| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| XX009267 | PERVIOUS HMA | TON | 3 | $116.63 | Jul 31, 2026 |
| XX009279 | PRECONST VIDEO TAPING | L SUM | 3 | $1,900.00 | Apr 24, 2026 |
| XX009304 | LUM LED HM MED WATT | EACH | 3 | $1,102.20 | Jan 19, 2024 |
| XX009314 | GEOTEXTILE FABRIC | SQ YD | 3 | $3.22 | Apr 24, 2026 |
| XX009361 | MULCH SPECIAL | SQ YD | 3 | $36.58 | Aug 4, 2023 |
| XX009395 | BRICK PAVER PERMEABLE | SQ FT | 3 | $7.17 | Apr 24, 2026 |
| XX009434 | BIOSWALE | SQ YD | 3 | $137.12 | Apr 24, 2026 |
| XX009460 | SUNSHELTER | EACH | 3 | $22,406.91 | Jan 17, 2025 |
| XX009514 | PIPE CULVERTS SPECIAL | FOOT | 3 | $757.95 | Jun 12, 2026 |
| XX009516 | SPRINKLER SYSTEM REP | EACH | 3 | $202.21 | Mar 8, 2024 |
| XX009536 | GAS MARKER POST REM | EACH | 3 | $327.50 | Aug 1, 2025 |
| XX009551 | LUM LED RDWY | EACH | 3 | $1,016.99 | Aug 1, 2025 |
| XX009569 | PRESS BRK STL TUB GIR | SQ FT | 3 | $114.19 | Feb 27, 2026 |
| XX009570 | CONT TREE SOIL SYS | SQ FT | 3 | $79.16 | Apr 24, 2026 |
| XX009600 | FILL VALVE VLTS | EACH | 3 | $726.61 | Jan 16, 2026 |
| XX024100 | EXPOSED AGG SURF | SQ FT | 3 | $14.52 | Nov 7, 2025 |
| XX197300 | SLOTTED DRAIN | FOOT | 3 | $180.92 | Nov 5, 2021 |
| XZ004531 | FOUNTAIN REMOVAL | L SUM | 3 | $7,253.33 | Jun 12, 2026 |
| XZ043900 | PREF JOINT FILLER REM | FOOT | 3 | $2.99 | Jun 14, 2024 |
| XZ177600 | REM EX BUMPER BLOCKS | EACH | 3 | $73.29 | Mar 8, 2024 |
| XZ193505 | VERTICAL CL GAUGE | EACH | 3 | $25,666.67 | Feb 27, 2026 |
| Z0000300 | ADJ ROCKER & SOLE PLT | EACH | 3 | $4,096.71 | Apr 28, 2023 |
| Z0001202 | CONC BLOCK REMOVAL | CU YD | 3 | $244.80 | Jan 17, 2025 |
| Z0003617 | REM EXIST SUB-STR | EACH | 3 | $13,700.00 | Mar 7, 2025 |
| Z0005872 | BOND PREF JT SEAL 2 | FOOT | 3 | $67.74 | Jun 12, 2020 |
| Z0007115 | C&D LEAD PT CL RS N14 | L SUM | 3 | $13,273.05 | Apr 24, 2026 |
| Z0007420 | SIDEWALK REPAIR SPL | SQ FT | 3 | $37.17 | Apr 24, 2020 |
| Z0007616 | BLDG REMOV NO 16 | L SUM | 3 | $15,106.58 | Feb 27, 2026 |
| Z0008761 | EXPEDITED CALL OUT WORK | EACH | 3 | $1,335.06 | Jun 17, 2022 |
| Z0010515 | CLEAN & PT STL BR N15 | L SUM | 3 | $113,666.67 | Jan 17, 2025 |
| Z0010516 | CLEAN & PT STL BR N16 | L SUM | 3 | $95,304.00 | Jan 17, 2025 |
| Z0012150 | BR DECK SCAR 3 1/4 | SQ YD | 3 | $73.54 | Mar 7, 2025 |
| Z0012152 | BR DECK SCAR 3 1/2 | SQ YD | 3 | $39.78 | Mar 11, 2022 |
