| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X0320374 | PLUG EX SAN SEWERS | EACH | 3 | $1,758.26 | Nov 18, 2022 |
| X0320582 | BARRICADES, TYPE I | EACH | 3 | $10.00 | Nov 5, 2021 |
| X0321156 | HIGH VIS TEMP FENCE | FOOT | 3 | $7.23 | Mar 10, 2023 |
| X0321519 | CONDUIT SUPPORT SYS | L SUM | 3 | $108,821.39 | Apr 24, 2026 |
| X0322263 | CULVERT DROP BOX | EACH | 3 | $7,103.05 | Jun 15, 2018 |
| X0322276 | CLN & PT EXP RE-BAR | L SUM | 3 | $16,216.67 | Jul 30, 2021 |
| X0322283 | VIDEO SURV SYS COMP | EACH | 3 | $13,382.64 | Apr 26, 2024 |
| X0322352 | SEEDING MOBILIZATION | EACH | 3 | $1,275.00 | Jan 15, 2021 |
| X0322441 | DIG LOOP DET SEN U 4C | EACH | 3 | $511.55 | Nov 9, 2018 |
| X0322444 | TONE EQ POWER SUPPLY | EACH | 3 | $1,206.78 | Jun 12, 2020 |
| X0322464 | ABAN FILL EX SAN MAN | EACH | 3 | $961.43 | Nov 18, 2022 |
| X0322720 | CAST IRON STEPS | EACH | 3 | $289.22 | Nov 17, 2023 |
| X0322785 | PRE CONST CLN TV | FOOT | 3 | $26.87 | Jul 31, 2026 |
| X0322791 | FILL EXIST SAN SEWER | CU YD | 3 | $786.25 | Jun 16, 2023 |
| X0322955 | WEED CONT SEL WD P/BL | GALLON | 3 | $239.78 | Apr 23, 2021 |
| X0322986 | MICROWAVE DET UNIT | EACH | 3 | $9,714.15 | Jun 11, 2021 |
| X0323002 | TEMP ELECT SERV CONN | EACH | 3 | $6,493.67 | Mar 10, 2023 |
| X0323553 | ORN FENCE WRT IRON | FOOT | 3 | $172.42 | Jun 12, 2020 |
| X0323578 | PRECON VISUAL RECORDG | L SUM | 3 | $11,333.33 | Feb 27, 2026 |
| X0323859 | DOWNSPOUT CONNECTION | EACH | 3 | $1,308.18 | Jun 17, 2022 |
| X0323881 | COMP SPARE LF PMP ASM | L SUM | 3 | $68,359.67 | Nov 8, 2024 |
| X0324050 | BOLLARD, LED | EACH | 3 | $3,831.25 | Jan 17, 2025 |
| X0324060 | WEED CNTRL TOTAL VEGN MS | GALLON | 3 | $2,040.86 | Apr 24, 2026 |
| X0324390 | FLOOD LIGHTING UNIT | EACH | 3 | $1,544.70 | Apr 29, 2022 |
| X0324412 | CONC FDN 24 AR 15 BC | FOOT | 3 | $556.93 | Jun 12, 2026 |
| X0324543 | REL EX CONFIRM BEACON | EACH | 3 | $469.67 | Sep 22, 2023 |
| X0324637 | BASE COVER LIGHT POLE | EACH | 3 | $771.02 | Mar 6, 2020 |
| X0324854 | WEED C NATV GR RESTOR | GALLON | 3 | $3,864.16 | Jun 14, 2019 |
| X0324894 | WM MANHOLES ADJ | EACH | 3 | $537.50 | Jan 21, 2022 |
| X0325154 | MASONRY RECONSTRUCT | SQ YD | 3 | $1,157.21 | Apr 24, 2026 |
| X0325276 | ROADWAY SWEEPING | LANE MI | 3 | $215.18 | Jun 16, 2023 |
| X0325290 | CORED DRAIN HOLES | EACH | 3 | $177.30 | Feb 27, 2026 |
| X0325345 | REALIGN EX ATTENUATOR | SQ YD | 3 | $128.19 | Jun 17, 2022 |
| X0325381 | FLD TH SP MT STR S N1 | L SUM | 3 | $398,716.67 | Apr 24, 2026 |
| X0325391 | EXPD POLYSTYRENE FILL | CU YD | 3 | $135.35 | Mar 7, 2025 |
| X0325402 | MODIFY SPRINKLER SYST | L SUM | 3 | $8,930.02 | Apr 26, 2024 |
