Bid tab 200040

Let Jan 16, 2020 · · Ssr-276c(040)sr Sign up free

‹ Jan 2020 results

ALFALFA, WOODS RESURFACE (ASPHALT ) SH-8/SH-11: SH-8, FROM THE NS -257 JUNCTION EXTEND WEST. SH-11, FROM THE US -281 JUNCTION EXTEND EAST NEAR CAPRON . PROJECT LENGTH = 8.980 MILES

Let date
Thursday, January 16, 2020
Contract
200040
J/P numbers
32752(04)
District
County
Ssr-276c(040)sr
Highway
Limits
ALFALFA, WOODS RESURFACE (ASPHALT ) SH-8/SH-11: SH-8, FROM THE NS -257 JUNCTION EXTEND WEST. SH-11, FROM THE US -281 JUNCTION EXTEND EAST NEAR CAPRON . PROJECT LENGTH = 8.980 MILES
Project number
SSR-202C(043)SR

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,337,786
1 Venture Corporation dba VCO Paving Low bidder $1,562,641 +16.8%
2 THE CUMMINS CONSTRUCTION CO., INC. $1,829,103 +36.7% +17.1%

Bid tab: unit prices 17 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Venture Corpora…#2 THE CUMMINS CON…
1202(D) 0184 UNCLASSIFIED BORROW575CY $5.00 $2.00 $34.95
2202(H) 0185 EARTHWORK1LSUM $8,000.00 $15,000.00 $14,770.00
3407(C) 0301 (SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S13,500GAL $2.50 $2.25 $2.25
4411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)4,435TON $85.00 $101.00 $114.65
5411(I) 6310 SUPERPAVE, TYPE S4(PATCH)(PG64-22OK)250TON $125.00 $150.00 $287.00
6412 5267 COLD MILLING PAVEMENT1,000SY $4.00 $8.00 $11.40
7856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)43,205LF $0.4000 $0.3400 $0.3500
8202(D) 0184 UNCLASSIFIED BORROW1,150CY $5.00 $2.00 $20.10
9202(H) 0185 EARTHWORK1LSUM $8,000.00 $30,000.00 $14,685.00
10407(C) 0301 (SP) POLYMER MODIFIED CATIONIC RAPID SET - 1S21,650GAL $2.50 $2.25 $2.20
11411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)7,275TON $85.00 $101.00 $114.65
12411(I) 6310 SUPERPAVE, TYPE S4(PATCH)(PG64-22OK)250TON $125.00 $150.00 $287.00
13412 5267 COLD MILLING PAVEMENT800SY $4.00 $8.00 $10.10
14104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)2DAY $475.00 $475.00 $475.00
15856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)77,510LF $0.4000 $0.3400 $0.3500
16880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $16,000.00 $20,000.00 $6,000.00
17641 1552 MOBILIZATION1LSUM $95,000.00 $101,000.00 $123,700.00