D7 ITS 2020
- Let date
- Friday, April 24, 2020
- Contract
- 74897 · job page
- District
- District 7
- County
- Various
- Highway
- Limits
- Furnishing and installing overhead sign trusses and closed-circuit television cameras along various routes and rest areas throughout District 7. Also includes furnishing and installing equipment and software to connect DMS and CCTV to Operations Office.
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Bodine Electric of Decatur Low bidder | $1,110,050 | ||
| 2 | Capitol Construction Group, LLC d/b/a Egizii Electric | $1,264,153 | +13.9% | |
| 3 | Wissehr Electric, Inc. | $2,362,355 | +112.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Bodine Electric… | #2 Capitol Constru… | #3 Wissehr Electri… |
|---|---|---|---|---|---|---|---|---|
| 1 | X0323920 | POLE MT EQUIP CAB TB | 2 | EACH | $4,614.40 | $5,238.38 | $5,240.00 | |
| 2 | X0323923 | SUPPORT EQUIP & MAINT | 1 | L SUM | $4,493.27 | $4,977.98 | $7,525.00 | |
| 3 | X0324597 | CCTV CABINET | 12 | EACH | $2,601.37 | $3,106.36 | $7,288.00 | |
| 4 | X0324603 | CB 1P 20A/120V EX CAB | 12 | EACH | $116.64 | $128.03 | $600.00 | |
| 5 | X0325077 | FIB OPT UTILIT MARKER | 43 | EACH | $311.47 | $188.25 | $140.00 | |
| 6 | X0325485 | TR MTD LED DYN MSG SN | 2 | EACH | $71,978.87 | $69,785.03 | $197,000.00 | |
| 7 | X0326812 | CAT 5 ETHERNET CABLE | 1,261 | FOOT | $1.74 | $2.83 | $6.50 | |
| 8 | X0326905 | CCTV DOME CAM IP BASE | 15 | EACH | $3,715.11 | $6,166.06 | $14,267.00 | |
| 9 | X0327206 | DATA SERVER | 1 | L SUM | $23,741.09 | $22,500.00 | $29,875.00 | |
| 10 | X0327735 | CAMERA POLE 20 FT | 6 | EACH | $1,655.42 | $3,860.43 | $6,285.00 | |
| 11 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $45,000.00 | $33,333.37 | $75,975.00 | |
| 12 | X8710029 | FIB OPT CBL 24F SM | 28,792 | FOOT | $2.96 | $1.76 | $4.18 | |
| 13 | X8710050 | FO ETN DROP REPEAT SW | 17 | EACH | $571.12 | $2,667.47 | $1,780.00 | |
| 14 | Z0033052 | COMMUNICATIONS VAULT | 43 | EACH | $882.63 | $1,093.68 | $2,195.00 | |
| 15 | 63000001 | SPBGR TY A 6FT POSTS | 1,150 | FOOT | $27.69 | $25.15 | $31.85 | |
| 16 | 63100045 | TRAF BAR TERM T2 | 6 | EACH | $1,499.68 | $1,408.33 | $1,740.00 | |
| 17 | 63100167 | TR BAR TRM T1 SPL TAN | 6 | EACH | $3,979.92 | $3,903.83 | $5,070.00 | |
| 18 | 67100100 | MOBILIZATION | 1 | L SUM | $5,000.00 | $20,853.70 | $293,321.00 | |
| 19 | 72501000 | TERMINAL MARKER - DA | 6 | EACH | $28.84 | $54.25 | $72.50 | |
| 20 | 73300300 | OVHD SIN STR-SPAN T3A | 168 | FOOT | $909.04 | $1,406.16 | $1,877.00 | |
| 21 | 73301810 | OSS WALKWAY TY A | 102 | FOOT | $326.47 | $414.47 | $554.00 | |
| 22 | 73400200 | DRILL SHAFT CONC FDN | 58.2 | CU YD | $1,655.42 | $1,758.79 | $2,269.00 | |
| 23 | 78200005 | GRDRAIL REF TYPE A | 24 | EACH | $13.84 | $10.85 | $14.50 | |
| 24 | 80400100 | ELECT SERV INSTALL | 2 | EACH | $2,722.50 | $5,074.55 | $16,341.00 | |
| 25 | 81028320 | UNDRGRD C PVC 1 | 515 | FOOT | $13.70 | $6.81 | $19.22 | |
| 26 | 81028350 | UNDRGRD C PVC 2 | 26,865 | FOOT | $6.07 | $5.95 | $6.80 | |
| 27 | 81028370 | UNDRGRD C PVC 3 | 90 | FOOT | $23.53 | $24.82 | $34.65 | |
| 28 | 81100600 | CON AT ST 2 GALVS | 15 | FOOT | $30.21 | $53.09 | $170.00 | |
| 29 | 81300550 | JUN BX SS AS 12X12X6 | 2 | EACH | $942.14 | $1,020.99 | $1,320.00 | |
| 30 | 81300948 | JUN BX SS AS 24X24X10 | 1 | EACH | $1,855.21 | $1,856.44 | $3,870.00 | |
| 31 | 81603040 | UD 2#6 #8G XLPUSE 1 | 1,816 | FOOT | $3.91 | $8.08 | $12.40 | |
| 32 | 81702130 | EC C XLP USE 1C 6 | 32,738 | FOOT | $1.75 | $1.34 | $1.20 | |
| 33 | 83060840 | LT P GS 50MH TEN MT | 3 | EACH | $3,179.32 | $4,525.00 | $6,820.00 | |
| 34 | 83600358 | LP F M 15BC 8 5/8X8 | 3 | EACH | $1,009.40 | $1,315.02 | $3,445.00 | |
| 35 | 87301795 | ELCBL C SERV 3 1C | 7,038 | FOOT | $2.83 | $2.51 | $4.10 | |
| 36 | 87900100 | DRILL EX FOUNDATION | 2 | EACH | $442.98 | $648.83 | $465.00 | |
| 37 | 87900200 | DRILL EX HANDHOLE | 9 | EACH | $516.24 | $616.82 | $400.00 |