| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X1400025 | JUNCTION BOX COVER | EACH | 2 | $264.56 | Jun 17, 2022 |
| X1400028 | REM RADIO INTERCONNCT | EACH | 2 | $1,847.39 | Sep 23, 2022 |
| X1400038 | 250W-240V HPS BALLAST | EACH | 2 | $71.81 | Mar 5, 2021 |
| X1400053 | BA COU T 4100 | SET | 2 | $394.38 | Mar 5, 2021 |
| X1400065 | 1 INCH UNIDUCT | FOOT | 2 | $0.4500 | Mar 5, 2021 |
| X1400087 | SH P LED 1F 3S MAM SP | EACH | 2 | $1,135.00 | Nov 17, 2023 |
| X1400154 | TEMP AERFOC 96 SNGL M | FOOT | 2 | $6.46 | Jan 15, 2021 |
| X1400184 | REM WEIGH-IN-MOT COMP | L SUM | 2 | $20,500.00 | Aug 5, 2022 |
| X1400191 | MAINT LTG SYS LOC 1 | CAL MO | 2 | $1,367.27 | Jul 12, 2019 |
| X1400192 | MAINT LTG SYS LOC 2 | CAL MO | 2 | $1,137.27 | Jul 12, 2019 |
| X1400193 | MAINT LTG SYS LOC 3 | CAL MO | 2 | $1,959.54 | Jul 12, 2019 |
| X1400212 | LUM LED HM VRY LOW WT | EACH | 2 | $893.00 | Apr 26, 2019 |
| X1400225 | SLR LED LGHT UNIT CMP | EACH | 2 | $6,250.13 | Apr 25, 2025 |
| X1400239 | CCTV CAM P MT/BRK ARM | EACH | 2 | $6,437.50 | Apr 24, 2026 |
| X1400275 | MOD EXST LGHT TWR CP | EACH | 2 | $3,196.43 | Jun 15, 2018 |
| X1400285 | EC C (EPR-TU)2C 4 6GR | FOOT | 2 | $9.82 | Jun 17, 2022 |
| X1400286 | CAB HSG EQ ESP 2 PM | EACH | 2 | $15,750.00 | Jun 17, 2022 |
| X1400290 | BUDG ALLOW UG PLC CTL | L SUM | 2 | $600,000.00 | Jun 17, 2022 |
| X1400294 | BRIDGE GROUNDING SYSTEM | L SUM | 2 | $20,760.50 | Mar 9, 2018 |
| X1400295 | REFLECTOR PANEL ASSEMBLIES | L SUM | 2 | $10,012.50 | Mar 9, 2018 |
| X1400298 | ELEC CONDUIT HDD MTHD | FOOT | 2 | $816.51 | Nov 8, 2024 |
| X1400313 | SYSTEMS INTEGRATION | L SUM | 2 | $490,725.40 | Jan 21, 2022 |
| X1400324 | STL MAA & P 48 SPL | EACH | 2 | $18,381.67 | Sep 18, 2020 |
| X1400339 | LUM UNDRPASS LED LOWW | EACH | 2 | $1,646.67 | Apr 26, 2019 |
| X1400345 | REM HWY ADVSRY RADIO | L SUM | 2 | $2,059.70 | Apr 24, 2020 |
| X1400348 | GEOTECH INSTRMNT ADJ | EACH | 2 | $2,220.00 | Mar 5, 2021 |
| X1400354 | S MMA & P 52 LT ARM15 40 MH | EACH | 2 | $18,250.00 | Jun 12, 2020 |
| X1400355 | S MMA & P 54 LT ARM15 40 MH | EACH | 2 | $23,245.00 | Apr 26, 2024 |
| X1400371 | MAST ARM ST LTG 4 | EACH | 2 | $874.79 | Nov 6, 2020 |
| X1400375 | DMX CONTROL CABLE IN CONDUIT | FOOT | 2 | $11.67 | Apr 26, 2024 |
| X1400383 | FXD POS CCTV CAMERA | EACH | 2 | $16,595.67 | Sep 20, 2024 |
| X1400390 | REPL EX CCTV CAM/LDV 80 M.H. | EACH | 2 | $11,648.57 | Jun 17, 2022 |
| X1400393 | REPL EX CCTV CAM P MT 50 M.H. | EACH | 2 | $3,592.99 | Jun 17, 2022 |