| Z0012170 | BR DK MIC C OVL 3 1/4 | SQ YD | 3 | $115.65 | Apr 26, 2024 |
| Z0017300 | DOWEL REPAIR | EACH | 3 | $177.07 | Mar 7, 2025 |
| Z0018940 | DRILL EX MAN/HANDHOLE | EACH | 3 | $221.68 | Jan 16, 2026 |
| Z0023203 | SED CONT DR ST INL FR | EACH | 3 | $180.76 | Apr 24, 2026 |
| Z0023800 | FILL EX SEPTIC TANK | EACH | 3 | $1,799.59 | Jun 16, 2023 |
| Z0024477 | TUBULAR MARKER MAINT | EACH | 3 | $61.11 | Jan 19, 2024 |
| Z0026408 | TEMP SHT PILING SPL | SQ FT | 3 | $35.49 | Jun 17, 2022 |
| Z0029660 | FURN & DRIVE METAL SOCKET W/ POST | EACH | 3 | $261.75 | Jun 11, 2021 |
| Z0032900 | LAND SECTION MARKERS | EACH | 3 | $2,480.95 | Apr 24, 2026 |
| Z0033004 | LED SF RETRO GRN BALL | EACH | 3 | $124.58 | Sep 23, 2022 |
| Z0033008 | LED SF RETRO YEL BALL | EACH | 3 | $126.18 | Sep 23, 2022 |
| Z0033012 | LED SF RETRO GRN AROW | EACH | 3 | $133.84 | Sep 23, 2022 |
| Z0033039 | DISCON/RECON ELEC SER | EACH | 3 | $1,647.04 | Jun 14, 2024 |
| Z0033070 | VIDEO VEH DET 4 CAM | EACH | 3 | $30,382.44 | Apr 26, 2024 |
| Z0036900 | PARK METERS REMOVED | EACH | 3 | $230.31 | Jan 21, 2022 |
| Z0037100 | PAVT FABRIC EPOXY CTD | SQ YD | 3 | $20.16 | Apr 24, 2026 |
| Z0038120 | PCC SUR REM 1 3/4 | SQ YD | 3 | $18.47 | Jun 11, 2021 |
| Z0038122 | PCC SUR REM 2 1/4 | SQ YD | 3 | $10.92 | Jan 17, 2020 |
| Z0039700 | PICNIC TABLE | EACH | 3 | $2,444.40 | Apr 29, 2022 |
| Z0045000 | PRESS CONNECT 12X6 | EACH | 3 | $3,953.85 | Apr 26, 2019 |
| Z0048400 | RAILROAD CROSSING REM | EACH | 3 | $11,811.89 | Jan 17, 2025 |
| Z0049805 | R&D FRIABL ASB BLD 5 | L SUM | 3 | $2,250.00 | Nov 7, 2025 |
| Z0049808 | R&D FRIABL ASB BLD 8 | L SUM | 3 | $7,203.72 | Mar 7, 2025 |
| Z0049914 | R&D NON-FR ASB BLD 14 | L SUM | 3 | $6,028.67 | Jun 12, 2026 |
| Z0053100 | REPAIR TR BAR TERM 5A | EACH | 3 | $220.00 | Mar 6, 2020 |
| Z0055900 | RUSTIC WD P & RL FENC | FOOT | 3 | $58.83 | Mar 8, 2024 |
| Z0056600 | SANDBLASTING CONCRETE | SQ YD | 3 | $22.95 | Apr 23, 2021 |
| Z0056628 | STORM SEW WM REQ 54 | FOOT | 3 | $421.50 | Aug 2, 2024 |
| Z0056630 | STORM SEW WM REQ 60 | FOOT | 3 | $706.41 | Apr 25, 2025 |
| Z0056682 | SS 2 WAT MN 42 | FOOT | 3 | $531.74 | Jan 16, 2026 |
| Z0057900 | SAN SEW 36 | FOOT | 3 | $342.21 | Mar 10, 2023 |
| Z0064562 | SEG BLK RET WALL REP | SQ FT | 3 | $53.49 | Jan 15, 2021 |
| Z0065752 | SLOT DR 12" W/6" SLOT | FOOT | 3 | $147.39 | Jan 20, 2023 |
