BRIDGE AND APPROACHES COUNTY ROADS : OVER MULTIPLE CREEKS AT VARIOUS LOCATIONS IN GRANT COUNTY . PROJECT LENGTH = 3.318 MILES

Let date
Thursday, January 20, 2022
Contract
220046
J/P numbers
34557(04)
District
Division 4
County
Grant
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROADS : OVER MULTIPLE CREEKS AT VARIOUS LOCATIONS IN GRANT COUNTY . PROJECT LENGTH = 3.318 MILES
Project number
STP-227D(030)CI

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$10,788,861
1 BRIDGECO CONTRACTORS, INC. Low bidder $11,704,854 +8.5%
2 DOWNEY CONTRACTING, LLC $12,697,079 +17.7% +8.5%
3 MANHATTAN ROAD & BRIDGE COMPANY, LLC $13,719,717 +27.2% +17.2%

Bid tab: unit prices 627 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BRIDGECO CONTRA…#2 DOWNEY CONTRACT…#3 MANHATTAN ROAD …
10201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $6,414.26 $10,000.00
20202(A)2200 UNCLASSIFIED EXCAVATION51CY $12.00 $7.00 $14.60 $40.00
30202(D)2500 UNCLASSIFIED BORROW1,910CY $10.00 $8.70 $17.30 $12.00
40205(A)6210 TYPE A-SALVAGED TOPSOIL356CY $15.00 $6.50 $5.33 $7.00
50221(B)2300 TEMPORARY SILT FENCE1,239LF $3.00 $5.25 $2.61 $6.00
60221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
70232(A)9200 SEEDING METHOD A0.2AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
80233(A)0200 VEGETATIVE MULCHING0.61AC $775.00 $6,400.00 $5,766.12 $6,300.00
90402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E306TON $35.00 $57.15 $47.85 $52.00
100619(B)6352 REMOVAL OF FENCE664LF $3.00 $2.00 $1.64 $4.00
110624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)668LF $8.00 $11.80 $11.42 $11.00
120201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,651.84 $10,967.90
130202(A)2200 UNCLASSIFIED EXCAVATION248CY $12.00 $7.00 $14.60 $33.00
140205(A)6210 TYPE A-SALVAGED TOPSOIL338CY $15.00 $6.50 $5.33 $6.00
150221(B)2300 TEMPORARY SILT FENCE1,288LF $3.00 $5.25 $2.61 $6.00
160221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
170232(A)9200 SEEDING METHOD A0.56AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
180233(A)0200 VEGETATIVE MULCHING0.56AC $775.00 $6,400.00 $5,766.12 $6,300.00
190402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E320TON $35.00 $57.15 $47.85 $52.00
200201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,682.40 $10,000.00
210202(A)2200 UNCLASSIFIED EXCAVATION30CY $12.00 $7.00 $14.60 $40.00
220202(D)2500 UNCLASSIFIED BORROW911CY $10.00 $8.70 $17.30 $13.00
230205(A)6210 TYPE A-SALVAGED TOPSOIL292CY $15.00 $6.50 $5.33 $7.00
240221(B)2300 TEMPORARY SILT FENCE1,132LF $3.00 $5.25 $2.61 $6.00
250221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
260232(A)9200 SEEDING METHOD A0.09AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
270233(A)0200 VEGETATIVE MULCHING0.5AC $775.00 $6,400.00 $5,766.12 $6,300.00
280402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E279TON $35.00 $57.15 $47.85 $52.00
290201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,363.54 $10,000.00
300202(A)2200 UNCLASSIFIED EXCAVATION113CY $12.00 $7.00 $14.60 $30.00
310202(D)2500 UNCLASSIFIED BORROW2,684CY $10.00 $8.70 $17.30 $12.00
320205(A)6210 TYPE A-SALVAGED TOPSOIL448CY $15.00 $6.50 $5.33 $10.00
330221(B)2300 TEMPORARY SILT FENCE1,548LF $3.00 $5.25 $2.61 $6.00
340221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
350232(A)9200 SEEDING METHOD A0.31AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
360233(A)0200 VEGETATIVE MULCHING0.71AC $775.00 $6,400.00 $5,766.12 $6,300.00
370402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E388TON $35.00 $57.15 $47.85 $52.00
380201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $6,000.00
390202(A)2200 UNCLASSIFIED EXCAVATION115CY $12.00 $7.00 $14.60 $14.00
400202(D)2500 UNCLASSIFIED BORROW261CY $10.00 $12.00 $17.30 $16.00
410205(A)6210 TYPE A-SALVAGED TOPSOIL307CY $15.00 $6.50 $5.33 $14.00
420221(B)2300 TEMPORARY SILT FENCE1,145LF $3.00 $5.25 $2.61 $6.00
430221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
440232(A)9200 SEEDING METHOD A0.1AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
450233(A)0200 VEGETATIVE MULCHING0.51AC $775.00 $6,400.00 $5,766.12 $6,300.00
460402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E296TON $35.00 $57.15 $47.85 $55.00
470613(B)5516 24" CORR. GALV. STEEL PIPE44LF $46.75 $69.00 $77.05 $70.00
480613(B)5528 36" CORR. GALV. STEEL PIPE56LF $71.25 $84.00 $105.22 $90.00
490613(L)6716 24" PREFAB. CULVERT END SEC., ROUND2EA $1,045.17 $400.00 $492.39 $525.00
500613(L)6728 36" PREFAB. CULVERT END SEC., ROUND4EA $2,125.50 $915.00 $908.87 $965.00
510613(S)7700 STANDARD BEDDING MATERIAL, CLASS B100CY $65.00 $82.30 $77.60 $78.00
520613(V)8000 TRENCH EXCAVATION50CY $10.00 $8.00 $32.18 $42.00
530619(B)6440 REMOVAL OF EXISTING PIPE94LF $9.50 $9.00 $9.52 $16.00
540201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,940.15 $3,000.00
550202(A)2200 UNCLASSIFIED EXCAVATION491CY $12.00 $7.00 $14.60 $14.00
560202(D)2500 UNCLASSIFIED BORROW613CY $10.00 $9.90 $17.30 $16.00
570205(A)6210 TYPE A-SALVAGED TOPSOIL393CY $15.00 $6.50 $5.33 $14.00
580221(B)2300 TEMPORARY SILT FENCE987LF $3.00 $5.25 $2.61 $6.00
590221(E)2600 TEMPORARY SILT DIKE42LF $11.00 $32.00 $9.58 $32.00
600232(A)9200 SEEDING METHOD A0.3AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
610233(A)0200 VEGETATIVE MULCHING0.62AC $775.00 $6,400.00 $5,766.12 $6,300.00
620402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E272TON $35.00 $57.15 $47.85 $55.00
630613(A)5216 24" R.C.PIPE CLASS III78LF $63.68 $90.00 $84.70 $80.00
640613(L)6716 24" PREFAB. CULVERT END SEC., ROUND4EA $1,045.17 $1,730.00 $1,651.90 $1,450.00
650613(S)7700 STANDARD BEDDING MATERIAL, CLASS B29CY $65.00 $82.30 $77.60 $88.00
660613(V)8000 TRENCH EXCAVATION41CY $10.00 $8.00 $32.18 $19.00
670619(B)6352 REMOVAL OF FENCE773LF $3.00 $2.00 $1.93 $2.00
680619(B)6440 REMOVAL OF EXISTING PIPE104LF $9.50 $8.00 $9.52 $16.00
