(54-4)RS-4,BRR,BDR,BJR-1
Bidders 1
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | R. A. Cullinan and Son, a div of UCM, Inc. Low bidder | $7,406,232 |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 R. A. Cullinan … |
|---|---|---|---|---|---|---|
| 1 | X0320157 | CLEAN UNDERDR OUTLET | 18 | EACH | $26.40 | |
| 2 | X0322279 | OUTLET MARKER | 141 | EACH | $45.10 | |
| 3 | X0325893 | CLEAN EX END SECTION | 7 | EACH | $412.50 | |
| 4 | X4404260 | PAVED SHLD REMOVAL SP | 17,620 | SQ YD | $15.93 | |
| 5 | X5420624 | PIPE CULV CLEANED 24 | 520 | FOOT | $38.50 | |
| 6 | X6350120 | DELINEATOR REMOVAL | 187 | EACH | $28.71 | |
| 7 | X7011800 | TRAF CONT-PROT BLR 21 | 1 | L SUM | $1,911.92 | |
| 8 | X7011801 | TRAF CONT-PROT BLR 22 | 1 | L SUM | $1,911.92 | |
| 9 | X7830072 | GRV RCSD PVT MRKG 6 | 73,173 | FOOT | $0.4400 | |
| 10 | Z0005300 | BOX CUL TO BE CLEANED | 1 | EACH | $22,000.00 | |
| 11 | Z0012754 | STR REP CON DP = < 5 | 180 | SQ FT | $460.26 | |
| 12 | Z0016002 | DECK SLAB REP (FD-T2) | 9 | SQ YD | $3,240.48 | |
| 13 | Z0016200 | DECK SLAB REP (PART) | 131 | SQ YD | $407.67 | |
| 14 | Z0032500 | JT SEALING (PATCHES) | 1,314 | FOOT | $4.90 | |
| 15 | Z0033700 | LONG JOINT SEALANT | 32,058 | FOOT | $2.50 | |
| 16 | Z0034105 | MATL TRANSFER DEVICE | 24,157 | TON | $3.27 | |
| 17 | Z0040530 | PIPE UNDERDRAIN REMOV | 24,364 | FOOT | $4.68 | |
| 18 | Z0076600 | TRAINEES | 3,000 | HOUR | $0.8000 | |
| 19 | Z0076604 | TRAINEES TPG | 3,000 | HOUR | $15.00 | |
| 20 | 20100110 | TREE REMOV 6-15 | 58 | UNIT | $94.60 | |
| 21 | 20200100 | EARTH EXCAVATION | 6,626 | CU YD | $14.85 | |
| 22 | 20200600 | EXC & GR EX SHOULDER | 22 | UNIT | $338.00 | |
| 23 | 21400100 | GRADING & SHAP DITCH | 2,679 | FOOT | $15.95 | |
| 24 | 25000200 | SEEDING CL 2 | 4 | ACRE | $1,314.50 | |
| 25 | 25000400 | NITROGEN FERT NUTR | 355 | POUND | $1.10 | |
| 26 | 25000500 | PHOSPHORUS FERT NUTR | 355 | POUND | $1.10 | |
| 27 | 25000600 | POTASSIUM FERT NUTR | 355 | POUND | $1.10 | |
| 28 | 25000700 | AGR GROUND LIMESTONE | 8 | TON | $66.00 | |
| 29 | 25100115 | MULCH METHOD 2 | 4 | ACRE | $1,314.50 | |
| 30 | 28000305 | TEMP DITCH CHECKS | 76 | FOOT | $16.50 | |
| 31 | 28100805 | STONE DUMP RIP CL A3 | 301 | TON | $99.00 | |
| 32 | 31101900 | SUB GRAN MAT C | 6,869 | TON | $44.00 | |
| 33 | 40600290 | BIT MATLS TACK CT | 95,489 | POUND | $1.89 | |
| 34 | 40600990 | TEMPORARY RAMP | 339 | SQ YD | $13.59 | |
| 35 | 40603235 | P HMA BC IL19.0 N70 | 15,631 | TON | $108.02 | |
| 36 | 40604162 | P HMA SC IL-9.5 D N70 | 8,526 | TON | $121.15 | |
| 37 | 40800050 | INCIDENTAL HMA SURF | 39 | TON | $316.67 | |
| 38 | 44000155 | HMA SURF REM 1 1/2 | 44,068 | SQ YD | $1.97 | |
| 39 | 44000166 | HMA SURF REM 4 1/4 | 101,498 | SQ YD | $4.41 | |