| Z0065780 | SLOT DR 30" W/VAR SL | FOOT | 3 | $626.21 | Jun 12, 2026 |
| Z0066400 | STAB DRIVEWAYS 6 | SQ YD | 3 | $62.41 | Jan 18, 2019 |
| Z0067200 | STEEL CASINGS 10 | FOOT | 3 | $242.26 | Jul 31, 2026 |
| Z0067400 | STEEL CASINGS 14 | FOOT | 3 | $109.58 | Jun 13, 2025 |
| Z0068410 | STEEL CASINGS 48 | FOOT | 3 | $1,165.00 | Nov 8, 2024 |
| Z0073350 | TEMP SLAB SUPPORT SYS | EACH | 3 | $9,730.77 | Nov 17, 2023 |
| Z0073430 | TEMP SUPPORT SYS L3 | EACH | 3 | $684,527.25 | Jul 31, 2026 |
| 21101601 | TOPSOIL F & P 1 | SQ YD | 2 | $3.47 | Apr 24, 2026 |
| 21101635 | TOPSOIL F & P 9 | SQ YD | 2 | $30.48 | Sep 20, 2024 |
| 21101800 | COMPOST F & P 1 | SQ YD | 2 | $3.61 | Aug 2, 2024 |
| 21101810 | COMPOST F & P 3 | SQ YD | 2 | $7.61 | Jun 12, 2020 |
| 25000340 | SEEDING CL 6A | ACRE | 2 | $1,385.82 | Sep 19, 2025 |
| 25003200 | INTERSEED CL 2 | ACRE | 2 | $1,811.50 | Jan 21, 2022 |
| 25003300 | INTERSEED CL 3 | ACRE | 2 | $2,326.92 | Nov 9, 2018 |
| 25003322 | INTERSEED CL 5A | ACRE | 2 | $2,454.26 | Feb 27, 2026 |
| 25400200 | SELECT MOWING STAKES | EACH | 2 | $37.25 | Nov 17, 2023 |
| 28100129 | STONE RIPRAP CL B5 | SQ YD | 2 | $217.67 | Jun 14, 2024 |
| 28100211 | STONE RIPRAP CL A6 | TON | 2 | $65.06 | Mar 10, 2023 |
| 28100229 | STONE RIPRAP CL B5 | TON | 2 | $99.90 | Apr 24, 2026 |
| 28400400 | SLOPE MATTRESS 6 | SQ YD | 2 | $104.58 | Nov 5, 2021 |
| 30200750 | PROCESS MOD SOIL 14 | SQ YD | 2 | $7.35 | Jun 14, 2024 |
| 30300115 | AGG SUBGRADE IMPR 15 | SQ YD | 2 | $18.39 | Aug 5, 2022 |
| 30300136 | AGG SUBGRADE IMPR 36 | SQ YD | 2 | $35.37 | Jun 13, 2025 |
| 31101300 | SUB GRAN MAT B 5 | SQ YD | 2 | $30.90 | Jun 13, 2025 |
| 35100110 | AGG BASE CSE A | CU YD | 2 | $68.93 | Jun 13, 2025 |
| 35101000 | AGG BASE CSE A 11 | SQ YD | 2 | $49.05 | Jan 19, 2024 |
| 35101350 | AGG BASE CSE A 15 | SQ YD | 2 | $19.94 | Jun 15, 2018 |
| 35300315 | PCC BSE CSE 8 3/4 | SQ YD | 2 | $73.03 | Jun 17, 2022 |
| 35300405 | PCC BSE CSE 9 1/4 | SQ YD | 2 | $77.11 | Apr 26, 2024 |
| 35300515 | PCC BSE CSE 10 3/4 | SQ YD | 2 | $78.36 | Apr 24, 2026 |
| 35300715 | PCC BSE CSE 12 3/4 | SQ YD | 2 | $214.14 | Aug 4, 2023 |
| 35301100 | HES PCC BSE CSE 8 | SQ YD | 2 | $72.64 | Jun 13, 2025 |
| 35301200 | HES PCC BSE CSE 9 | SQ YD | 2 | $67.28 | Mar 11, 2022 |
| 35400325 | PCC BASE CSE W 8 1/4 | SQ YD | 2 | $81.04 | Jan 16, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.