690624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)419LF $8.00 $11.80 $11.42 $11.00
700201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,940.15 $3,000.00
710202(A)2200 UNCLASSIFIED EXCAVATION159CY $12.00 $7.00 $14.60 $14.00
720202(D)2500 UNCLASSIFIED BORROW270CY $10.00 $9.90 $17.30 $16.00
730205(A)6210 TYPE A-SALVAGED TOPSOIL246CY $15.00 $6.50 $5.33 $14.00
740221(B)2300 TEMPORARY SILT FENCE1,026LF $3.00 $5.25 $2.61 $6.00
750221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
760232(A)9200 SEEDING METHOD A0.07AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
770233(A)0200 VEGETATIVE MULCHING0.4AC $775.00 $6,400.00 $5,766.12 $6,300.00
780402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E252TON $35.00 $57.15 $47.85 $55.00
790201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,083.70 $3,000.00
800202(A)2200 UNCLASSIFIED EXCAVATION350CY $12.00 $7.00 $14.60 $14.00
810202(D)2500 UNCLASSIFIED BORROW125CY $10.00 $9.90 $17.30 $16.00
820205(A)6210 TYPE A-SALVAGED TOPSOIL381CY $15.00 $6.50 $5.33 $14.00
830221(B)2300 TEMPORARY SILT FENCE1,436LF $3.00 $5.25 $2.61 $6.00
840221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
850232(A)9200 SEEDING METHOD A0.17AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
860233(A)0200 VEGETATIVE MULCHING0.6AC $775.00 $6,400.00 $5,766.12 $6,300.00
870402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E361TON $35.00 $57.15 $47.85 $55.00
880201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,651.84 $3,000.00
890202(A)2200 UNCLASSIFIED EXCAVATION37CY $12.00 $7.00 $14.60 $14.00
900202(D)2500 UNCLASSIFIED BORROW844CY $10.00 $9.50 $17.30 $16.00
910205(A)6210 TYPE A-SALVAGED TOPSOIL303CY $15.00 $6.50 $5.33 $14.00
920221(B)2300 TEMPORARY SILT FENCE1,123LF $3.00 $5.25 $2.61 $6.00
930221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
940232(A)9200 SEEDING METHOD A0.17AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
950233(A)0200 VEGETATIVE MULCHING0.49AC $775.00 $6,400.00 $5,766.12 $6,300.00
960402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E529TON $35.00 $57.15 $47.85 $55.00
970619(B)6440 REMOVAL OF EXISTING PIPE38LF $9.50 $8.00 $9.52 $16.00
980201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $3,000.00
990202(A)2200 UNCLASSIFIED EXCAVATION313CY $12.00 $7.00 $14.60 $14.00
1,000202(D)2500 UNCLASSIFIED BORROW1,180CY $10.00 $8.50 $17.30 $16.00
1,010205(A)6210 TYPE A-SALVAGED TOPSOIL547CY $15.00 $6.50 $5.33 $14.00
1,020221(B)2300 TEMPORARY SILT FENCE1,634LF $3.00 $5.25 $2.61 $6.00
1,030221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,040232(A)9200 SEEDING METHOD A0.38AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,050233(A)0200 VEGETATIVE MULCHING0.64AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,060402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E422TON $35.00 $57.15 $47.85 $55.00
1,070613(B)5508 18" CORR. GALV. STEEL PIPE36LF $44.75 $66.00 $67.11 $60.00
1,080613(L)6708 18" PREFAB. CULVERT END SEC., ROUND2EA $820.00 $375.00 $269.85 $420.00
1,090613(S)7700 STANDARD BEDDING MATERIAL, CLASS B14CY $65.00 $82.30 $101.07 $94.00
1,100613(V)8000 TRENCH EXCAVATION14CY $10.00 $8.00 $32.18 $22.00
1,110619(B)6352 REMOVAL OF FENCE939LF $3.00 $2.00 $1.93 $2.00
1,120619(B)6440 REMOVAL OF EXISTING PIPE36LF $9.50 $8.00 $9.52 $16.00
1,130624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)1,022LF $8.00 $11.80 $11.42 $10.40
1,140201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $3,000.00
1,150202(A)2200 UNCLASSIFIED EXCAVATION15CY $12.00 $7.00 $14.60 $14.00
1,160202(D)2500 UNCLASSIFIED BORROW1,678CY $10.00 $9.50 $17.30 $16.00
1,170205(A)6210 TYPE A-SALVAGED TOPSOIL400CY $15.00 $6.50 $5.33 $14.00
1,180221(B)2300 TEMPORARY SILT FENCE1,452LF $3.00 $5.25 $2.61 $6.00
1,190221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,200232(A)9200 SEEDING METHOD A0.22AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,210233(A)0200 VEGETATIVE MULCHING0.63AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,220402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E361TON $35.00 $57.15 $47.85 $55.00
1,230201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,940.15 $10,000.00
1,240202(A)2200 UNCLASSIFIED EXCAVATION26CY $12.00 $7.00 $14.60 $42.00
1,250202(D)2500 UNCLASSIFIED BORROW1,034CY $10.00 $9.50 $17.30 $12.00
1,260205(A)6210 TYPE A-SALVAGED TOPSOIL398CY $15.00 $6.50 $5.33 $10.00
1,270221(B)2300 TEMPORARY SILT FENCE1,355LF $3.00 $5.25 $2.61 $6.00
1,280221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,290232(A)9200 SEEDING METHOD A0.23AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,300233(A)0200 VEGETATIVE MULCHING0.63AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,310402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E369TON $35.00 $57.15 $47.85 $52.00
1,320613(A)5358 28" X 18" R.C.PIPE ARCH CLASS A-III34LF $105.00 $121.55 $78.05 $125.00
1,330613(L)6620 28" X 18" PREFAB. CULVERT END SEC., ARCH2EA $1,250.00 $1,710.00 $368.06 $1,400.00
1,340613(S)7700 STANDARD BEDDING MATERIAL, CLASS B19CY $65.00 $82.30 $101.07 $115.00
1,350613(V)8000 TRENCH EXCAVATION16CY $10.00 $8.00 $32.18 $45.00
1,360619(B)6440 REMOVAL OF EXISTING PIPE33LF $9.50 $8.00 $9.52 $30.00
1,370201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,651.44 $10,000.00
1,380202(A)2200 UNCLASSIFIED EXCAVATION392CY $12.00 $7.00 $14.60 $26.00
1,390202(D)2500 UNCLASSIFIED BORROW1,346CY $10.00 $9.50 $17.30 $12.00
1,400205(A)6210 TYPE A-SALVAGED TOPSOIL562CY $15.00 $6.50 $5.33 $10.00
1,410221(B)2300 TEMPORARY SILT FENCE1,991LF $3.00 $5.25 $2.61 $6.00
1,420221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,430232(A)9200 SEEDING METHOD A0.3AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,440233(A)0200 VEGETATIVE MULCHING0.88AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,450402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E529TON $35.00 $57.15 $47.85 $52.00