| X1400400 | IND LUM TEST | LSUM | 2 | $4,801.52 | Jun 11, 2021 |
| X1400415 | RAMP METER CONROLLER | EACH | 2 | $5,828.67 | Jun 12, 2020 |
| X1400418 | RACK SEC 2 WIRE | EACH | 2 | $943.70 | Jun 14, 2024 |
| X1400419 | LIGHTING UNIT (IO) | EACH | 2 | $1,041.67 | Apr 23, 2021 |
| X1400432 | R & R SH IN DR P & CN | EACH | 2 | $1,073.40 | Jun 16, 2023 |
| X1400433 | REMOVE TELEPHONE KIOSK | EACH | 2 | $437.33 | Jul 30, 2021 |
| X1400436 | FO JUMPER, SM | EACH | 2 | $89.07 | Jun 13, 2025 |
| X1400443 | MOD CIR BRKR PAN SPL | EACH | 2 | $575.00 | Apr 29, 2022 |
| X1400457 | DMS SGN CNTRL EQUIPT | EACH | 2 | $17,641.78 | Feb 27, 2026 |
| X1400473 | EX DC LT POLE/FDN REM | EACH | 2 | $1,193.05 | Mar 7, 2025 |
| X1400479 | EM GEN AUTOMTC TRANS SW LOC 1 | EACH | 2 | $91,484.00 | Jan 16, 2026 |
| X1400481 | LED IN IL SM SGN/VCBL | EACH | 2 | $709.95 | Apr 25, 2025 |
| X1400482 | REM TEMP LIGHT UNIT SAL | EACH | 2 | $2,771.81 | Jun 16, 2023 |
| X1400483 | VID & RAD HYB DET SYS | EACH | 2 | $41,733.19 | Apr 29, 2022 |
| X1400486 | UNINTER PS UPS | EACH | 2 | $7,800.51 | Sep 19, 2025 |
| X1400494 | AS LD ST LT 4W/FT WHT | FOOT | 2 | $265.33 | Jan 19, 2024 |
| X1400496 | AS LD ST LT DR 24V PS | EACH | 2 | $1,909.09 | Jan 19, 2024 |
| X1400498 | REL LT UNT & POLE SPL | EACH | 2 | $2,625.00 | Apr 24, 2026 |
| X1400499 | SIG PERFORM MEAS SERV | EACH | 2 | $109,205.00 | Jan 17, 2025 |
| X1400502 | ATMS SOFTWARE SUPPORT | L SUM | 2 | $88,787.50 | Nov 18, 2022 |
| X1400506 | S MMA & P 64 LT ARM15 40 MH | EACH | 2 | $30,662.29 | Apr 26, 2024 |
| X1400508 | REM LP AND FIX (SPECIAL) NO SALV | EACH | 2 | $477.60 | Jul 31, 2026 |
| X1400511 | L3 FO XFER MOD SFP LD | EACH | 2 | $1,680.56 | Jun 13, 2025 |
| X1400520 | THHN WIRE PVC TUBE 19/27 AWG | FOOT | 2 | $7.80 | Nov 17, 2023 |
| X1500002 | BLOTTER AGGREGATE | TON | 2 | $154.04 | Mar 10, 2023 |
| X1600003 | MICRO-SURF 2 PASS ME | SQ YD | 2 | $5.55 | Jun 14, 2019 |
| X1700053 | MONUMENT TY A FOUNDTN | EACH | 2 | $780.00 | Jun 14, 2024 |
| X1700061 | CL A PATCH T4 17 SPL | SQ YD | 2 | $228.33 | Apr 28, 2023 |
| X1700078 | RMV RE EX S BAR WALL | FOOT | 2 | $172.73 | Mar 8, 2019 |
| X1700110 | CONC BAR DBL FC 44 SP | FOOT | 2 | $190.71 | Mar 8, 2024 |
| X1700119 | CONCRETE FINISH | L SUM | 2 | $45,000.00 | Jun 16, 2023 |
| X1800001 | S-VIBURN DEN RST 24,5 | EACH | 2 | $58.62 | Mar 10, 2023 |
| X1800011 | T-AESCULUS C FM 2C BB | EACH | 2 | $487.86 | Jan 20, 2023 |
