09-00132-00-RS
- Let date
- Friday, April 24, 2020
- Contract
- 93744 · job page
- District
- District 6
- County
- Montgomery
- Highway
- Limits
- Resurfacing CH 7 from the Christian County line to Nokomis Blacktop.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $2,144,394 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… |
|---|---|---|---|---|---|---|
| 1 | X0327423 | CONNECT EXIST CULVERT | 2 | EACH | $3,686.37 | |
| 2 | X4020700 | AGG SURF CSE B 8 | 110 | SQ YD | $60.09 | |
| 3 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $29,700.00 | |
| 4 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $20,828.50 | |
| 5 | Z0033700 | LONG JOINT SEALANT | 15,712 | FOOT | $3.69 | |
| 6 | Z0056608 | STORM SEW WM REQ 12 | 393 | FOOT | $117.00 | |
| 7 | Z0076600 | TRAINEES | 1,000 | HOUR | $0.8000 | |
| 8 | Z0076604 | TRAINEES TPG | 1,000 | HOUR | $15.00 | |
| 9 | 20200100 | EARTH EXCAVATION | 1,285 | CU YD | $78.28 | |
| 10 | 20400800 | FURNISHED EXCAVATION | 1,735 | CU YD | $64.17 | |
| 11 | 20800150 | TRENCH BACKFILL | 137 | CU YD | $102.75 | |
| 12 | 25000100 | SEEDING CL 1 | 4 | ACRE | $1,127.50 | |
| 13 | 25000400 | NITROGEN FERT NUTR | 383 | POUND | $1.27 | |
| 14 | 25000500 | PHOSPHORUS FERT NUTR | 383 | POUND | $1.27 | |
| 15 | 25000600 | POTASSIUM FERT NUTR | 383 | POUND | $1.27 | |
| 16 | 25100125 | MULCH METHOD 3 | 2 | ACRE | $2,777.50 | |
| 17 | 25100630 | EROSION CONTR BLANKET | 2,000 | SQ YD | $1.82 | |
| 18 | 28000250 | TEMP EROS CONTR SEED | 500 | POUND | $6.42 | |
| 19 | 28000305 | TEMP DITCH CHECKS | 100 | FOOT | $50.19 | |
| 20 | 28000500 | INLET & PIPE PROTECT | 5 | EACH | $699.55 | |
| 21 | 28100105 | STONE RIPRAP CL A3 | 160 | SQ YD | $66.35 | |
| 22 | 28200200 | FILTER FABRIC | 160 | SQ YD | $11.56 | |
| 23 | 40600982 | HMA SURF REM BUTT JT | 737 | SQ YD | $25.79 | |
| 24 | 40600990 | TEMPORARY RAMP | 314 | SQ YD | $8.86 | |
| 25 | 40603080 | HMA BC IL-19.0 N50 | 6,452 | TON | $92.20 | |
| 26 | 40604050 | HMA SC IL-9.5 C N50 | 4,302 | TON | $100.46 | |
| 27 | 40800050 | INCIDENTAL HMA SURF | 216 | TON | $256.69 | |
| 28 | 42400100 | PC CONC SIDEWALK 4 | 2,642 | SQ FT | $9.79 | |
| 29 | 42400800 | DETECTABLE WARNINGS | 27 | SQ FT | $38.50 | |
| 30 | 44000157 | HMA SURF REM 2 | 38,408 | SQ YD | $2.91 | |
| 31 | 44000600 | SIDEWALK REM | 2,405 | SQ FT | $6.24 | |
| 32 | 44201329 | CL C PATCH T2 8 | 768 | SQ YD | $166.10 | |
| 33 | 48102100 | AGG WEDGE SHLD TYPE B | 2,069 | TON | $21.56 | |
| 34 | 48203021 | HMA SHOULDERS 6 | 571 | SQ YD | $53.19 | |
| 35 | 50105220 | PIPE CULVERT REMOV | 30 | FOOT | $48.84 | |
| 36 | 54010603 | PCBC 6X3 | 50 | FOOT | $744.57 | |
| 37 | 542A0223 | P CUL CL A 1 18 | 30 | FOOT | $540.12 | |
| 38 | 542A8221 | P CUL CL A 2 EQRS 36 | 8 | FOOT | $920.51 | |
| 39 | 54205050 | P CUL SPEC 15 | 50 | FOOT | $70.76 | |
| 40 | 55100700 | STORM SEWER REM 15 | 252 | FOOT | $73.94 | |
| 41 | 60234200 | INLETS TA T1F OL | 2 | EACH | $1,851.67 | |
| 42 | 60235700 | INLETS TA T3F&G | 2 | EACH | $1,993.75 | |
| 43 | 60236600 | INLETS TA T9F&G | 1 | EACH | $2,019.92 | |
| 44 | 60603800 | COMB CC&G TB6.12 | 611 | FOOT | $51.70 | |
| 45 | 67100100 | MOBILIZATION | 1 | L SUM | $94,101.89 | |
| 46 | 78001110 | PAINT PVT MK LINE 4 | 35,485 | FOOT | $0.1700 | |
| 47 | 78100100 | RAISED REFL PAVT MKR | 197 | EACH | $36.58 | |
| 48 | 78200006 | GRDRAIL REF TYPE B | 10 | EACH | $118.35 |