1,460613(B)5612 28" X 20" CORR. GALV. STEEL PIPE ARCH74LF $35.00 $64.85 $78.05 $70.00
1,470613(L)6624 28" X 20" PREFAB. CULVERT END SEC., ARCH4EA $350.00 $368.00 $368.06 $800.00
1,480613(S)7700 STANDARD BEDDING MATERIAL, CLASS B72CY $65.00 $82.30 $101.07 $110.00
1,490613(V)8000 TRENCH EXCAVATION40CY $10.00 $8.00 $32.18 $34.00
1,500619(B)6440 REMOVAL OF EXISTING PIPE65LF $9.50 $8.00 $9.52 $30.00
1,510201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $2,930.07 $10,000.00
1,520202(A)2200 UNCLASSIFIED EXCAVATION32CY $12.00 $7.00 $14.60 $34.00
1,530202(D)2500 UNCLASSIFIED BORROW3,141CY $10.00 $8.50 $17.30 $12.00
1,540205(A)6210 TYPE A-SALVAGED TOPSOIL501CY $15.00 $6.50 $5.33 $10.00
1,550221(B)2300 TEMPORARY SILT FENCE1,454LF $3.00 $5.25 $2.61 $6.00
1,560221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,570232(A)9200 SEEDING METHOD A0.36AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,580233(A)0200 VEGETATIVE MULCHING0.79AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,590402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E373TON $35.00 $57.15 $47.85 $52.00
1,600619(B)6352 REMOVAL OF FENCE826LF $3.00 $2.00 $1.93 $3.00
1,610624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)817LF $8.00 $11.80 $11.42 $11.00
1,620624(F)3748 GATES-STYLE CLF (5'HIGH X 18'LONG)1EA $1,250.00 $2,200.00 $864.92 $1,250.00
1,630201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,343.78 $3,000.00
1,640202(A)2200 UNCLASSIFIED EXCAVATION70CY $12.00 $7.00 $14.60 $17.00
1,650202(D)2500 UNCLASSIFIED BORROW346CY $10.00 $16.50 $17.30 $30.00
1,660205(A)6210 TYPE A-SALVAGED TOPSOIL276CY $15.00 $6.50 $5.33 $25.20
1,670221(B)2300 TEMPORARY SILT FENCE1,000LF $3.00 $5.25 $2.61 $6.00
1,680221(E)2600 TEMPORARY SILT DIKE112LF $11.00 $32.00 $9.58 $32.00
1,690232(A)9200 SEEDING METHOD A0.45AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,700233(A)0200 VEGETATIVE MULCHING0.41AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,710402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E280TON $35.00 $57.15 $47.85 $42.00
1,720201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,579.26 $3,000.00
1,730202(A)2200 UNCLASSIFIED EXCAVATION29CY $12.00 $7.00 $14.60 $18.00
1,740202(D)2500 UNCLASSIFIED BORROW429CY $10.00 $9.00 $17.30 $30.00
1,750205(A)6210 TYPE A-SALVAGED TOPSOIL242CY $15.00 $6.50 $5.33 $25.20
1,760221(B)2300 TEMPORARY SILT FENCE900LF $3.00 $5.25 $2.61 $6.00
1,770221(E)2600 TEMPORARY SILT DIKE119LF $11.00 $32.00 $9.58 $32.00
1,780232(A)9200 SEEDING METHOD A0.38AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,790233(A)0200 VEGETATIVE MULCHING0.36AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,800402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E216TON $35.00 $57.15 $47.85 $42.00
1,810201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $3,000.00
1,820202(A)2200 UNCLASSIFIED EXCAVATION293CY $12.00 $7.00 $14.60 $16.00
1,830202(D)2500 UNCLASSIFIED BORROW483CY $10.00 $9.00 $17.30 $30.00
1,840205(A)6210 TYPE A-SALVAGED TOPSOIL216CY $15.00 $6.50 $5.33 $25.20
1,850221(B)2300 TEMPORARY SILT FENCE951LF $3.00 $5.25 $2.61 $6.00
1,860221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
1,870232(A)9200 SEEDING METHOD A0.08AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,880233(A)0200 VEGETATIVE MULCHING0.36AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,890402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E224TON $35.00 $57.15 $47.85 $42.00
1,900201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $800.00 $4,300.23 $3,000.00
1,910202(A)2200 UNCLASSIFIED EXCAVATION273CY $12.00 $7.00 $14.60 $17.00
1,920202(D)2500 UNCLASSIFIED BORROW26CY $10.00 $9.50 $17.30 $45.00
1,930205(A)6210 TYPE A-SALVAGED TOPSOIL236CY $15.00 $6.50 $5.33 $25.20
1,940221(B)2300 TEMPORARY SILT FENCE1,050LF $3.00 $5.25 $2.61 $6.00
1,950221(E)2600 TEMPORARY SILT DIKE126LF $11.00 $32.00 $9.58 $32.00
1,960232(A)9200 SEEDING METHOD A0.45AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
1,970233(A)0200 VEGETATIVE MULCHING0.35AC $775.00 $6,400.00 $5,766.12 $6,300.00
1,980402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E256TON $35.00 $57.15 $47.85 $42.00
1,990201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,723.62 $10,000.00
2,000202(A)2200 UNCLASSIFIED EXCAVATION63CY $12.00 $7.00 $14.60 $28.00
2,010202(D)2500 UNCLASSIFIED BORROW1,089CY $10.00 $8.50 $17.30 $15.00
2,020205(A)6210 TYPE A-SALVAGED TOPSOIL337CY $15.00 $6.50 $5.33 $10.00
2,030221(B)2300 TEMPORARY SILT FENCE1,100LF $3.00 $5.25 $2.61 $6.00
2,040221(E)2600 TEMPORARY SILT DIKE112LF $11.00 $32.00 $9.58 $32.00
2,050232(A)9200 SEEDING METHOD A0.51AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,060233(A)0200 VEGETATIVE MULCHING0.5AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,070402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E300TON $35.00 $57.15 $47.85 $55.00
2,080201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,005.11 $10,000.00
2,090202(A)2200 UNCLASSIFIED EXCAVATION93CY $12.00 $7.00 $14.60 $21.00
2,100202(D)2500 UNCLASSIFIED BORROW393CY $10.00 $10.00 $17.30 $15.00
2,110205(A)6210 TYPE A-SALVAGED TOPSOIL236CY $15.00 $6.50 $5.33 $9.00
2,120221(B)2300 TEMPORARY SILT FENCE900LF $3.00 $5.25 $2.61 $6.00
2,130221(E)2600 TEMPORARY SILT DIKE126LF $11.00 $32.00 $9.58 $32.00
2,140232(A)9200 SEEDING METHOD A0.38AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,150233(A)0200 VEGETATIVE MULCHING0.35AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,160402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E216TON $35.00 $57.15 $47.85 $55.00
2,170201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $5,960.30 $10,000.00
2,180202(A)2200 UNCLASSIFIED EXCAVATION75CY $12.00 $7.00 $14.60 $25.00
2,190202(D)2500 UNCLASSIFIED BORROW295CY $10.00 $9.50 $17.30 $17.00
2,200205(A)6210 TYPE A-SALVAGED TOPSOIL283CY $15.00 $6.50 $5.33 $8.00
