Contract / J/P 270006

Division 7 · Caddo

‹ All ODOT jobs My Jobs

Resurface (Asphalt)

Advertised

US-62: FROM THE SH-9 JUNCTION, EXTEND SOUTH NEAR ANADARKO.

Let date
Thursday, January 14, 2027
Bids open
Jan 14, 2027 10:30 AM
Division
Division 7
County
Caddo
Highway
US-62
Project number
SSR-208B(150)SR
J/P numbers
38582(04)
Call order
511
Length
2.8 mi
Added
Nov 25, 2026
SeqBid codeDescriptionQuantityUnitAvg low price
Section 0001 · 3 items
10 411(H)1900 SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) 200TON
20 411(L)2428 BMD, TYPE B4 (PG 70-28 OK) 8,400TON
30 412 3100 COLD MILLING PAVEMENT 66,000SY
Section 0002 · 11 items
40 413(A)4200 RUMBLE STRIP-METHOD HMA-CON 29,600LF
50 413(A)4210 RUMBLE STRIP-CENTERLINE HMA-CON 14,785LF
60 413(B)4300 RUMBLE STRIP-METHOD HMA-CYC GROUP 3EAGP
70 856(A)8207 (SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) 45,000LF $0.6700
80 880(B)6300 CONSTRUCTION SIGNS 0 TO 6.25 SF 1,200SD $2.06
90 880(B)6310 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 700SD $0.3000
100 880(B)6320 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 1,300SD $0.2000
110 880(E)6600 WARNING LIGHTS(TYPE A) 1,100SD
120 880(G)6805 CHANNELIZER CONES 12,000SD
130 880(I)7000 FLAGGER 45SD
140 882(A)8210 PORT.CHANGEABLE MESSAGE SIGN 118SD $6.18