| 1 | AW108108 |
1/C #8 5 KV UG CABLE | 610 | FOOT |
|
$3.36 |
| 2 | AW108158 |
1/C #8 5 KV UG CABLE IN UD | 5,270 | FOOT |
|
$9.54 |
| 3 | AW108208 |
2/C #8 5 KV UG CABLE | 11,230 | FOOT |
|
$5.34 |
| 4 | AW108258 |
2/C #8 5 KV UG CABLE IN UD | 820 | FOOT |
|
$10.60 |
| 5 | AW108706 |
1/C #6 COUNTERPOISE | 17,930 | FOOT |
|
$4.68 |
| 6 | AW110000 |
DIRECTIONAL BORE | 70 | FOOT |
|
$78.99 |
| 7 | AW110501 |
1-WAY CONC. ENCASED DUCT | 20 | FOOT |
|
$82.94 |
| 8 | AW110504 |
4-WAY CONCRETE ENCASED DUCT | 2,115 | FOOT |
|
$115.85 |
| 9 | AW110610 |
ELECTRICAL HANDHOLE | 4 | EACH |
|
$2,764.57 |
| 10 | AW110966 |
RELOCATE ELECTRICAL HANDHOLE | 1 | EACH |
|
$2,132.67 |
| 11 | AW125100 |
ELEVATED RETROREFLECTIVE MARKER | 1 | EACH |
|
$210.63 |
| 12 | AW125415 |
MITL-BASE MOUNTED | 19 | EACH |
|
$1,790.39 |
| 13 | AW125416 |
MITL-BASE MOUNTED-LED | 34 | EACH |
|
$1,843.04 |
| 14 | AW125420 |
TAXIWAY LIGHT INPAVEMENT | 1 | EACH |
|
$2,369.63 |
| 15 | AW125443 |
TAXI GUIDANCE SIGN, 3 CHARACTER | 3 | EACH |
|
$5,748.98 |
| 16 | AW125444 |
TAXI GUIDANCE SIGN, 4 CHARACTER | 2 | EACH |
|
$6,779.77 |
| 17 | AW125462 |
TAXI GUIDANCE SIGN, UNLIT | 2 | EACH |
|
$2,244.57 |
| 18 | AW125515 |
HIRL, BASE MOUNTED | 1 | EACH |
|
$2,007.60 |
| 19 | AW125565 |
SPLICE CAN | 1 | EACH |
|
$888.61 |
| 20 | AW125901 |
REMOVE STAKE MOUNTED LIGHT | 5 | EACH |
|
$78.99 |
| 21 | AW125902 |
REMOVE BASE MOUNTED LIGHT | 17 | EACH |
|
$276.46 |
| 22 | AW125903 |
REMOVE INPAVEMENT LIGHT | 1 | EACH |
|
$803.04 |
| 23 | AW125912 |
REMOVE RETROREFLECTIVE MARKER | 18 | EACH |
|
$276.46 |
| 24 | AW150510 |
ENGINEER'S FIELD OFFICE | 1 | L SUM |
|
$52,190.33 |
| 25 | AW152410 |
UNCLASSIFIED EXCAVATION | 20,010 | CU YD |
|
$10.50 |
| 26 | AW152511 |
SUBGRADE REPAIR | 250 | SQ YD |
|
$80.67 |
| 27 | AW154506 |
GRANULAR SUBBASE - 6" | 11,540 | SQ YD |
|
$62.23 |
| 28 | AW156510 |
SILT FENCE | 2,000 | FOOT |
|
$13.38 |
| 29 | AW156513 |
SEPARATION FABRIC | 250 | SQ YD |
|
$22.26 |
| 30 | AW156520 |
INLET PROTECTION | 13 | EACH |
|
$712.75 |
| 31 | AW209606 |
CRUSHED AGG. BASE COURSE - 6" | 11,540 | SQ YD |
|
$72.12 |
| 32 | AW401610 |
BITUMINOUS SURFACE COURSE | 2,750 | TON |
|
$267.42 |
| 33 | AW401650 |
BITUMINOUS PAVEMENT MILLING | 16,420 | SQ YD |
|
$21.63 |
| 34 | AW403610 |
BITUMINOUS BASE COURSE | 6,500 | TON |
|
$247.74 |
| 35 | AW501120 |
RUBBLIZE PAVEMENT | 16,420 | SQ YD |
