| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$22,000.00 |
$11,000.00 |
$30,000.00 |
$20,000.00 |
$72,500.00 |
$314,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 4,200 | CY |
$10.00 |
$10.00 |
$8.90 |
$8.00 |
$15.00 |
$13.25 |
$22.88 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 2,200 | CY |
$12.00 |
$15.00 |
$11.75 |
$13.00 |
$20.00 |
$25.35 |
$22.88 |
| 40 | 205(A)6210 |
TYPE A-SALVAGED TOPSOIL | 2,932 | CY |
$8.00 |
$5.00 |
$4.00 |
$8.00 |
$10.00 |
$12.45 |
$22.88 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,541 | LF |
$4.00 |
$3.22 |
$3.54 |
$3.22 |
$3.40 |
$3.50 |
$4.60 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 120 | LF |
$12.00 |
$15.88 |
$17.55 |
$15.88 |
$17.00 |
$16.00 |
$22.71 |
| 70 | 228 5100 |
EROSION CONTROL MAT | 635 | SY |
$30.00 |
$42.98 |
$47.30 |
$42.98 |
$45.00 |
$45.00 |
$61.46 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 21,109 | SY |
$3.00 |
$6.39 |
$7.05 |
$6.39 |
$6.90 |
$6.50 |
$9.14 |
| 90 | 231(A)8200 |
TREES | 407 | EA |
$700.00 |
$70.00 |
$250.00 |
$149.00 |
$400.00 |
$1,250.00 |
$400.00 |
| 100 | 231(B)8300 |
SHRUBS | 163 | EA |
$90.00 |
$75.00 |
$70.00 |
$149.00 |
$400.00 |
$500.00 |
$178.75 |
| 110 | 232(A)9200 |
SEEDING METHOD A | 1 | AC |
$1,200.00 |
$1,495.00 |
$1,625.00 |
$1,495.00 |
$3,000.00 |
$1,500.00 |
$2,137.85 |
| 120 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$2,000.00 |
$1,495.00 |
$1,625.00 |
$1,495.00 |
$4,000.00 |
$1,500.00 |
$2,137.85 |
| 130 | 310(B)5300 |
SUBGRADE, METHOD B | 1,250 | SY |
$10.00 |
$10.00 |
$3.00 |
$20.00 |
$8.00 |
$12.00 |
$21.84 |
| 140 | 402(B)2300 |
TRAFFIC BOUND SURFACE COURSE TYPE B | 20 | TON |
$60.00 |
$236.09 |
$55.00 |
$60.00 |
$60.00 |
$72.00 |
$64.35 |
| 150 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 184 | TON |
$175.00 |
$200.00 |
$220.00 |
$200.00 |
$250.00 |
$310.00 |
$607.75 |
| 160 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 1,094 | SY |
$65.00 |
$25.00 |
$83.00 |
$51.83 |
$115.00 |
$38.00 |
$63.99 |
| 170 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 243 | CY |
$225.00 |
$200.00 |
$202.00 |
$257.50 |
$400.00 |
$178.00 |
$264.55 |
| 180 | 509(D)0500 |
CLASS C CONCRETE | 20 | CY |
$450.00 |
$550.00 |
$468.00 |
$1,200.00 |
$350.00 |
$345.00 |
$643.50 |
| 190 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 252 | TON |
$55.00 |
$63.40 |
$125.00 |
$106.00 |
$300.00 |
$110.00 |
$88.41 |
| 200 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 20 | TON |
$35.00 |
$51.09 |
$75.00 |
$45.00 |
$150.00 |
$106.00 |
$109.68 |
| 210 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 299 | SY |
$3.00 |
$4.00 |
$7.50 |
$85.00 |
$17.00 |
$6.25 |
$2.86 |
| 220 | 602(B)2300 |
ARTICULATING CONCRETE BLOCK | 2,404 | SF |
$30.00 |
$15.80 |
$26.00 |
$55.00 |
$45.00 |
$28.50 |
$28.77 |
| 230 | 611(G)0354 |
INLET (SMD-TYPE 2) | 1 | EA |
$5,000.00 |
$5,500.00 |
$6,700.00 |
$6,000.00 |
$6,000.00 |
$4,150.00 |
$4,066.92 |
