| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Dec 17, 2026 | 260227 T-26611A / T-26511B / T-26811A | CreekDivision 8 | TURNER TURNPIKE (OTA ACCESS) | Grade, Drain, Bridge, And Surface TURNER TURNPIKE (OTA ACCESS): INTERCHANGE AT SH-16, SH-48, AND FRONTAGE ROADS NEAR BRISTOW. | —553 items | Advertised | ||
| Dec 17, 2026 | 260285 EWC-28810A | ClevelandDivision 3 | TPK | Grade, Drain, Bridge And Surface TPK :TOBY KEITH EXPRESSWAY (OTA ACCESS): 0.5 MILES SOUTH FROM I-40 INTERCHANGE AT SE 89TH STREET IN OKLAHOMA CITY. | —108 items | Advertised | ||
| Dec 17, 2026 | 260286 EWC-28510A | ClevelandDivision 3 | TOBY KEITH EXPRESSWAY (OTA ACCESS) | Bridge And Approaches TOBY KEITH EXPRESSWAY (OTA ACCESS): OVER SE 104TH STREET, 1.5 MILES SOUTH OF THE I-40 INTERCHANGE IN THE CITY OF OKLAHOMA CITY. | —91 items | Advertised | ||
| Dec 17, 2026 | 260317 JKT-30601A | CanadianDivision 4 | OTA ACCESS | Grade, Drain, Bridge And Surface OTA ACCESS: JOHN KILPATRICK TURNPIKE (I-344): FROM 0.7 MILES SOUTH OF THE I-40 INTERCHANGE, EXTEND SOUTH NEAR MUSTANG. | —185 items | Advertised |
1–4 of 4
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.