| 1 | AR108108 |
1/C #8 5 KV UG CABLE | 21,300 | FOOT |
|
$1.96 |
| 2 | AR109200 |
INSTALL ELECTRICAL EQUIPMENT | 1 | L SUM |
|
$21,810.00 |
| 3 | AR110012 |
2" DIRECTIONAL BORE | 1,290 | FOOT |
|
$26.40 |
| 4 | AR110202 |
2" PVC DUCT, DIRECT BURY | 15,750 | FOOT |
|
$11.53 |
| 5 | AR125400 |
REPLACE ISOLATION TRANSFORMER | 5 | EACH |
|
$618.13 |
| 6 | AR125511 |
MIRL, BASE MOUNTED-LED | 58 | EACH |
|
$2,589.60 |
| 7 | AR125512 |
MIRL, INPAVEMENT | 2 | EACH |
|
$5,217.60 |
| 8 | AR125546 |
MI THRESHOLD LIGHT BASE MTD-LED | 16 | EACH |
|
$2,472.00 |
| 9 | AR125561 |
RUNWAY DISTANCE REMAINING SIGN-LED | 5 | EACH |
|
$8,618.00 |
| 10 | AR125565 |
SPLICE CAN | 31 | EACH |
|
$1,641.60 |
| 11 | AR150510 |
ENGINEER'S FIELD OFFICE | 1 | L SUM |
|
$11,250.00 |
| 12 | AR150520 |
MOBILIZATION | 1 | L SUM |
|
$499,550.00 |
| 13 | AR150530 |
TRAFFIC MAINTENANCE | 1 | L SUM |
|
$69,614.00 |
| 14 | AR401614 |
BIT. SURF. CSE.-METHOD II, SUPERPAV | 14,885 | TON |
|
$151.43 |
| 15 | AR401640 |
BITUMINOUS PAVEMENT GROOVING | 68,627 | SQ YD |
|
$2.91 |
| 16 | AR401650 |
BITUMINOUS PAVEMENT MILLING | 18,982 | SQ YD |
|
$10.06 |
| 17 | AR401900 |
REMOVE BITUMINOUS PAVEMENT | 851 | SQ YD |
|
$46.66 |
| 18 | AR603510 |
BITUMINOUS TACK COAT | 25,886 | GALLON |
|
$5.12 |
| 19 | AR620520 |
PAVEMENT MARKING-WATERBORNE | 89,813 | SQ FT |
|
$1.43 |
| 20 | AR620525 |
PAVEMENT MARKING-BLACK BORDER | 18,889 | SQ FT |
|
$0.9400 |
| 21 | AR620590 |
TEMPORARY MARKING | 89,813 | SQ FT |
|
$1.43 |
| 22 | AR751943 |
ADJUST MANHOLE | 2 | EACH |
|
$3,944.00 |
| 23 | AR751952 |
ADJUST UNDERDRAIN STRUCTURE | 21 | EACH |
|
$3,944.00 |
| 24 | AR800476 |
REMOVE AIRFIELD LIGHTING | 1 | L SUM |
|
$55,330.00 |
| 25 | AR800552 |
CONCRETE MAINTENANCE PAD | 2 | EACH |
|
$39,700.00 |
| 26 | AR800564 |
CABLE & CCR TESTING & CALIBRATION | 1 | L SUM |
|
$6,624.00 |
| 27 | AR901510 |
SEEDING | 3.2 | ACRE |
|
$14,200.00 |
| 28 | AR905530 |
TOPSOILING | 15,573 | SQ YD |
|
$15.66 |
| 29 | AR908514 |
LIGHT-DUTY HYDRAULIC MULCH | 3.2 | ACRE |
|
$8,445.00 |