|
$27.41 |
| 36 | AW501905 |
REMOVE PAVEMENT | 120 | SQ YD |
|
$327.19 |
| 37 | AW603510 |
BITUMINOUS TACK COAT | 5,100 | GALLON |
|
$11.08 |
| 38 | AW620520 |
PAVEMENT MARKING-WATERBORNE | 3,430 | SQ FT |
|
$2.06 |
| 39 | AW620525 |
PAVEMENT MARKING-BLACK BORDER | 4,670 | SQ FT |
|
$2.64 |
| 40 | AW701515 |
15" RCP, CLASS IV | 230 | FOOT |
|
$111.66 |
| 41 | AW701518 |
18" RCP, CLASS IV | 420 | FOOT |
|
$117.54 |
| 42 | AW705524 |
4" PERFORATED UNDERDRAIN W/SOCK | 3,780 | FOOT |
|
$36.44 |
| 43 | AW705544 |
4" NON PERFORATED UNDERDRAIN | 145 | FOOT |
|
$21.16 |
| 44 | AW705635 |
UNDERDRAIN COLLECTION STRUCTURE | 2 | EACH |
|
$3,291.15 |
| 45 | AW705640 |
UNDERDRAIN CLEANOUT | 7 | EACH |
|
$3,114.84 |
| 46 | AW705645 |
UNDERDRAIN CONNECTION | 7 | EACH |
|
$1,292.95 |
| 47 | AW751410 |
INLET | 9 | EACH |
|
$5,583.20 |
| 48 | AW751540 |
MANHOLE 4' | 1 | EACH |
|
$6,347.22 |
| 49 | AW751550 |
MANHOLE 5' | 1 | EACH |
|
$7,287.55 |
| 50 | AW751900 |
REMOVE INLET | 2 | EACH |
|
$940.33 |
| 51 | AW901510 |
SEEDING | 14.6 | ACRE |
|
$2,674.06 |
| 52 | AW904510 |
SODDING | 2,570 | SQ YD |
|
$37.03 |
| 53 | AW908515 |
HEAVY-DUTY HYDRAULIC MULCH | 14.6 | ACRE |
|
$4,642.87 |
| 54 | AW950110 |
ROADWAY SIGN, STOP | 1 | EACH |
|
$5,477.20 |
| 55 | AX109902 |
REMOVE ELECTRICAL EQUIPMENT | 1 | L SUM |
|
$5,265.84 |
| 56 | AX125901 |
REMOVE STAKE MOUNTED LIGHT | 21 | EACH |
|
$78.99 |
| 57 | AX125902 |
REMOVE BASE MOUNTED LIGHT | 12 | EACH |
|
$276.46 |
| 58 | AX125903 |
REMOVE INPAVEMENT LIGHT | 1 | EACH |
|
$803.04 |
| 59 | AX125904 |
REMOVE TAXI GUIDANCE SIGN | 5 | EACH |
|
$408.10 |
| 60 | AX125912 |
REMOVE RETROREFLECTIVE MARKER | 8 | EACH |
|
$408.10 |
| 61 | AX152410 |
UNCLASSIFIED EXCAVATION | 9,150 | CU YD |
|
$15.40 |
| 62 | AX152621 |
REMOVE CONCRETE | 113 | CU YD |
|
$144.16 |
| 63 | AX156520 |
INLET PROTECTION | 7 | EACH |
|
$665.80 |
| 64 | AX401650 |
BITUMINOUS PAVEMENT MILLING | 8,460 | SQ YD |
|
$20.84 |
| 65 | AX501120 |
RUBBLIZE PAVEMENT | 8,460 | SQ YD |
|
$25.05 |
| 66 | AX901510 |
SEEDING | 5.3 | ACRE |
|
$2,674.06 |
| 67 | AX908515 |
HEAVY-DUTY HYDRAULIC MULCH | 5.3 | ACRE |
|
$4,642.87 |
| 68 | AY152455 |
EMBANKMENT IN PLACE | 13,610 | CU YD |
|
$12.93 |
| 69 | AY156520 |
INLET PROTECTION | 3 | EACH |
|
$1,153.36 |
| 70 | AY401650 |
BITUMINOUS PAVEMENT MILLING | 15,170 | SQ YD |
|
$15.56 |
| 71 | AY501120 |
