BRIDGE REPAIR SH -9: REPAIR VEHICLE IMPACT DAMAGE OVER US-77, 4.1 MILES EAST OF THE I -35 INTERCHANGE IN NORMAN. PROJECT LENGTH = 0.000 MILE
- Let date
- Thursday, July 25, 2019
- Contract
- 190210
- J/P numbers
- 31553(04)
- District
- Division 3
- County
- Cleveland
- Highway
- Limits
- BRIDGE REPAIR SH -9: REPAIR VEHICLE IMPACT DAMAGE OVER US-77, 4.1 MILES EAST OF THE I -35 INTERCHANGE IN NORMAN. PROJECT LENGTH = 0.000 MILE
- Project number
- SAP-214N(095)ES
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | $30,824 | ||
| 1 | LOGOS CONSTRUCTION CO., LLC Low bidder | $33,552 | +8.9% | |
| 2 | Built Right Construction, LLC | $49,840 | +61.7% | +48.5% |
| 3 | GIBSON & ASSOCIATES, INC. | $56,638 | +83.7% | +68.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 LOGOS CONSTRUCT… | #2 Built Right Con… | #3 GIBSON & ASSOCI… |
|---|---|---|---|---|---|---|---|---|
| 1 | 540 4510 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 1 | LSUM | $25,000.00 | $27,688.00 | $40,000.00 | $52,900.00 |
| 2 | 876(A) 8482 | (PL)TRUCK MOUNTED ATTENUATOR | 7 | SD | $12.00 | $30.90 | $30.00 | $1.00 |
| 3 | 880(B) 8818 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 49 | SD | $0.3500 | $0.0300 | $0.0300 | $0.0100 |
| 4 | 880(B) 8821 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 133 | SD | $0.4500 | $0.0300 | $0.0300 | $0.0100 |
| 5 | 880(B) 8824 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 42 | SD | $1.35 | $5.15 | $5.00 | $0.0100 |
| 6 | 880(C) 8842 | CONSTRUCTION BARRICADES(TYPE III) | 105 | SD | $0.6500 | $0.0300 | $0.0300 | $0.0100 |
| 7 | 880(C) 8848 | WING BARRICADES | 7 | SD | $1.70 | $1.03 | $1.00 | $0.0100 |
| 8 | 880(E) 8860 | WARNING LIGHTS(TYPE A) | 245 | SD | $0.3000 | $0.0500 | $0.0500 | $0.0100 |
| 9 | 880(F) 8878 | DRUMS | 280 | SD | $0.2500 | $0.1000 | $0.1000 | $0.0100 |
| 10 | 880(G) 8890 | CHANNELIZER CONES | 154 | SD | $0.3000 | $1.03 | $1.00 | $0.0100 |
| 11 | 882(A) 8306 | PORT.CHANGEABLE MESSAGE SIGN | 21 | SD | $16.00 | $10.30 | $10.00 | $1.00 |
| 12 | 641 1399 | MOBILIZATION | 1 | LSUM | $5,000.00 | $5,000.00 | $9,000.00 | $3,700.00 |