2,210221(B)2300 TEMPORARY SILT FENCE1,050LF $3.00 $5.25 $2.61 $6.00
2,220221(E)2600 TEMPORARY SILT DIKE168LF $11.00 $32.00 $9.58 $32.00
2,230232(A)9200 SEEDING METHOD A0.43AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,240233(A)0200 VEGETATIVE MULCHING0.42AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,250402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E248TON $35.00 $57.15 $47.85 $55.00
2,260201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $5,960.30 $10,000.00
2,270202(A)2200 UNCLASSIFIED EXCAVATION142CY $12.00 $7.00 $14.60 $25.00
2,280202(D)2500 UNCLASSIFIED BORROW400CY $10.00 $9.50 $17.30 $15.00
2,290205(A)6210 TYPE A-SALVAGED TOPSOIL511CY $15.00 $6.50 $5.33 $10.00
2,300221(B)2300 TEMPORARY SILT FENCE1,000LF $3.00 $5.25 $2.61 $6.00
2,310221(E)2600 TEMPORARY SILT DIKE168LF $11.00 $32.00 $9.58 $32.00
2,320232(A)9200 SEEDING METHOD A0.44AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,330233(A)0200 VEGETATIVE MULCHING0.76AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,340402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E280TON $35.00 $57.15 $47.85 $55.00
2,350201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $5,960.30 $10,000.00
2,360202(A)2200 UNCLASSIFIED EXCAVATION61CY $12.00 $7.00 $14.60 $28.00
2,370202(D)2500 UNCLASSIFIED BORROW750CY $10.00 $8.50 $17.30 $15.00
2,380221(B)2300 TEMPORARY SILT FENCE1,200LF $3.00 $5.25 $2.61 $6.00
2,390221(E)2600 TEMPORARY SILT DIKE56LF $11.00 $32.00 $9.58 $32.00
2,400232(A)9200 SEEDING METHOD A0.49AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,410233(A)0200 VEGETATIVE MULCHING0.54AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,420402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E295.01TON $35.00 $57.15 $47.85 $55.00
2,430201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $10,000.00
2,440202(A)2200 UNCLASSIFIED EXCAVATION38CY $12.00 $7.00 $14.60 $28.00
2,450202(D)2500 UNCLASSIFIED BORROW224CY $10.00 $9.00 $17.30 $15.00
2,460205(A)6210 TYPE A-SALVAGED TOPSOIL73CY $15.00 $6.50 $5.33 $11.00
2,470221(B)2300 TEMPORARY SILT FENCE700LF $3.00 $5.25 $2.61 $6.00
2,480221(E)2600 TEMPORARY SILT DIKE126LF $11.00 $32.00 $9.58 $32.00
2,490232(A)9200 SEEDING METHOD A0.29AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,500233(A)0200 VEGETATIVE MULCHING0.11AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,510402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E189.65TON $35.00 $57.15 $47.85 $55.00
2,520201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $5,238.53 $10,000.00
2,530202(A)2200 UNCLASSIFIED EXCAVATION341CY $12.00 $7.00 $14.60 $18.00
2,540202(D)2500 UNCLASSIFIED BORROW329CY $10.00 $9.50 $17.30 $13.00
2,550205(A)6210 TYPE A-SALVAGED TOPSOIL131CY $15.00 $6.50 $5.33 $11.00
2,560221(B)2300 TEMPORARY SILT FENCE1,100LF $3.00 $5.25 $2.61 $6.00
2,570221(E)2600 TEMPORARY SILT DIKE112LF $11.00 $32.00 $9.58 $32.00
2,580232(A)9200 SEEDING METHOD A0.47AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,590233(A)0200 VEGETATIVE MULCHING0.19AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,600402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E300TON $35.00 $57.15 $47.85 $55.00
2,610613(B)5528 36" CORR. GALV. STEEL PIPE64LF $71.25 $84.00 $105.22 $90.00
2,620613(L)6728 36" PREFAB. CULVERT END SEC., ROUND2EA $2,125.50 $400.00 $908.87 $1,350.00
2,630613(S)7700 STANDARD BEDDING MATERIAL, CLASS B55CY $65.00 $82.30 $101.07 $110.00
2,640619(B)6440 REMOVAL OF EXISTING PIPE36.1LF $9.50 $8.00 $9.52 $30.00
2,650201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,794.99 $10,000.00
2,660202(A)2200 UNCLASSIFIED EXCAVATION48CY $12.00 $7.00 $14.60 $24.00
2,670202(D)2500 UNCLASSIFIED BORROW1,038CY $10.00 $8.50 $17.30 $13.00
2,680205(A)6210 TYPE A-SALVAGED TOPSOIL371CY $15.00 $6.50 $5.33 $8.00
2,690221(B)2300 TEMPORARY SILT FENCE1,255LF $3.00 $5.25 $2.61 $6.00
2,700221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
2,710232(A)9200 SEEDING METHOD A0.23AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,720233(A)0200 VEGETATIVE MULCHING0.6AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,730402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E312TON $35.00 $57.15 $47.85 $55.00
2,740201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,083.70 $10,000.00
2,750202(A)2200 UNCLASSIFIED EXCAVATION45CY $12.00 $7.00 $14.60 $24.00
2,760202(D)2500 UNCLASSIFIED BORROW667CY $10.00 $10.50 $17.30 $12.00
2,770205(A)6210 TYPE A-SALVAGED TOPSOIL296CY $15.00 $6.50 $5.33 $9.00
2,780221(B)2300 TEMPORARY SILT FENCE1,100LF $3.00 $5.25 $2.61 $6.00
2,790221(E)2600 TEMPORARY SILT DIKE112LF $11.00 $32.00 $9.58 $32.00
2,800232(A)9200 SEEDING METHOD A0.52AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,810233(A)0200 VEGETATIVE MULCHING0.44AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,820402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E310TON $35.00 $57.15 $47.85 $55.00
2,830201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $4,516.76 $10,000.00
2,840202(A)2200 UNCLASSIFIED EXCAVATION2,257CY $12.00 $7.50 $14.60 $9.00
2,850205(A)6210 TYPE A-SALVAGED TOPSOIL804CY $15.00 $6.50 $5.33 $6.00
2,860221(B)2300 TEMPORARY SILT FENCE1,753LF $3.00 $5.25 $2.61 $6.00
2,870221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $32.00
2,880232(A)9200 SEEDING METHOD A0.74AC $1,200.00 $16,000.00 $2,511.72 $16,000.00
2,890233(A)0200 VEGETATIVE MULCHING1.24AC $775.00 $6,400.00 $5,766.12 $6,300.00
2,900402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E530TON $35.00 $57.15 $47.85 $55.00
2,910619(B)6352 REMOVAL OF FENCE1,529LF $3.00 $4.00 $1.93 $1.50
2,920624(C)3410 FENCE-STYLE SWF (6 BARBED WIRE)1,639LF $8.00 $11.80 $11.42 $11.00
2,930202(A)2210 UNCLASSIFIED EXCAVATION1,344CY $7.00 $6.00 $17.82 $12.00
2,940303(A)1200 AGGREGATE BASE TYPE A675CY $85.00 $83.00 $58.58 $84.00
2,950326(A)1200 GEOTEXTILE REINFORCEMENT3,080SY $6.00 $5.80 $4.71 $6.00
