| 1 | AR150510 |
ENGINEER'S FIELD OFFICE | 1 | L.S. |
|
$6,750.00 |
$7,500.00 |
| 2 | AR150520 |
MOBILIZATION | 1 | L.S. |
|
$28,000.00 |
$38,000.00 |
| 3 | AR150530 |
TRAFFIC MAINTENANCE | 1 | L.S. |
|
$33,000.00 |
$20,000.00 |
| 4 | AR152410 |
UNCLASSIFIED EXCAVATION | 2,771 | C.Y. |
|
$25.00 |
$15.00 |
| 5 | AR156510 |
SILT FENCE | 3,500 | L.F. |
|
$2.25 |
$3.25 |
| 6 | AR156516 |
AGGREGATE DITCH CHECK | 2 | EACH |
|
$2,000.00 |
$1,385.00 |
| 7 | AR156520 |
INLET PROTECTION | 1 | EACH |
|
$450.00 |
$150.00 |
| 8 | AR156531 |
EROSION CONTROL BLANKET | 3,958 | S.Y. |
|
$1.55 |
$2.75 |
| 9 | AR156540 |
RIPRAP | 29 | S.Y. |
|
$50.00 |
$52.50 |
| 10 | AR208540 |
OVERSIZE AGGREGATE | 2,087 | TON |
|
$20.00 |
$18.00 |
| 11 | AR209510 |
CRUSHED AGGREGATE BASE COURSE | 2,782 | TON |
|
$22.00 |
$18.00 |
| 12 | AR209700 |
CRUSHED AGG. SHOULDER | 1,217 | S.Y. |
|
$10.00 |
$12.00 |
| 13 | AR401613 |
BIT. SURF. CSE.-METHOD I, SUPERPAVE | 620 | TON |
|
$120.00 |
$145.25 |
| 14 | AR401655 |
BUTT JOINT CONSTRUCTION | 32 | S.Y. |
|
$25.00 |
$41.50 |
| 15 | AR401900 |
REMOVE BITUMINOUS PAVEMENT | 3,641 | S.Y. |
|
$7.00 |
$6.50 |
| 16 | AR403613 |
BIT. BASE CSE.-METHOD I, SUPERPAVE | 1,255 | TON |
|
$100.00 |
$121.00 |
| 17 | AR602510 |
BITUMINOUS PRIME COAT | 1,935 | GAL. |
|
$7.00 |
$8.20 |
| 18 | AR603510 |
BITUMINOUS TACK COAT | 1,637 | GAL. |
|
$5.00 |
$6.00 |
| 19 | AR620520 |
PAVEMENT MARKING-WATERBORNE | 1,514 | S.F. |
|
$4.00 |
$1.50 |
| 20 | AR701518 |
18" RCP, CLASS IV | 8 | L.F. |
|
$150.00 |
$92.00 |
| 21 | AR752418 |
PRECAST REINFORCED CONC. FES 18" | 1 | EACH |
|
$950.00 |
$1,215.00 |
| 22 | AR752900 |
REMOVE END SECTION | 1 | EACH |
|
$225.00 |
$220.00 |
| 23 | AR800574 |
PAVEMENT MARKING-SPEC., ARR.-RIGHT | 4 | EACH |
|
$100.00 |
$110.00 |
| 24 | AR901510 |
SEEDING | 0.82 | ACRE |
|
$7,500.00 |
$6,500.00 |
| 25 | AR901520 |
TEMPORARY SEEDING | 0.82 | ACRE |
|
$2,800.00 |
$850.00 |
| 26 | AR904510 |
SODDING | 641 | S.Y. |
|
$8.00 |
$23.70 |