| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 215 | CY |
$15.00 |
$18.47 |
$20.00 |
$46.92 |
$25.00 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 503 | CY |
$20.00 |
$21.00 |
$25.00 |
$27.15 |
$20.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$8,079.00 |
$10,000.00 |
$19,639.57 |
$9,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 2,692 | LF |
$3.00 |
$3.00 |
$3.30 |
$2.00 |
$3.35 |
| 50 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 2 | EA |
$600.00 |
$112.00 |
$440.00 |
$1,645.50 |
$400.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 132 | LF |
$13.00 |
$8.00 |
$20.00 |
$27.77 |
$20.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 2,630 | SY |
$4.00 |
$4.00 |
$8.00 |
$3.75 |
$8.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.54 | AC |
$850.00 |
$200.00 |
$900.00 |
$8,054.17 |
$800.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 419 | CY |
$60.00 |
$70.00 |
$74.00 |
$58.99 |
$45.00 |
| 100 | 326(B)1300 |
GEOGRID REINFORCEMENT | 50 | SY |
$8.00 |
$4.86 |
$10.00 |
$49.70 |
$5.00 |
| 110 | 504(F)5600 |
HANDRAILING | 296 | LF |
$250.00 |
$175.00 |
$200.00 |
$199.99 |
$200.00 |
| 120 | 509(A)0200 |
CLASS AA CONCRETE | 122 | CY |
$600.00 |
$410.00 |
$540.00 |
$599.00 |
$650.00 |
| 130 | 509(B)0300 |
CLASS A CONCRETE | 59 | CY |
$560.00 |
$375.00 |
$600.00 |
$558.39 |
$650.00 |
| 140 | 511(A)2200 |
REINFORCING STEEL | 6,220 | LB |
$1.60 |
$2.50 |
$2.25 |
$1.58 |
$1.50 |
| 150 | 609(B)4330 |
1'-8" COMB.CRB.& GUT.(6" BARRIER) | 1,720 | LF |
$27.50 |
$31.00 |
$26.00 |
$42.51 |
$35.00 |
| 160 | 610(A)5200 |
4" CONCRETE SIDEWALK | 2,461 | SY |
$60.00 |
$53.00 |
$63.00 |
$38.46 |
$75.00 |
| 170 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 947 | SY |
$70.00 |
$75.00 |
$90.00 |
$87.33 |
$80.00 |
| 180 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 178 | SF |
$30.00 |
$30.00 |
$40.00 |
$41.83 |
$25.00 |
| 190 | 611(G)7754 |
INLET CI DES. 2 (STD) | 1 | EA |
$4,400.00 |
$5,500.00 |
$5,600.00 |
$3,049.52 |
$6,000.00 |
| 200 | 611(G)8024 |
INLET CDI RCB DES. 7 | 1 | EA |
$5,000.00 |
$6,500.00 |
$9,100.00 |
$4,177.96 |
$5,000.00 |
| 210 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 168 | LF |
$12.00 |
$12.00 |
$10.00 |
$33.14 |
$13.00 |
| 220 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 410 | SY |
$15.00 |
$6.00 |
$10.00 |
$22.75 |
$12.00 |
| 230 | 619(B)6368 |
REMOVAL OF DRAINAGE INLETS | 2 | EA |
$800.00 |
$2,400.00 |
$500.00 |
$1,670.08 |
$300.00 |
| 240 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 166 | SY |
$15.00 |
$15.00 |
$10.00 |
$68.99 |
$15.00 |
| 250 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 495 | SY |
$10.00 |
$12.00 |
$10.00 |
$47.69 |
$15.00 |
| 260 | 619(B)6400 |
REMOVAL OF CURB | 38 | LF |
$20.00 |
$20.00 |
$10.00 |
$87.90 |
$25.00 |
| 270 | 619(B)6404 |
REMOVAL OF SIDEWALK | 668 | SY |
$7.00 |
$14.00 |
$10.00 |
$28.27 |
$9.50 |
| 280 | 619(C)6600 |
SAWING PAVEMENT | 1,298 | LF |
$5.00 |
$7.50 |
$3.00 |
$8.64 |
$8.00 |
| 290 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 180 | SD |
$0.4000 |
$1.22 |
$2.00 |
$1.29 |
$1.00 |
| 300 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,720 | SD |
$0.5000 |
$1.22 |
$4.00 |
$2.58 |
$2.00 |
| 310 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 540 | SD |
$1.00 |
$0.0800 |
$2.00 |
$1.29 |
$1.00 |
| 320 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 540 | SD |
$0.4000 |
$0.8500 |
$2.00 |
$1.29 |
$1.00 |
| 330 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 1,380 | SD |
$0.4000 |
$0.0200 |
$1.00 |
$0.7100 |
$0.5000 |
| 340 | 880(F)6700 |
DRUMS | 1,800 | SD |
$0.2500 |
$0.0200 |
$1.10 |
$0.7100 |
$0.5500 |
| 350 | 880(G)6805 |
CHANNELIZER CONES | 8,820 | SD |
$0.5000 |
$1.15 |
$1.10 |
$0.7100 |
$0.5500 |
| 360 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$250.00 |
$300.00 |
$550.00 |
$645.84 |
$500.00 |
| 370 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 50 | SF |
$25.00 |
$90.00 |
$22.00 |
$15.50 |
$20.00 |
| 380 | 851(C)2415 |
2" SQUARE TUBE POST | 48 | LF |
$10.00 |
$14.00 |
$14.00 |
$15.50 |
$12.00 |
| 390 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 491 | LF |
$8.00 |
$16.00 |
$28.00 |
$32.29 |
$25.00 |
| 400 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$10,000.00 |
$19,793.82 |
$30,000.00 |
| 410 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$500.00 |
$3,500.00 |
$5,812.59 |
$1,500.00 |
| 420 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$56,000.00 |
$50,000.00 |
$60,000.00 |
$53,500.00 |
$50,500.00 |