2,960501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
2,970503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
2,980504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
2,990506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
3,000542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $65.00
3,010601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $60.00
3,020601(I)1700 FILTER FABRIC (RIPRAP)100SY $7.00 $7.00 $2.82 $50.00
3,030619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,000.00 $1,455.11 $10,000.00
3,040202(A)2210 UNCLASSIFIED EXCAVATION1,344CY $7.00 $6.00 $17.82 $12.00
3,050303(A)1200 AGGREGATE BASE TYPE A860CY $85.00 $83.00 $58.58 $84.00
3,060326(A)1200 GEOTEXTILE REINFORCEMENT3,130SY $6.00 $5.80 $4.71 $6.00
3,070501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
3,080503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,090504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
3,100506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
3,110542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $65.00
3,120601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $60.00
3,130601(I)1700 FILTER FABRIC (RIPRAP)120SY $7.00 $7.00 $2.82 $50.00
3,140619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $2,650.38 $10,000.00
3,150202(A)2210 UNCLASSIFIED EXCAVATION681CY $7.00 $6.00 $17.82 $12.00
3,160303(A)1200 AGGREGATE BASE TYPE A370CY $85.00 $83.00 $58.58 $84.00
3,170326(A)1200 GEOTEXTILE REINFORCEMENT1,510SY $6.00 $5.80 $4.71 $6.00
3,180501(B)1300 SUBSTRUCTURE EXCAVATION COMMON80CY $20.00 $12.00 $27.34 $30.00
3,190503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,200504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
3,210506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
3,220542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,040SF $40.00 $40.00 $60.97 $65.00
3,230601(B)1230 TYPE I-A PLAIN RIPRAP120TON $65.00 $62.00 $67.34 $60.00
3,240601(I)1700 FILTER FABRIC (RIPRAP)70SY $7.00 $7.00 $2.82 $50.00
3,250619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,000.00 $727.55 $10,000.00
3,260202(A)2210 UNCLASSIFIED EXCAVATION1,572CY $7.00 $6.00 $17.82 $12.00
3,270303(A)1200 AGGREGATE BASE TYPE A675CY $85.00 $83.00 $58.58 $84.00
3,280326(A)1200 GEOTEXTILE REINFORCEMENT2,570SY $6.00 $5.80 $4.71 $6.00
3,290501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
3,300503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,310504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
3,320506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
3,330542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $65.00
3,340601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $55.00
3,350601(I)1700 FILTER FABRIC (RIPRAP)100SY $7.00 $7.00 $2.82 $50.00
3,360619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,000.00 $727.55 $10,000.00
3,370202(A)2210 UNCLASSIFIED EXCAVATION3,710CY $7.00 $6.00 $17.82 $6.00
3,380303(A)1200 AGGREGATE BASE TYPE A1,925CY $85.00 $83.00 $58.58 $106.00
3,390326(A)1200 GEOTEXTILE REINFORCEMENT8,730SY $6.00 $5.80 $4.71 $3.50
3,400501(B)1300 SUBSTRUCTURE EXCAVATION COMMON140CY $20.00 $12.00 $27.34 $19.00
3,410503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,420504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,430506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,440542 9102 (PL)INSTALLATION OF BRIDGE ITEMS4,240SF $40.00 $40.00 $60.97 $18.00
3,450601(B)1230 TYPE I-A PLAIN RIPRAP490TON $65.00 $62.00 $67.34 $67.00
3,460601(I)1700 FILTER FABRIC (RIPRAP)370SY $7.00 $7.00 $2.82 $3.00
3,470619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,500.00 $2,841.91 $13,000.00
3,480202(A)2210 UNCLASSIFIED EXCAVATION2,190CY $7.00 $6.00 $17.82 $6.00
3,490303(A)1200 AGGREGATE BASE TYPE A1,090CY $85.00 $83.00 $58.58 $106.00
3,500326(A)1200 GEOTEXTILE REINFORCEMENT4,690SY $6.00 $5.80 $4.71 $4.00
3,510501(B)1300 SUBSTRUCTURE EXCAVATION COMMON110CY $20.00 $12.00 $27.34 $19.00
3,520503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,530504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,540506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,550542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,672SF $40.00 $40.00 $60.97 $18.00
3,560601(B)1230 TYPE I-A PLAIN RIPRAP240TON $65.00 $62.00 $67.34 $68.00
3,570601(I)1700 FILTER FABRIC (RIPRAP)270SY $7.00 $7.00 $2.82 $3.00
3,580619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $5,000.00 $2,737.48 $8,000.00
3,590202(A)2210 UNCLASSIFIED EXCAVATION1,880CY $7.00 $6.00 $17.82 $6.00
3,600303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $106.00
3,610326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $4.00
3,620501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $19.00
3,630503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,640504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,650506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,660542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $18.00
3,670601(B)1230 TYPE I-A PLAIN RIPRAP160TON $65.00 $62.00 $67.34 $68.00
3,680601(I)1700 FILTER FABRIC (RIPRAP)290SY $7.00 $7.00 $2.82 $3.00
3,690619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $2,500.00 $2,737.48 $8,000.00
3,700202(A)2210 UNCLASSIFIED EXCAVATION1,620CY $7.00 $6.00 $17.82 $6.00
3,710303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $106.00
3,720326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $4.00
3,730501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $19.00
3,740503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,750504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,760506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,770542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $18.00
3,780601(B)1230 TYPE I-A PLAIN RIPRAP130TON $65.00 $62.00 $67.34 $68.00
3,790601(I)1700 FILTER FABRIC (RIPRAP)210SY $7.00 $7.00 $2.82 $3.00
