(69-1,1X,2)RS1,PP1;(23)RS8,PP
- Let date
- Friday, June 17, 2022
- Contract
- 72N33 · job page
- District
- District 6
- County
- Morgan
- Highway
- Limits
- 10 miles of ultra-thin bonded wearing course on top of jointed PCC pavement at various locations: US 67/IL 104 from Mauvaise Terre Creek, approximately 1.3 miles east of CH 7 (Concord / Arenzville Road), to east of the US 67/IL 104 Interchange; US 67/IL 104 Interchange to south of I-72 BUS Interchange; and on I-72 BUS at the US 67 Interchange.
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Illinois Valley Paving, a div of UCM, Inc. Low bidder | $4,055,098 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Illinois Valley… |
|---|---|---|---|---|---|---|
| 1 | X0300031 | UT BON W CRS IL 9.5 UTB MIX D | 200,450 | SQ YD | $12.89 | |
| 2 | X0320089 | TRAFFIC COUNTER- TIRTL SYSTEM | 1 | EACH | $29,150.00 | |
| 3 | X1700035 | CLASS SI CONC | 6 | CU YD | $2,206.24 | |
| 4 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $26,415.92 | |
| 5 | Z0034105 | MATL TRANSFER DEVICE | 7,517 | TON | $10.51 | |
| 6 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | |
| 7 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | |
| 8 | 40600250 | RAP SET POLY MOD EMUL | 288,648 | POUND | $0.5000 | |
| 9 | 40600900 | HMA BC HM N50 | 2 | TON | $2,089.66 | |
| 10 | 40600982 | HMA SURF REM BUTT JT | 60 | SQ YD | $31.00 | |
| 11 | 40600985 | PCC SURF REM BUTT JT | 841 | SQ YD | $31.00 | |
| 12 | 40600990 | TEMPORARY RAMP | 141 | SQ YD | $16.53 | |
| 13 | 67000400 | ENGR FIELD OFFICE A | 6 | CAL MO | $3,799.78 | |
| 14 | 67100100 | MOBILIZATION | 1 | L SUM | $475,381.68 | |
| 15 | 70100420 | TRAF CONT-PROT 701411 | 6 | EACH | $4,333.02 | |
| 16 | 70100460 | TRAF CONT-PROT 701306 | 1 | L SUM | $6,226.68 | |
| 17 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $206,592.87 | |
| 18 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $23,321.04 | |
| 19 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $11,684.83 | |
| 20 | 70107025 | CHANGEABLE MESSAGE SN | 350 | CAL DA | $109.00 | |
| 21 | 70300100 | SHORT TERM PAVT MKING | 12,389 | FOOT | $1.50 | |
| 22 | 70300150 | SHRT TRM PAVT MK REM | 4,159 | SQ FT | $3.63 | |
| 23 | 70300211 | TEMP PVT MK LTR & SYM PAINT | 1,244 | SQ FT | $0.0100 | |
| 24 | 70300231 | TEMP PVT MK LINE 5 - PAINT | 165,893 | FOOT | $0.0100 | |
| 25 | 70300241 | TEMP PVT MK LINE 6 - PAINT | 4,298 | FOOT | $0.0100 | |
| 26 | 70300251 | TEMP PVT MK LINE 8 - PAINT | 8,846 | FOOT | $0.0100 | |
| 27 | 70300261 | TEMP PVT MK LINE 12 - PAINT | 1,058 | FOOT | $0.0100 | |
| 28 | 70300281 | TEMP PVT MK LINE 24 - PAINT | 122 | FOOT | $0.0100 | |
| 29 | 72700100 | STR STL SIN SUP BA | 520 | POUND | $5.89 | |
| 30 | 73400100 | CONC FOUNDATION | 1.4 | CU YD | $3,025.00 | |
| 31 | 78009000 | MOD URETH PM LTR-SYM | 1,244 | SQ FT | $13.20 | |
| 32 | 78009005 | MOD URETH PM LINE 5 | 165,893 | FOOT | $0.7300 | |
| 33 | 78009006 | MOD URETH PM LINE 6 | 4,298 | FOOT | $0.9900 | |
| 34 | 78009008 | MOD URETH PM LINE 8 | 8,846 | FOOT | $1.38 | |
| 35 | 78009012 | MOD URETH PM LINE 12 | 1,058 | FOOT | $13.20 | |
| 36 | 78009024 | MOD URETH PM LINE 24 | 122 | FOOT | $16.50 | |
| 37 | 78100100 | RAISED REFL PAVT MKR | 1,249 | EACH | $33.95 | |
| 38 | 78200020 | CURB REFLECTORS | 102 | EACH | $5.50 | |
| 39 | 78300200 | RAISED REF PVT MK REM | 1,249 | EACH | $37.83 |