| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 173 | CY |
$36.80 |
$24.00 |
$30.00 |
$34.37 |
$40.00 |
$62.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 205 | TON |
$30.00 |
$24.00 |
$25.50 |
$11.70 |
$30.00 |
$57.00 |
| 3 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 3,451 | SY |
$90.00 |
$85.00 |
$69.00 |
$88.66 |
$145.00 |
$227.00 |
| 4 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,055 | CY |
$210.00 |
$300.00 |
$325.00 |
$305.00 |
$350.00 |
$498.00 |
| 5 | 415 6300 |
CONCRETE JOINT SEALING | 33,236 | LF |
$1.50 |
$1.35 |
$1.61 |
$1.20 |
$1.80 |
$2.50 |
| 6 | 416 0100 |
DOWEL BAR RETROFIT | 2,856 | EA |
$30.00 |
$35.00 |
$45.50 |
$43.20 |
$45.00 |
$48.50 |
| 7 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 29,261 | SY |
$3.00 |
$3.25 |
$3.50 |
$2.15 |
$2.15 |
$4.73 |
| 8 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 24,600 | LF |
$0.6800 |
$0.7100 |
$0.6900 |
$0.7500 |
$0.6600 |
$0.6600 |
| 9 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,410 | LF |
$1.12 |
$1.35 |
$1.30 |
$0.8000 |
$1.25 |
$1.25 |
| 10 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 504 | LF |
$5.12 |
$3.24 |
$3.15 |
$11.00 |
$3.00 |
$3.00 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$75,000.00 |
$35,000.00 |
$106,000.00 |
$100,000.00 |
$50,000.00 |
| 12 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 49 | SD |
$30.00 |
$27.04 |
$26.25 |
$200.00 |
$25.00 |
$25.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$75,000.00 |
$123,000.00 |
$115,000.00 |
$300,000.00 |
$200,000.00 |