| X1800013 | T-GLED TR-I DRV 2 | EACH | 2 | $558.26 | Jan 20, 2023 |
| X1800014 | T-DIE KOD ORNG 24H 5G | EACH | 2 | $60.79 | Jan 18, 2019 |
| X1800021 | T-VIB PRUN BH VIB 2" | EACH | 2 | $462.50 | Jul 31, 2020 |
| X1800026 | STONE OUTCROPPING | EACH | 2 | $739.21 | Jul 31, 2026 |
| X1900008 | SEEDING WET PRAIRIE | ACRE | 2 | $4,384.62 | Jun 15, 2018 |
| X1900010 | SEEDING, CL 5C SPL | ACRE | 2 | $2,862.19 | Jun 16, 2023 |
| X2000003 | SOIL AMENDMENTS | ACRE | 2 | $2,172.64 | Jun 12, 2026 |
| X2020105 | GRADING & SHAP BIKWAY | UNIT | 2 | $444.61 | Jun 12, 2020 |
| X2020205 | ROCK EXCAVATION SPL | CU YD | 2 | $75.00 | Mar 8, 2024 |
| X2020501 | EARTH EX UNSUIT MATL | CU YD | 2 | $23.84 | Jan 17, 2025 |
| X2021200 | REM & DISP UNS MATL SPL | CU YD | 2 | $90.95 | Mar 7, 2025 |
| X2090213 | FURN & PLCE SAND FILL | CU YD | 2 | $0.3497 | Jun 13, 2025 |
| X2100003 | SELECTIVE CLEARING EXP | UNIT | 2 | $650.00 | Jun 12, 2020 |
| X2111218 | PLNTG SOIL MIX F&P 18 | SQ YD | 2 | $29.43 | Jan 16, 2026 |
| X2111224 | PLNTG SOIL MIX F&P 24 | SQ YD | 2 | $43.95 | Aug 2, 2024 |
| X2111230 | PLNTG SOIL MIX F&P 30 | SQ YD | 2 | $97.34 | Apr 25, 2025 |
| X2200004 | CH LNK FNCE, 6' SP | FOOT | 2 | $36.35 | Jan 21, 2022 |
| X2200005 | DELINEATOR (SPECIAL) | EACH | 2 | $199.12 | Jan 17, 2025 |
| X2200010 | O FNC, 3' SP | FOOT | 2 | $172.18 | Nov 6, 2020 |
| X2200024 | MOD ORNAM CLADDING | FOOT | 2 | $1,681.28 | Apr 24, 2020 |
| X2200028 | SP CONC MISC ASTH TRT | L SUM | 2 | $27,600.00 | Jun 16, 2023 |
| X2300025 | SWING GATE, NEW | EACH | 2 | $99,895.50 | Jul 31, 2026 |
| X2300048 | RESTRG BARRIER REMVL | EACH | 2 | $751.16 | Apr 24, 2026 |
| X2300054 | REVLAC CTRL SYS TSTNG | L SUM | 2 | $15,461.55 | Aug 2, 2024 |
| X2500003 | PWDR C OF B F RLNG | L SUM | 2 | $13,850.00 | Sep 18, 2020 |
| X2500500 | INTERSEED CL 4 SPL | ACRE | 2 | $1,141.30 | Jun 11, 2021 |
| X2501821 | SEED CL 5B MOD | ACRE | 2 | $4,220.84 | Sep 19, 2025 |
| X2501845 | SEEDING CL 7 SPL | ACRE | 2 | $2,821.00 | Aug 1, 2025 |
| X2511640 | EROS CONT BLANKET MOD | SQ YD | 2 | $1.75 | Jan 20, 2023 |
| X2600025 | TEMP WDPLE 90 CL 4 | EACH | 2 | $4,854.06 | Nov 6, 2020 |
| X2600029 | OVHD SIN STR TRICH TRI I S | FOOT | 2 | $1,334.95 | Jan 21, 2022 |
| X2600050 | PROF PRESCRIBED BURN | ACRE | 2 | $2,012.93 | Aug 1, 2025 |
| X2700016 | GRV THPL PM LTR & SYM | SQ FT | 2 | $5.87 | Apr 23, 2021 |
| X2700017 | GRV THPL PM L 4 | FOOT | 2 | $1.16 | Apr 23, 2021 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.