| 1 | AR108158 |
1/C #8 5 KV UG CABLE IN UD | 5,162 | L.F. |
|
$23.00 |
$9.27 |
| 2 | AR108706 |
1/C #6 COUNTERPOISE | 3,644 | L.F. |
|
$3.00 |
$8.36 |
| 3 | AR108960 |
REMOVE CABLE | 3,860 | L.F. |
|
$0.5000 |
$1.56 |
| 4 | AR110502 |
2-WAY CONCRETE ENCASED DUCT | 108 | L.F. |
|
$60.00 |
$149.61 |
| 5 | AR110610 |
ELECTRICAL HANDHOLE | 2 | EACH |
|
$3,420.00 |
$5,272.99 |
| 6 | AR125410 |
MITL-STAKE MOUNTED | 46 | EACH |
|
$1,000.00 |
$987.98 |
| 7 | AR125415 |
MITL-BASE MOUNTED | 2 | EACH |
|
$3,800.00 |
$2,754.56 |
| 8 | AR125901 |
REMOVE STAKE MOUNTED LIGHT | 21 | EACH |
|
$100.00 |
$180.26 |
| 9 | AR125902 |
REMOVE BASE MOUNTED LIGHT | 4 | EACH |
|
$400.00 |
$259.80 |
| 10 | AR125964 |
RELOCATE TAXI GUIDANCE SIGN | 1 | EACH |
|
$4,450.00 |
$10,688.30 |
| 11 | AR150510 |
ENGINEER'S FIELD OFFICE | 1 | L.S. |
|
$13,100.00 |
$19,338.47 |
| 12 | AR150520 |
MOBILIZATION | 1 | L.S. |
|
$120,000.00 |
$210,000.00 |
| 13 | AR150540 |
HAUL ROUTE | 1 | L.S. |
|
$30,000.00 |
$50,000.00 |
| 14 | AR152410 |
UNCLASSIFIED EXCAVATION | 2,745 | C.Y. |
|
$7.00 |
$27.32 |
| 15 | AR152441 |
ON-SITE BORROW | 1,528 | C.Y. |
|
$10.00 |
$35.99 |
| 16 | AR156510 |
SILT FENCE | 1,990 | L.F. |
|
$2.50 |
$2.50 |
| 17 | AR156511 |
DITCH CHECK | 2 | EACH |
|
$110.00 |
$108.01 |
| 18 | AR156513 |
SEPARATION FABRIC | 2,539 | S.Y. |
|
$2.00 |
$2.27 |
| 19 | AR156520 |
INLET PROTECTION | 2 | EACH |
|
$260.00 |
$256.02 |
| 20 | AR156530 |
TEMPORARY SEEDING | 1 | ACRE |
|
$2,500.00 |
$2,497.15 |
| 21 | AR201663 |
SAND MIX CRACK REPAIR | 21,125 | L.F. |
|
$2.40 |
$2.10 |
| 22 | AR209622 |
CRUSHED AGG. BASE COURSE - 22" | 2,773 | S.Y. |
|
$25.00 |
$21.16 |
| 23 | AR401614 |
BIT. SURF. CSE.-METHOD II, SUPERPAV | 4,166 | TON |
|
$85.00 |
$92.41 |
| 24 | AR401630 |
BITUMINOUS SURFACE TEST SECTION | 1 | EACH |
|
$5,000.00 |
$8,957.18 |
| 25 | AR401640 |
BITUMINOUS PAVEMENT GROOVING | 25,880 | S.Y. |
|
$4.00 |
$2.83 |
| 26 | AR401650 |
BITUMINOUS PAVEMENT MILLING | 35,290 | S.Y. |
|
$1.75 |
$2.07 |
| 27 | AR401900 |
REMOVE BITUMINOUS PAVEMENT | 1,245 | S.Y. |
|
$8.00 |
$4.75 |
| 28 | AR403613 |
BIT. BASE CSE.-METHOD I, SUPERPAVE | 356 | TON |
|
$90.00 |
$154.49 |
| 29 | AR602510 |
BITUMINOUS PRIME COAT | 838 | GAL. |
|
$0.0100 |
$4.27 |
| 30 | AR603510 |
BITUMINOUS TACK COAT | 5,675 | GAL. |
|
$0.0100 |
$2.79 |
| 31 | AR620520 |
PAVEMENT MARKING-WATERBORNE | 24,473 | S.F. |
|
$0.9500 |
$0.9500 |
| 32 | AR620525 |
PAVEMENT MARKING-BLACK BORDER | 6,060 | S.F. |
|
$1.50 |
$1.50 |
| 33 | AR620900 |
PAVEMENT MARKING REMOVAL | 310 | S.F. |
|
$8.00 |
$8.00 |
| 34 | AR701713 |
RCEP SPAN 30 RISE 19 | 352 | L.F. |
|
$75.00 |
$68.08 |
| 35 | AR705506 |
6" PERFORATED UNDERDRAIN | 1,000 | L.F. |
|
$24.10 |
$31.63 |
| 36 | AR705546 |
6" NON PERFORATED UNDERDRAIN | 170 | L.F. |
|
$25.00 |
$30.24 |
| 37 | AR705635 |
UNDERDRAIN COLLECTION STRUCTURE | 3 | EACH |
|
$1,300.00 |
$5,126.98 |
| 38 | AR705640 |
UNDERDRAIN CLEANOUT | 3 | EACH |
|
$1,200.00 |
$1,545.76 |
| 39 | AR752724 |
P R CONC. FES EQ. ROUND SIZE 24" | 4 | EACH |
|
$1,950.00 |
$1,218.68 |
| 40 | AR901510 |
SEEDING | 6 | ACRE |
|
$3,235.00 |
$3,233.20 |
| 41 | AR908510 |
MULCHING | 6 | ACRE |
|
$2,310.00 |
$2,300.14 |
| 42 | AS108158 |
1/C #8 5 KV UG CABLE IN UD | 11,110 | L.F. |
|
$23.10 |
$8.01 |
| 43 | AS108706 |
1/C #6 COUNTERPOISE | 11,848 | L.F. |
|
$3.00 |
$7.23 |
| 44 | AS108960 |
REMOVE CABLE | 124 | L.F. |
|
$0.5000 |
$1.45 |
| 45 | AS125400 |
REPLACE ISOLATION TRANSFORMER | 105 | EACH |
|
$515.00 |
$412.58 |