| 1 | AR150510 |
ENGINEER'S FIELD OFFICE | 1 | L SUM |
|
$3,750.00 |
$4,500.00 |
| 2 | AR150520 |
MOBILIZATION | 1 | L SUM |
|
$37,500.00 |
$40,000.00 |
| 3 | AR150530 |
TRAFFIC MAINTENANCE | 1 | L SUM |
|
$10,500.00 |
$14,414.50 |
| 4 | AR152410 |
UNCLASSIFIED EXCAVATION | 774 | CU YD |
|
$20.00 |
$12.00 |
| 5 | AR152540 |
SOIL STABILIZATION FABRIC | 6,236 | SQ YD |
|
$1.50 |
$5.00 |
| 6 | AR154606 |
GRANULAR DRAINAGE SUBBASE - 6" | 6,236 | SQ YD |
|
$14.60 |
$13.00 |
| 7 | AR156510 |
SILT FENCE | 421 | FOOT |
|
$7.00 |
$5.50 |
| 8 | AR156520 |
INLET PROTECTION | 2 | EACH |
|
$300.00 |
$125.00 |
| 9 | AR201661 |
CLEAN & SEAL BITUMINOUS CRACKS | 1,200 | FOOT |
|
$4.80 |
$4.00 |
| 10 | AR209604 |
CRUSHED AGG. BASE COURSE - 4" | 6,236 | SQ YD |
|
$9.00 |
$11.00 |
| 11 | AR401613 |
BIT. SURF. CSE.-METHOD I, SUPERPAVE | 744 | TON |
|
$140.00 |
$135.00 |
| 12 | AR401660 |
SAW & SEAL BIT. JOINTS | 506 | FOOT |
|
$4.80 |
$6.00 |
| 13 | AR401900 |
REMOVE BITUMINOUS PAVEMENT | 6,157 | SQ YD |
|
$16.25 |
$20.00 |
| 14 | AR403613 |
BIT. BASE CSE.-METHOD I, SUPERPAVE | 744 | TON |
|
$125.00 |
$135.00 |
| 15 | AR510510 |
TIE DOWN | 16 | EACH |
|
$1,500.00 |
$1,800.00 |
| 16 | AR510900 |
REMOVE TIE DOWN | 16 | EACH |
|
$500.00 |
$300.00 |
| 17 | AR602510 |
BITUMINOUS PRIME COAT | 1,852 | GALLON |
|
$3.00 |
$6.00 |
| 18 | AR603510 |
BITUMINOUS TACK COAT | 433 | GALLON |
|
$4.00 |
$7.50 |
| 19 | AR620520 |
PAVEMENT MARKING-WATERBORNE | 1,695 | SQ FT |
|
$4.45 |
$5.00 |
| 20 | AR620525 |
PAVEMENT MARKING-BLACK BORDER | 1,695 | SQ FT |
|
$5.00 |
$5.50 |
| 21 | AR705506 |
6" PERFORATED UNDERDRAIN | 400 | FOOT |
|
$35.00 |
$65.00 |
| 22 | AR705630 |
UNDERDRAIN INSPECTION HOLE | 1 | EACH |
|
$1,300.00 |
$1,500.00 |
| 23 | AR705640 |
UNDERDRAIN CLEANOUT | 1 | EACH |
|
$1,300.00 |
$1,500.00 |
| 24 | AR901510 |
SEEDING | 0.3 | ACRE |
|
$7,350.00 |
$11,225.00 |
| 25 | AR905520 |
TOPSOILING (FROM OFF SITE) | 152 | CU YD |
|
$90.00 |
$20.00 |
| 26 | AR908510 |
MULCHING | 0.3 | ACRE |
|
$7,350.00 |
$11,225.00 |