| 10 | 221(B)2300 |
TEMPORARY SILT FENCE | 300 | LF |
$4.25 |
$3.50 |
$3.65 |
$21.43 |
| 20 | 221(G)2800 |
TEMPORARY FIBER LOG | 200 | LF |
$10.00 |
$20.00 |
$12.10 |
$12.13 |
| 30 | 509(D)0500 |
CLASS C CONCRETE | 8 | CY |
$500.00 |
$600.00 |
$400.00 |
$910.62 |
| 40 | 611(I)1010 |
RPL INLT FRM&GRT(SSIF-FRM,CIG-GRT-RVG-F) | 52 | EA |
$150.00 |
$675.00 |
$400.00 |
$2,057.83 |
| 50 | 619(B)6400 |
REMOVAL OF CURB | 20 | LF |
$15.00 |
$85.00 |
$60.00 |
$12.18 |
| 60 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 61 | SF |
$25.00 |
$45.00 |
$25.00 |
$42.70 |
| 70 | 851(C)2410 |
1 3/4" SQUARE TUBE POST | 6 | LF |
$10.00 |
$6.00 |
$12.00 |
$18.30 |
| 80 | 851(C)2415 |
2" SQUARE TUBE POST | 216 | LF |
$15.00 |
$7.00 |
$12.00 |
$18.30 |
| 90 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 45 | LF |
$20.00 |
$8.00 |
$12.00 |
$18.30 |
| 100 | 855(A)7200 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 25,114 | LF |
$0.4000 |
$0.4500 |
$1.75 |
$1.34 |
| 110 | 855(A)7208 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 10,082 | LF |
$0.7500 |
$1.15 |
$4.00 |
$2.14 |
| 120 | 855(A)7212 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 427 | LF |
$4.50 |
$6.70 |
$6.00 |
$3.21 |
| 130 | 855(A)7216 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 453 | LF |
$12.00 |
$15.00 |
$30.00 |
$21.40 |
| 140 | 855(B)7304 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 20 | EA |
$205.00 |
$275.00 |
$200.00 |
$214.00 |
| 150 | 855(B)7312 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 50 | EA |
$300.00 |
$425.00 |
$500.00 |
$534.99 |
| 160 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 270 | SD |
$0.5500 |
$0.0200 |
$3.00 |
$5.35 |
| 170 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 330 | SD |
$1.00 |
$0.0200 |
$3.00 |
$5.35 |
| 180 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 390 | SD |
$1.00 |
$2.75 |
$3.00 |
$5.35 |
| 190 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 80 | SD |
$1.00 |
$0.0200 |
$3.00 |
$5.35 |
| 200 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 910 | SD |
$0.3500 |
$0.1000 |
$0.3500 |
$1.07 |
| 210 | 880(F)6700 |
DRUMS | 490 | SD |
$0.4000 |
$1.00 |
$0.8500 |
$1.07 |
| 220 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$5,000.00 |
$3,049.95 |
| 230 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$10,000.00 |
$1,359.00 |
$26,000.00 |
$17,206.16 |