RUBBLIZE PAVEMENT | 20,410 | SQ YD |
|
$26.24 |
| 72 | AY901510 |
SEEDING | 6.2 | ACRE |
|
$2,674.06 |
| 73 | AY908515 |
HEAVY-DUTY HYDRAULIC MULCH | 6.2 | ACRE |
|
$4,642.87 |
| 74 | AZ108108 |
1/C #8 5 KV UG CABLE | 70 | FOOT |
|
$3.36 |
| 75 | AZ108158 |
1/C #8 5 KV UG CABLE IN UD | 1,620 | FOOT |
|
$9.54 |
| 76 | AZ108258 |
2/C #8 5 KV UG CABLE IN UD | 640 | FOOT |
|
$5.34 |
| 77 | AZ108706 |
1/C #6 COUNTERPOISE | 2,330 | FOOT |
|
$4.68 |
| 78 | AZ110504 |
4-WAY CONCRETE ENCASED DUCT | 60 | FOOT |
|
$76.35 |
| 79 | AZ110610 |
ELECTRICAL HANDHOLE | 2 | EACH |
|
$2,764.57 |
| 80 | AZ125416 |
MITL-BASE MOUNTED-LED | 15 | EACH |
|
$1,843.04 |
| 81 | AZ125443 |
TAXI GUIDANCE SIGN, 3 CHARACTER | 1 | EACH |
|
$6,492.79 |
| 82 | AZ125902 |
REMOVE BASE MOUNTED LIGHT | 13 | EACH |
|
$276.46 |
| 83 | AZ152410 |
UNCLASSIFIED EXCAVATION | 4,120 | CU YD |
|
$32.88 |
| 84 | AZ152511 |
SUBGRADE REPAIR | 100 | SQ YD |
|
$83.57 |
| 85 | AZ154506 |
GRANULAR SUBBASE - 6" | 4,740 | SQ YD |
|
$53.06 |
| 86 | AZ156513 |
SEPARATION FABRIC | 100 | SQ YD |
|
$21.92 |
| 87 | AZ156520 |
INLET PROTECTION | 12 | EACH |
|
$639.01 |
| 88 | AZ209606 |
CRUSHED AGG. BASE COURSE - 6" | 4,740 | SQ YD |
|
$60.13 |
| 89 | AZ401610 |
BITUMINOUS SURFACE COURSE | 1,020 | TON |
|
$193.19 |
| 90 | AZ403610 |
BITUMINOUS BASE COURSE | 2,540 | TON |
|
$201.50 |
| 91 | AZ603510 |
BITUMINOUS TACK COAT | 2,090 | GALLON |
|
$9.93 |
| 92 | AZ620520 |
PAVEMENT MARKING-WATERBORNE | 1,990 | SQ FT |
|
$1.70 |
| 93 | AZ620525 |
PAVEMENT MARKING-BLACK BORDER | 2,020 | SQ FT |
|
$2.17 |
| 94 | AZ620900 |
PAVEMENT MARKING REMOVAL | 11,320 | SQ FT |
|
$1.35 |
| 95 | AZ701518 |
18" RCP, CLASS IV | 680 | FOOT |
|
$117.54 |
| 96 | AZ701524 |
24" RCP, CLASS IV | 1,015 | FOOT |
|
$131.65 |
| 97 | AZ701900 |
REMOVE PIPE | 1,030 | FOOT |
|
$21.16 |
| 98 | AZ705524 |
4" PERFORATED UNDERDRAIN W/SOCK | 1,540 | FOOT |
|
$36.44 |
| 99 | AZ705640 |
UNDERDRAIN CLEANOUT | 3 | EACH |
|
$3,114.84 |
| 100 | AZ705645 |
UNDERDRAIN CONNECTION | 2 | EACH |
|
$1,292.95 |
| 101 | AZ751410 |
INLET | 6 | EACH |
|
$5,465.66 |
| 102 | AZ751560 |
MANHOLE 6' | 4 | EACH |
|
$8,698.04 |
| 103 | AZ751900 |
REMOVE INLET | 1 | EACH |
|
$940.33 |
| 104 | AZ901510 |
SEEDING | 4.8 | ACRE |
|
$2,674.06 |
| 105 | AZ904510 |
SODDING | 830 | SQ YD |
|
$37.03 |
| 106 | AZ908515 |
HEAVY-DUTY HYDRAULIC MULCH | 4.8 | ACRE |
|
$4,642.87 |