Bid tab LI039

Let Jan 15, 2021 · District 6 · Montgomery Start free trial

‹ Jan 2021 results

LITCHFIELD MUNICIPAL

Let date
Friday, January 15, 2021
Contract
LI039
District
District 6
County
Montgomery
Highway
Classification
·
Project number

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Stutz Excavating, Inc. Low bidder $995,976
2 Keller Construction, Inc. $1,112,047 +11.7%
3 Kamadulski Excavating and Grading Company, Inc. $1,217,006 +22.2%
4 Illinois Valley Paving, a div of UCM, Inc. $1,314,447 +32.0%

Bid tab: unit prices 50 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Stutz Excavatin…#2 Keller Construc…#3 Kamadulski Exca…#4 Illinois Valley…
1AR108158 1/C #8 5 KV UG CABLE IN UD4,753L.F. $6.30 $6.30 $7.30 $5.61
2AR110503 3-WAY CONCRETE ENCASED DUCT60L.F. $134.50 $134.40 $155.35 $93.50
3AR115610 ELECTRICAL HANDHOLE2EACH $4,410.00 $4,410.00 $5,098.00 $5,775.00
4AR125410 MITL-STAKE MOUNTED33EACH $840.00 $840.00 $971.00 $561.00
5AR125415 MITL-BASE MOUNTED10EACH $1,155.00 $1,155.00 $1,335.00 $1,265.00
6AR125443 TAXI GUIDANCE SIGN, 3 CHARACTER2EACH $6,300.00 $6,300.00 $7,280.00 $4,389.00
7AR125921 REPLACE STAKE MOUNTED LIGHT33EACH $368.00 $367.50 $425.00 $275.00
8AR125922 REPLACE BASE MOUNTED LIGHT5EACH $394.00 $393.75 $455.00 $275.00
9AR125932 REPLACE SIGN PANEL4EACH $630.00 $630.00 $730.00 $506.00
10AR150510 ENGINEER'S FIELD OFFICE1L.S. $8,300.00 $8,800.00 $18,202.00 $14,575.69
11AR150520 MOBILIZATION1L.S. $54,500.00 $101,938.00 $53,410.00 $115,938.66
12AR150540 HAUL ROUTE1L.S. $50,500.00 $44,092.00 $65,215.00 $81,517.44
13AR152410 UNCLASSIFIED EXCAVATION4,069C.Y. $11.75 $24.47 $14.50 $19.21
14AR154604 GRANULAR DRAINAGE SUBBASE - 4"7,730S.Y. $6.25 $7.89 $7.00 $13.14
15AR155540 BY-PRODUCT LIME200TON $125.00 $104.50 $184.00 $110.00
16AR155612 SOIL PROCESSING-12"8,130S.Y. $1.35 $1.73 $4.05 $5.05
17AR156510 SILT FENCE200L.F. $4.00 $4.60 $7.00 $8.96
18AR156513 SEPARATION FABRIC7,730S.Y. $0.7000 $1.53 $1.60 $2.60
19AR156520 INLET PROTECTION6EACH $150.00 $138.00 $182.00 $343.13
20AR156530 TEMPORARY SEEDING12ACRE $572.00 $627.00 $661.00 $599.50
21AR156531 EROSION CONTROL BLANKET650S.Y. $3.10 $2.20 $3.60 $3.25
22AR156543 RIPRAP-GRADATION NO. 3105S.Y. $65.00 $50.37 $54.75 $48.96
23AR209606 CRUSHED AGG. BASE COURSE - 6"7,730S.Y. $10.00 $10.79 $13.05 $18.21
24AR401613 BIT. SURF. CSE.-METHOD I, SUPERPAVE950TON $129.00 $130.35 $150.65 $103.02
25AR401650 BITUMINOUS PAVEMENT MILLING465S.Y. $18.00 $17.79 $20.60 $20.96
26AR401663 LONGITUDINAL JOINT SEALANT2,000L.F. $4.10 $3.43 $3.98 $4.53
27AR401900 REMOVE BITUMINOUS PAVEMENT470S.Y. $14.50 $14.25 $12.95 $19.58
28AR401910 REMOVE & REPLACE BIT. PAVEMENT66S.Y. $250.00 $235.00 $204.00 $353.35
29AR403613 BIT. BASE CSE.-METHOD I, SUPERPAVE950TON $119.00 $130.35 $150.65 $96.63
30AR602510 BITUMINOUS PRIME COAT2,200GAL. $4.50 $4.90 $5.68 $4.13
31AR603510 BITUMINOUS TACK COAT1,250GAL. $4.10 $0.0100 $0.0100 $4.01
32AR620520 PAVEMENT MARKING-WATERBORNE2,308S.F. $1.75 $1.73 $2.05 $1.82
33AR620525 PAVEMENT MARKING-BLACK BORDER2,380S.F. $2.75 $2.73 $3.20 $2.86
34AR620900 PAVEMENT MARKING REMOVAL220S.F. $1.60 $1.58 $1.85 $1.65
35AR701230 30" CMP25L.F. $92.00 $131.56 $175.00 $151.39
36AR701713 RCEP SPAN 30 RISE 1988L.F. $124.00 $117.96 $114.00 $129.56
37AR705506 6" PERFORATED UNDERDRAIN3,800L.F. $12.25 $14.78 $17.10 $15.49
38AR705546 6" NON PERFORATED UNDERDRAIN225L.F. $26.00 $17.20 $20.00 $18.02
39AR705610 CONCRETE HEADWALL FOR UNDERDRAIN2EACH $285.00 $436.80 $504.75 $457.60
40AR705635 UNDERDRAIN COLLECTION STRUCTURE4EACH $2,835.00 $5,177.00 $5,984.00 $5,423.00
41AR705640 UNDERDRAIN CLEANOUT10EACH $685.00 $934.00 $1,080.00 $978.32
42AR752418 PRECAST REINFORCED CONC. FES 18"4EACH $1,312.00 $1,267.00 $1,121.00 $1,491.22
43AR752724 P R CONC. FES EQ. ROUND SIZE 24"2EACH $1,565.00 $1,683.00 $1,144.00 $2,592.98
44AR800476 REMOVE AIRFIELD LIGHTING1L.S. $7,140.00 $7,140.00 $8,252.00 $1,155.00
45AR800564 CABLE & CCR TESTING & CALIBRATION1L.S. $840.00 $840.00 $971.00 $1,650.00
46AR800567 FILL PIPE WITH CLSM210L.F. $39.00 $50.51 $61.45 $119.38
47AR800568 16" HDPE PIPE305L.F. $74.00 $62.38 $71.00 $146.24
48AR800569 18" HDPE PIPE250L.F. $92.00 $77.49 $87.55 $162.69
49AR901510 SEEDING12ACRE $1,349.00 $2,436.00 $1,560.00 $1,413.50
50AR908510 MULCHING12ACRE $5,250.00 $2,437.00 $6,068.00 $5,500.00