3,800619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $2,304.41 $6,000.00
3,810202(A)2210 UNCLASSIFIED EXCAVATION800CY $7.00 $6.00 $17.82 $6.00
3,820303(A)1200 AGGREGATE BASE TYPE A490CY $85.00 $83.00 $58.58 $106.00
3,830326(A)1200 GEOTEXTILE REINFORCEMENT2,100SY $6.00 $5.80 $4.71 $4.00
3,840501(B)1300 SUBSTRUCTURE EXCAVATION COMMON90CY $20.00 $12.00 $27.34 $19.00
3,850503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,860504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,870506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,880542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,408SF $40.00 $40.00 $60.97 $18.00
3,890601(B)1230 TYPE I-A PLAIN RIPRAP90TON $65.00 $62.00 $67.34 $68.00
3,900601(I)1700 FILTER FABRIC (RIPRAP)200SY $7.00 $7.00 $2.82 $3.00
3,910619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $2,841.91 $8,000.00
3,920202(A)2210 UNCLASSIFIED EXCAVATION2,020CY $7.00 $6.00 $17.82 $6.00
3,930303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $106.00
3,940326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $4.00
3,950501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $19.00
3,960503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
3,970504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
3,980506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
3,990542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $18.00
4,000601(B)1230 TYPE I-A PLAIN RIPRAP100TON $65.00 $62.00 $67.34 $68.00
4,010601(I)1700 FILTER FABRIC (RIPRAP)210SY $7.00 $7.00 $2.82 $3.00
4,020619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $3,664.48 $8,000.00
4,030202(A)2210 UNCLASSIFIED EXCAVATION2,610CY $7.00 $6.00 $17.82 $6.00
4,040303(A)1200 AGGREGATE BASE TYPE A1,345CY $85.00 $83.00 $58.58 $106.00
4,050326(A)1200 GEOTEXTILE REINFORCEMENT5,860SY $6.00 $5.80 $4.71 $4.00
4,060501(B)1300 SUBSTRUCTURE EXCAVATION COMMON120CY $20.00 $12.00 $27.34 $19.00
4,070503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
4,080504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $85.00
4,090506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $9.00
4,100542 9102 (PL)INSTALLATION OF BRIDGE ITEMS3,168SF $40.00 $40.00 $60.97 $18.00
4,110601(B)1230 TYPE I-A PLAIN RIPRAP280TON $65.00 $62.00 $67.34 $68.00
4,120601(I)1700 FILTER FABRIC (RIPRAP)300SY $7.00 $7.00 $2.82 $3.00
4,130619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $5,000.00 $3,014.89 $16,000.00
4,140202(A)2210 UNCLASSIFIED EXCAVATION1,810CY $7.00 $6.00 $17.82 $12.00
4,150303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $84.00
4,160326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $5.00
4,170501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
4,180503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
4,190504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $70.00
4,200506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
4,210542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $65.00
4,220601(B)1230 TYPE I-A PLAIN RIPRAP80TON $65.00 $62.00 $67.34 $56.00
4,230601(I)1700 FILTER FABRIC (RIPRAP)270SY $7.00 $7.00 $2.82 $50.00
4,240619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $1,766.92 $10,000.00
4,250202(A)2210 UNCLASSIFIED EXCAVATION900CY $7.00 $6.00 $17.82 $12.00
4,260303(A)1200 AGGREGATE BASE TYPE A860CY $85.00 $83.00 $58.58 $84.00
4,270326(A)1200 GEOTEXTILE REINFORCEMENT3,020SY $6.00 $5.80 $4.71 $5.00
4,280501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
4,290503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
4,300504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
4,310506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
4,320542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $65.00
4,330601(B)1230 TYPE I-A PLAIN RIPRAP210TON $65.00 $62.00 $67.34 $56.00
4,340601(I)1700 FILTER FABRIC (RIPRAP)120SY $7.00 $7.00 $2.82 $50.00
4,350619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $4,500.00 $1,940.15 $10,000.00
4,360202(A)2210 UNCLASSIFIED EXCAVATION2,956CY $7.00 $6.00 $17.82 $12.00
4,370303(A)1200 AGGREGATE BASE TYPE A1,310CY $85.00 $83.00 $58.58 $84.00
4,380326(A)1200 GEOTEXTILE REINFORCEMENT5,280SY $6.00 $5.80 $4.71 $5.00
4,390501(B)1300 SUBSTRUCTURE EXCAVATION COMMON110CY $20.00 $12.00 $27.34 $30.00
4,400503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
4,410504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $70.00
4,420506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
4,430542 9102 (PL)INSTALLATION OF BRIDGE ITEMS3,168SF $40.00 $40.00 $60.97 $65.00
4,440601(B)1230 TYPE I-A PLAIN RIPRAP420TON $65.00 $62.00 $67.34 $56.00
4,450601(I)1700 FILTER FABRIC (RIPRAP)150SY $7.00 $7.00 $2.82 $50.00
4,460619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,500.00 $2,737.48 $10,000.00
4,470202(A)2210 UNCLASSIFIED EXCAVATION997CY $7.00 $6.00 $17.82 $12.00
4,480303(A)1200 AGGREGATE BASE TYPE A510CY $85.00 $83.00 $58.58 $84.00
4,490326(A)1200 GEOTEXTILE REINFORCEMENT1,940SY $6.00 $5.80 $4.71 $6.00
4,500501(B)1300 SUBSTRUCTURE EXCAVATION COMMON90CY $20.00 $12.00 $27.34 $30.00
4,510503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
4,520504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
4,530506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
4,540542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,408SF $40.00 $40.00 $60.97 $65.00
4,550601(B)1230 TYPE I-A PLAIN RIPRAP190TON $65.00 $62.00 $67.34 $56.00
4,560601(I)1700 FILTER FABRIC (RIPRAP)80SY $7.00 $7.00 $2.82 $50.00
4,570619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $727.55 $10,000.00
4,580202(A)2210 UNCLASSIFIED EXCAVATION1,230CY $7.00 $6.00 $17.82 $15.00
4,590303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $75.00
4,600326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
4,610501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $23.00
4,620503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $440.00
