE CHANNELIZERS61,680SD $0.2500 $0.6700 $0.5300
830880(G)6805 CHANNELIZER CONES13,820SD $0.2500 $0.6700 $0.5300
840880(L)7310 (SP) TRAFFIC SURVEILLANCE, OHP (NON-BID)4,800HOUR $69.00 $69.00 $69.00
850882 8100 (SP)SMART WORK ZONE SYSTEM600SD $100.00 $168.21 $133.13
860882 8105 (SP)SMART WK. ZONE SYS.-PORT.CHNG.MSG.SN30,600SD $12.50 $18.84 $14.91
870882 8110 (SP)SMART WK. ZONE SYS.-PORT.TRAF.SENSOR24,000SD $12.50 $16.15 $12.78
880882 8115 (SP)SMART WK ZONE SYS-PAN-TILT-ZOOM CMRA1,200SD $15.00 $67.28 $53.25
890882 8120 (SP)SMART WK. ZONE SYS.-WEBSITE SYSTEM600SD $25.00 $134.57 $106.50
900804(A)2200 STRUCTURAL CONCRETE9CY $920.00 $491.15 $388.73
910804(B)2300 REINFORCING STEEL1,226LB $2.25 $3.03 $2.40
920805(A)3200 REMOVAL OF SIGN FOOTING5EA $125.00 $672.82 $532.50
930805(A)3252 (PL)REMOVAL OF EXISTING SIGNS19EA $125.00 $437.33 $346.13
940805(D)3532 (PL)REMOVE & RESET OVERHEAD SIGN STR.1EA $7,500.00 $111,283.92 $88,075.50
950850(A)1200 SHEET ALUMINUM SIGNS376SF $25.00 $51.13 $40.47
960850(B)1310 EXTRUDED ALUMINUM PANEL SIGNS208SF $27.50 $60.55 $47.93
970850(B)1320 EXTR.ALUM.PAN.SGN.(OVRHD SIGNS)228SF $40.00 $69.97 $55.38
980851(A)2200 4"@13 GALV.STL.WD.FLANGE BM.POST175LF $39.00 $48.44 $38.34
990851(B)2310 2 1/2"@5.79 GALV.STL.PIPE POST376LF $21.00 $29.60 $23.43
1,000851(C)2415 2" SQUARE TUBE POST264LF $9.25 $9.42 $7.46
1,010856(A)8204 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)42,284LF $0.6000 $1.48 $1.17
1,020856(A)8208 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)8,824LF $1.20 $2.15 $1.70
1,030856(A)8212 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)2,127LF $2.50 $4.17 $3.30
1,040642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $137,236.25 $175,000.00
1,050220 1100 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $3,342.01 $6,500.00
1,060641 2110 MOBILIZATION1LSUM $941,725.53 $658,265.09 $670,000.00