| 40 | 48102100 | AGG WEDGE SHLD TYPE B | 1,468 | TON | $36.30 | |
| 41 | 48203023 | HMA SHOULDERS 6 1/2 | 18,461 | SQ YD | $38.81 | |
| 42 | 48203100 | HMA SHOULDERS | 5,214 | TON | $107.24 | |
| 43 | 50102400 | CONC REM | 67 | CU YD | $2,277.58 | |
| 44 | 50157300 | PROTECTIVE SHIELD | 530 | SQ YD | $128.98 | |
| 45 | 50300255 | CONC SUP-STR | 80 | CU YD | $2,576.68 | |
| 46 | 50300300 | PROTECTIVE COAT | 281 | SQ YD | $5.08 | |
| 47 | 50800205 | REINF BARS, EPOXY CTD | 12,470 | POUND | $7.06 | |
| 48 | 52000110 | PREF JT STRIP SEAL | 72 | FOOT | $289.29 | |
| 49 | 60100060 | CONC HDWL FOR P DRAIN | 47 | EACH | $631.29 | |
| 50 | 60108100 | PIPE UNDERDRAIN 4 SP | 796 | FOOT | $42.02 | |
| 51 | 60108104 | PIPE UNDERDR T 1 4 | 24,364 | FOOT | $4.40 | |
| 52 | 63000001 | SPBGR TY A 6FT POSTS | 200 | FOOT | $34.70 | |
| 53 | 63100085 | TRAF BAR TERM T6 | 4 | EACH | $4,794.47 | |
| 54 | 63100167 | TR BAR TRM T1 SPL TAN | 4 | EACH | $1,924.10 | |
| 55 | 63200310 | GUARDRAIL REMOV | 350 | FOOT | $12.62 | |
| 56 | 63500105 | DELINEATORS | 187 | EACH | $60.50 | |
| 57 | 64200116 | SHOULDER RUM STRIP 16 | 57,287 | FOOT | $0.3000 | |
| 58 | 67000400 | ENGR FIELD OFFICE A | 9 | CAL MO | $2,778.21 | |
| 59 | 67100100 | MOBILIZATION | 1 | L SUM | $111,869.09 | |
| 60 | 70100420 | TRAF CONT-PROT 701411 | 4 | EACH | $2,150.94 | |
| 61 | 70100800 | TRAF CONT-PROT 701401 | 1 | L SUM | $127,016.62 | |
| 62 | 70100820 | TRAF CONT-PROT 701451 | 1 | L SUM | $7,647.78 | |
| 63 | 70100825 | TRAF CONT-PROT 701456 | 1 | L SUM | $1,881.69 | |
| 64 | 70103815 | TR CONT SURVEILLANCE | 50 | CAL DA | $0.0100 | |
| 65 | 70107025 | CHANGEABLE MESSAGE SN | 240 | CAL DA | $91.87 | |
| 66 | 70300100 | SHORT TERM PAVT MKING | 11,616 | FOOT | $2.05 | |
| 67 | 70300150 | SHRT TRM PAVT MK REM | 1,934 | SQ FT | $5.94 | |
| 68 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $25.24 | |
| 69 | 73700200 | REM CONC FDN-GR MT | 1 | EACH | $1,165.98 | |
| 70 | 78004200 | PREF PL PM TB INL L&S | 155 | SQ FT | $31.55 | |
| 71 | 78004220 | PREF PL PM TB INL L5 | 7,134 | FOOT | $3.84 | |
| 72 | 78004230 | PREF PL PM TB INL L6 | 582 | FOOT | $5.36 | |
| 73 | 78004240 | PREF PL PM TB INL L8 | 3,179 | FOOT | $7.44 | |
| 74 | 78004250 | PREF PL PM TB INL L12 | 467 | FOOT | $12.68 | |
| 75 | 78004280 | PREF PL PM TB INL L24 | 72 | FOOT | $31.01 | |
| 76 | 78009005 | MOD URETH PM LINE 5 | 73,173 | FOOT | $0.5500 | |
| 77 | 78009008 | MOD URETH PM LINE 8 | 307 | FOOT | $1.10 | |
| 78 | 78009012 | MOD URETH PM LINE 12 | 190 | FOOT | $22.00 | |
| 79 | 78100100 | RAISED REFL PAVT MKR | 723 | EACH | $26.54 | |
| 80 | 78200005 | GRDRAIL REF TYPE A | 29 | EACH | $10.09 | |
| 81 | 78200011 | BARR WALL REF TYPE C | 12 | EACH | $45.53 | |
| 82 | 78300200 | RAISED REF PVT MK REM | 723 | EACH | $15.52 |