4,630504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $95.00
4,640506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $8.00
4,650542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $65.00
4,660601(B)1230 TYPE I-A PLAIN RIPRAP90TON $65.00 $62.00 $67.34 $75.00
4,670601(I)1700 FILTER FABRIC (RIPRAP)270SY $7.00 $7.00 $2.82 $60.00
4,680619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,500.00 $3,708.03 $8,000.00
4,690202(A)2210 UNCLASSIFIED EXCAVATION2,300CY $7.00 $6.00 $17.82 $14.00
4,700303(A)1200 AGGREGATE BASE TYPE A1,345CY $85.00 $83.00 $58.58 $72.00
4,710326(A)1200 GEOTEXTILE REINFORCEMENT5,860SY $6.00 $5.80 $4.71 $4.00
4,720501(B)1300 SUBSTRUCTURE EXCAVATION COMMON120CY $20.00 $12.00 $27.34 $23.00
4,730503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $440.00
4,740504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $95.00
4,750506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $8.00
4,760542 9102 (PL)INSTALLATION OF BRIDGE ITEMS3,168SF $40.00 $40.00 $60.97 $65.00
4,770601(B)1230 TYPE I-A PLAIN RIPRAP150TON $65.00 $62.00 $67.34 $75.00
4,780601(I)1700 FILTER FABRIC (RIPRAP)140SY $7.00 $7.00 $2.82 $60.00
4,790619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $3,708.03 $8,000.00
4,800202(A)2210 UNCLASSIFIED EXCAVATION1,270CY $7.00 $6.00 $17.82 $15.00
4,810303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $75.00
4,820326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
4,830501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $23.00
4,840503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $440.00
4,850504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $95.00
4,860506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $8.00
4,870542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $65.00
4,880601(B)1230 TYPE I-A PLAIN RIPRAP160TON $65.00 $62.00 $67.34 $75.00
4,890601(I)1700 FILTER FABRIC (RIPRAP)110SY $7.00 $7.00 $2.82 $60.00
4,900619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $2,841.91 $8,000.00
4,910202(A)2210 UNCLASSIFIED EXCAVATION1,180CY $7.00 $6.00 $17.82 $15.00
4,920303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $75.00
4,930326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
4,940501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $23.00
4,950503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $440.00
4,960504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $95.00
4,970506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $8.00
4,980542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $65.00
4,990601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $77.00
5,000601(I)1700 FILTER FABRIC (RIPRAP)110SY $7.00 $7.00 $2.82 $60.00
5,010619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $3,708.03 $8,000.00
5,020202(A)2210 UNCLASSIFIED EXCAVATION900CY $7.00 $6.00 $17.82 $11.00
5,030303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $84.00
5,040326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
5,050501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,060503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
5,070504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $70.00
5,080506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,090542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $70.00
5,100601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $56.00
5,110601(I)1700 FILTER FABRIC (RIPRAP)110SY $7.00 $7.00 $2.82 $50.00
5,120619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,500.00 $3,083.44 $20,000.00
5,130202(A)2210 UNCLASSIFIED EXCAVATION1,720CY $7.00 $6.00 $17.82 $11.00
5,140303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $84.00
5,150326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $5.00
5,160501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,170503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,180504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,190506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,200542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $70.00
5,210601(B)1230 TYPE I-A PLAIN RIPRAP160TON $65.00 $62.00 $67.34 $56.00
5,220601(I)1700 FILTER FABRIC (RIPRAP)120SY $7.00 $7.00 $2.82 $50.00
5,230619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $12,000.00 $2,650.38 $20,000.00
5,240202(A)2210 UNCLASSIFIED EXCAVATION1,170CY $7.00 $6.00 $17.82 $11.00
5,250303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $84.00
5,260326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
5,270501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,280503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
5,290504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $65.00
5,300506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,310542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $70.00
5,320601(B)1230 TYPE I-A PLAIN RIPRAP140TON $65.00 $62.00 $67.34 $56.00
5,330601(I)1700 FILTER FABRIC (RIPRAP)110SY $7.00 $7.00 $2.82 $50.00
5,340619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $1,766.92 $10,000.00
5,350202(A)2210 UNCLASSIFIED EXCAVATION1,870CY $7.00 $6.00 $17.82 $10.00
5,360303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $84.00
5,370326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $5.00
5,380501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,390503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,400504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,410506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,420542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $70.00
5,430601(B)1230 TYPE I-A PLAIN RIPRAP80TON $65.00 $62.00 $67.34 $56.00
5,440601(I)1700 FILTER FABRIC (RIPRAP)260SY $7.00 $7.00 $2.82 $50.00
5,450619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $1,325.19 $10,000.00
5,460202(A)2210 UNCLASSIFIED EXCAVATION1,230CY $7.00 $6.00 $17.82 $10.00