| 240 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$16,000.00 |
$3,500.00 |
$10,000.00 |
$20,000.00 |
$15,000.00 |
$50,000.00 |
$225,000.00 |
| 250 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 747 | SY |
$10.00 |
$10.00 |
$14.00 |
$32.00 |
$12.00 |
$18.00 |
$17.16 |
| 260 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 392 | LF |
$8.00 |
$3.00 |
$6.20 |
$22.25 |
$10.00 |
$14.50 |
$28.60 |
| 270 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 636 | LF |
$8.00 |
$10.00 |
$17.05 |
$16.00 |
$14.50 |
$21.00 |
$24.73 |
| 280 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$75,000.00 |
$12,000.00 |
$30,000.00 |
$50,000.00 |
$70,000.00 |
$45,000.00 |
$69,000.00 |
| 290 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 525 | CY |
$25.00 |
$30.00 |
$12.00 |
$30.00 |
$25.00 |
$45.00 |
$20.00 |
| 300 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50,000.00 |
$10,000.00 |
$25,000.00 |
$100,000.00 |
$65,000.00 |
$30,000.00 |
$20.00 |
| 310 | 509(A)0210 |
CLASS AA CONCRETE | 986.3 | CY |
$700.00 |
$726.60 |
$575.00 |
$408.00 |
$650.00 |
$565.00 |
$913.41 |
| 320 | 511(A)2210 |
REINFORCING STEEL | 110,960 | LB |
$1.50 |
$1.38 |
$1.38 |
$1.45 |
$1.65 |
$1.20 |
$1.60 |
| 330 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$25,000.00 |
$10,000.00 |
$10,000.00 |
$15,000.00 |
$35,000.00 |
$15,000.00 |
| 340 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 240 | EA |
$1.50 |
$1.00 |
$1.10 |
$1.00 |
$1.10 |
$1.50 |
$1.43 |
| 350 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 576 | SD |
$1.00 |
$1.00 |
$1.10 |
$1.00 |
$2.10 |
$2.75 |
$1.43 |
| 360 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 864 | SD |
$1.50 |
$2.00 |
$2.25 |
$2.00 |
$2.60 |
$3.25 |
$2.86 |
| 370 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$2.00 |
$2.00 |
$2.25 |
$2.00 |
$2.10 |
$2.75 |
$2.86 |
| 380 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 576 | SD |
$2.00 |
$3.00 |
$3.25 |
$3.00 |
$2.60 |
$3.25 |
$4.29 |
| 390 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 322 | SD |
$20.00 |
$55.00 |
$65.00 |
$55.00 |
$52.00 |
$50.00 |
$78.65 |
| 400 | 856(A)8200 |
TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 565 | LF |
$2.00 |
$3.00 |
$3.25 |
$3.00 |
$6.30 |
$7.50 |
$4.29 |
| 410 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 634 | LF |
$2.50 |
$4.50 |
$5.00 |
$4.50 |
$12.00 |
$12.50 |
$6.44 |
| 420 | 856(A)8216 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 22 | LF |
$15.00 |
$18.00 |
$20.00 |
$18.00 |
$27.00 |
$32.00 |
$25.74 |
| 430 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$4,700.00 |
$7,000.00 |
$5,000.00 |
$5,200.00 |
$16,000.00 |
$6,721.00 |
| 440 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,500.00 |
$3,000.00 |
$10,000.00 |
$4,000.00 |
$8,000.00 |
$715.00 |
| 450 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$94,096.96 |
$90,000.00 |
$95,000.00 |
$135,000.00 |
$120,000.00 |
$145,000.00 |