ODOT Jobs

Dec 2026 · 1 jobs · —
★ My Jobs

Filtered by: District: Division 8 Clear all

1 jobs · — estimated

ExcelCSV
Let date Contract / J/P County / Division Highway Description Estimate Status Added Low bidder
Dec 17, 2026 260227 T-26611A / T-26511B / T-26811A CreekDivision 8 TURNER TURNPIKE (OTA ACCESS) Grade, Drain, Bridge, And Surface TURNER TURNPIKE (OTA ACCESS): INTERCHANGE AT SH-16, SH-48, AND FRONTAGE ROADS NEAR BRISTOW. —553 items Advertised Nov 25 New
1–1 of 1

Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.