Bid tab LK015

Let Aug 5, 2022 · District 1 · Mchenry Start free trial

‹ Aug 2022 results

LAKE IN THE HILLS

Let date
Friday, August 5, 2022
Contract
LK015
District
District 1
County
Mchenry
Highway

Bidders 2

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 William Charles Construction Co, LLC Low bidder $1,163,002
2 Hecker and Company, Inc. $1,165,782 +0.2%

Bid tab: unit prices 32 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 William Charles…#2 Hecker and Comp…
1AR107408 L-806 WIND CONE-8' LIGHTED2EACH $12,023.51 $7,690.00
2AR108158 1/C #8 5 KV UG CABLE IN UD9,800FOOT $10.50 $6.00
3AR108258 2/C #8 5 KV UG CABLE IN UD800FOOT $9.04 $13.00
4AR108706 1/C #6 COUNTERPOISE9,850FOOT $3.37 $3.40
5AR109110 ERECT PREFABRICATED VAULT1L SUM $202,778.01 $291,000.00
6AR109321 10 KW REGULATOR, STYLE 12EACH $16,162.93 $18,500.00
7AR109400 POWER DISTRIBUTION SYSTEM1L SUM $25,872.52 $81,000.00
8AR109610 L-854 PCAL SYSTEM1L SUM $7,636.39 $6,480.00
9AR110012 2" DIRECTIONAL BORE405FOOT $44.95 $24.00
10AR110013 3" DIRECTIONAL BORE340FOOT $66.59 $29.00
11AR115615 ELECTRICAL HANDHOLE, HIGH VOLTAGE1EACH $18,914.25 $11,900.00
12AR115620 ELECTRICAL HANDHOLE, LOW VOLTAGE1EACH $18,914.25 $7,390.00
13AR125442 TAXI GUIDANCE SIGN, 2 CHARACTER4EACH $12,748.17 $8,140.00
14AR125443 TAXI GUIDANCE SIGN, 3 CHARACTER8EACH $12,849.21 $8,770.00
15AR125446 TAXI GUIDANCE SIGN, 6 CHARACTER3EACH $16,072.55 $10,700.00
16AR125505 MIRL, STAKE MOUNTED27EACH $1,173.51 $1,340.00
17AR125510 MIRL, BASE MOUNTED8EACH $2,958.71 $2,000.00
18AR125545 MI THRESHOLD LIGHT BASE MTD16EACH $1,469.72 $2,060.00
19AR125610 REILS2PAIR $37,957.19 $28,300.00
20AR125901 REMOVE STAKE MOUNTED LIGHT48EACH $174.43 $334.00
21AR125906 REMOVE SPLICE CAN10EACH $393.27 $218.00
22AR125912 REMOVE RETROREFLECTIVE MARKER16EACH $85.08 $50.00
23AR125968 RELOCATE PAPI2EACH $51,333.85 $26,300.00
24AR150510 ENGINEER'S FIELD OFFICE1L SUM $12,085.05 $21,400.00
25AR150520 MOBILIZATION1L SUM $57,283.13 $116,500.00
26AR800893 2-WAY 2" DIRECTIONAL BORE65FOOT $91.04 $42.50
27AR800894 3-WAY 3" DIRECTIONAL BORE65FOOT $97.49 $20.50
28AR800895 2-WAY 2" PVC SCHEDULE 80 CONDUIT, D60FOOT $49.63 $31.00
29AR800896 3-WAY 3" PVC SCHEDULE 80 CONDUIT, D60FOOT $69.12 $62.50
30AR800897 2 #6 XLP-USE, 1 #8 GND IN 1" UD5,870FOOT $10.81 $12.50
31AR800898 3 #6 XLP-USE, 1 #8 GND IN 1" UD540FOOT $12.01 $18.00
32AR800899 2 #8 XLP-USE, 1 #8 GND IN 1" UD1,260FOOT $13.12 $11.50