5,470303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $84.00
5,480326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $5.00
5,490501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,500503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,510504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,520506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,530542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $70.00
5,540601(B)1230 TYPE I-A PLAIN RIPRAP80TON $65.00 $62.00 $67.34 $56.00
5,550601(I)1700 FILTER FABRIC (RIPRAP)250SY $7.00 $7.00 $2.82 $50.00
5,560619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $2,545.95 $10,000.00
5,570202(A)2210 UNCLASSIFIED EXCAVATION1,750CY $7.00 $6.00 $17.82 $11.00
5,580303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $84.00
5,590326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $5.00
5,600501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,610503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,620504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,630506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,640542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $70.00
5,650601(B)1230 TYPE I-A PLAIN RIPRAP120TON $65.00 $62.00 $67.34 $57.00
5,660601(I)1700 FILTER FABRIC (RIPRAP)310SY $7.00 $7.00 $2.82 $50.00
5,670619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $3,083.44 $10,000.00
5,680202(A)2210 UNCLASSIFIED EXCAVATION1,680CY $7.00 $6.00 $17.82 $11.00
5,690303(A)1200 AGGREGATE BASE TYPE A855CY $85.00 $83.00 $58.58 $84.00
5,700326(A)1200 GEOTEXTILE REINFORCEMENT3,620SY $6.00 $5.80 $4.71 $5.00
5,710501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,720503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,730504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,740506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,750542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $70.00
5,760601(B)1230 TYPE I-A PLAIN RIPRAP110TON $65.00 $62.00 $67.34 $57.00
5,770601(I)1700 FILTER FABRIC (RIPRAP)300SY $7.00 $7.00 $2.82 $50.00
5,780619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $3,083.44 $10,000.00
5,790202(A)2210 UNCLASSIFIED EXCAVATION1,152CY $7.00 $6.00 $17.82 $11.00
5,800303(A)1200 AGGREGATE BASE TYPE A670CY $85.00 $83.00 $58.58 $84.00
5,810326(A)1200 GEOTEXTILE REINFORCEMENT2,840SY $6.00 $5.80 $4.71 $6.00
5,820501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,830503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
5,840504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $70.00
5,850506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,860542 9102 (PL)INSTALLATION OF BRIDGE ITEMS1,792SF $40.00 $40.00 $60.97 $70.00
5,870601(B)1230 TYPE I-A PLAIN RIPRAP180TON $65.00 $62.00 $67.34 $55.00
5,880601(I)1700 FILTER FABRIC (RIPRAP)110SY $7.00 $7.00 $2.82 $50.00
5,890619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $3,083.44 $10,000.00
5,900202(A)2210 UNCLASSIFIED EXCAVATION1,715CY $7.00 $6.00 $17.82 $10.00
5,910303(A)1200 AGGREGATE BASE TYPE A860CY $85.00 $83.00 $58.58 $84.00
5,920326(A)1200 GEOTEXTILE REINFORCEMENT3,020SY $6.00 $5.80 $4.71 $5.00
5,930501(B)1300 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $12.00 $27.34 $30.00
5,940503(A)4200 PRESTRESSED CONCRETE BEAMS302LF $300.00 $322.00 $363.25 $400.00
5,950504 5130 BRIDGE TRAFFIC RAIL100.67LF $75.00 $126.00 $66.03 $80.00
5,960506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
5,970542 9102 (PL)INSTALLATION OF BRIDGE ITEMS2,224SF $40.00 $40.00 $60.97 $70.00
5,980601(B)1230 TYPE I-A PLAIN RIPRAP220TON $65.00 $62.00 $67.34 $55.00
5,990601(I)1700 FILTER FABRIC (RIPRAP)120SY $7.00 $7.00 $2.82 $50.00
6,000619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $3,500.00 $1,455.11 $10,000.00
6,010202(A)2210 UNCLASSIFIED EXCAVATION2,710CY $7.00 $6.00 $17.82 $10.00
6,020303(A)1200 AGGREGATE BASE TYPE A1,305CY $85.00 $83.00 $58.58 $84.00
6,030326(A)1200 GEOTEXTILE REINFORCEMENT3,380SY $6.00 $5.80 $4.71 $5.00
6,040501(B)1300 SUBSTRUCTURE EXCAVATION COMMON110CY $20.00 $12.00 $27.34 $30.00
6,050503(A)4200 PRESTRESSED CONCRETE BEAMS242LF $300.00 $322.00 $363.25 $400.00
6,060504 5130 BRIDGE TRAFFIC RAIL80.67LF $75.00 $126.00 $66.03 $70.00
6,070506(A)7230 STRUCTURAL STEEL A36310LB $6.00 $7.77 $7.88 $5.00
6,080542 9102 (PL)INSTALLATION OF BRIDGE ITEMS3,168SF $40.00 $40.00 $60.97 $70.00
6,090601(B)1230 TYPE I-A PLAIN RIPRAP170TON $65.00 $62.00 $67.34 $56.00
6,100601(I)1700 FILTER FABRIC (RIPRAP)150SY $7.00 $7.00 $2.82 $50.00
6,110619(D)6700 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $4,000.00 $6,000.00 $4,399.97 $10,000.00
6,120880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF8,460SD $1.05 $1.18 $2.31 $0.2000
6,130880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF5,076SD $1.70 $2.24 $2.59 $0.2200
6,140880(C)6410 CONSTRUCTION BARRICADES(TYPE III)11,844SD $1.30 $2.70 $1.27 $0.1000
6,150880(C)6420 WING BARRICADES3,384SD $1.35 $1.10 $1.27 $0.1200
6,160880(E)6600 WARNING LIGHTS(TYPE A)28,764SD $0.4500 $2.70 $0.7500 $0.0800
6,170642(B)3300 CONSTRUCTION STAKING LEVEL II1LSUM $140,000.00 $145,000.00 $126,854.71 $42,500.00
6,180641 2100 MOBILIZATION1LSUM $500,000.00 $561,000.00 $529,184.95 $601,302.08
6,190201(A)1200 CLEARING AND GRUBBING1LSUM $4,000.00 $8,000.00 $3,507.09 $6,775.00
6,200202(A)2200 UNCLASSIFIED EXCAVATION637CY $12.00 $7.00 $14.60 $12.00
6,210202(D)2500 UNCLASSIFIED BORROW256CY $10.00 $9.50 $17.30 $10.75
6,220205(A)6210 TYPE A-SALVAGED TOPSOIL424CY $15.00 $6.50 $5.33 $7.60
6,230221(B)2300 TEMPORARY SILT FENCE1,583LF $3.00 $5.25 $2.61 $5.00
6,240221(E)2600 TEMPORARY SILT DIKE28LF $11.00 $32.00 $9.58 $30.00
6,250232(A)9200 SEEDING METHOD A0.22AC $1,200.00 $16,000.00 $2,511.72 $15,000.00
6,260233(A)0200 VEGETATIVE MULCHING0.65AC $775.00 $6,400.00 $5,766.12 $6,000.00
6,270402(E)2600 TRAFFIC BOUND SURFACE COURSE TYPE E402TON $35.00 $57.15 $47.85 $40.10