| X0325446 | SHLD INL W/CURB 4'SHL | EACH | 3 | $6,800.00 | Mar 11, 2022 |
| X0325494 | INTERST DIR CLSR | EACH | 3 | $103,998.32 | Jun 12, 2026 |
| X0325496 | ARCHITECT FORM LINER | SQ YD | 3 | $734.31 | Mar 7, 2025 |
| X0325532 | PVC CON T 2 (S80) | FOOT | 3 | $38.10 | Jun 12, 2026 |
| X0325712 | RELOC EXIST ELEC SYS | L SUM | 3 | $67,315.33 | Nov 8, 2024 |
| X0325788 | PRE-EMERG HERBICIDE | SQ YD | 3 | $0.3511 | Apr 26, 2024 |
| X0326094 | REL EX ITS CONT CAB | EACH | 3 | $5,928.58 | Apr 24, 2020 |
| X0326133 | TEMP WD POLE 45FT CL5 | EACH | 3 | $1,279.96 | Jun 14, 2019 |
| X0326232 | FENDER SYSTEM | L SUM | 3 | $2,158,946.67 | Feb 27, 2026 |
| X0326243 | SED CONT SILT CURTAIN | L SUM | 3 | $6,133.33 | Jun 12, 2020 |
| X0326248 | ATMS SOFTWARE CORE | L SUM | 3 | $137,035.15 | Jun 11, 2021 |
| X0326268 | REINFORC SOIL SLP SYS | SQ FT | 3 | $49.55 | Apr 24, 2026 |
| X0326357 | ROADWAY LIGHT MODIFY | L SUM | 3 | $13,925.00 | Sep 18, 2020 |
| X0326452 | VIDEO SYS DET PROCSSR | EACH | 3 | $8,582.80 | Apr 29, 2022 |
| X0326645 | UP RPU EQ COM RWISS | EACH | 3 | $29,359.80 | Sep 18, 2020 |
| X0326659 | CUR-IN-PL PIPE LNR 18 | FOOT | 3 | $109.68 | Nov 6, 2020 |
| X0326696 | SIGN AND POST | EACH | 3 | $478.27 | Aug 4, 2023 |
| X0326749 | AIR RELEASE VALVE MHL | EACH | 3 | $12,118.79 | Jun 17, 2022 |
| X0326784 | MAIN EX LIGHT CONTR | EACH | 3 | $804.84 | Mar 6, 2020 |
| X0326811 | ABANDON CONDUIT PLACE | EACH | 3 | $100.62 | Aug 2, 2024 |
| X0326955 | REM REL EX ELECT SERV | EACH | 3 | $2,775.00 | Nov 5, 2021 |
| X0327003 | BLOCKWALL RECONSTRUCT | L SUM | 3 | $4,833.33 | Sep 20, 2019 |
| X0327006 | ROADWAY LT POLE IO | EACH | 3 | $2,466.41 | Jan 21, 2022 |
| X0327108 | RELOC FERRY DOCKS | EACH | 3 | $2,547.86 | Jun 11, 2021 |
| X0327131 | DRAIN STRUCTURES N1 | EACH | 3 | $15,199.01 | Jan 21, 2022 |
| X0327308 | PARK LOT SEAL CT | GALLON | 3 | $7.21 | Jun 16, 2023 |
| X0327348 | COMB SEW REM 10 | FOOT | 3 | $49.69 | Jan 15, 2021 |
| X0327369 | SAN SEWER DI 10 | FOOT | 3 | $200.54 | Jun 12, 2026 |
| X0327590 | LOC UNDERGR UTILITIES | L SUM | 3 | $736.35 | Jun 11, 2021 |
| X0327614 | COMB SEW REM 12 | FOOT | 3 | $58.14 | Apr 29, 2022 |
| X0327643 | TS WOOD POLE 40 CL 5 | EACH | 3 | $2,094.95 | Jun 17, 2022 |
| X0327646 | REMOVE GATE POSTS | EACH | 3 | $358.33 | Aug 5, 2022 |
| X0327694 | GATE VALVE 8 VAULT 4 | EACH | 3 | $4,966.33 | Nov 18, 2022 |
| X0327756 | SS CABL PLANT SUP SYS | L SUM | 3 | $149,465.67 | Jun 12, 2020 |
| X0327772 | PRC CON PVT SLAB 10 | SQ FT | 3 | $41.59 | Sep 18, 2020 |
| X0327779 | GAS UTILITY SERV CONN | L SUM | 3 | $6,115.00 | Jan 17, 2025 |
| X0327814 | PLNTG SOIL MIX F&P 24 | SQ YD | 3 | $39.88 | Apr 23, 2021 |
| X0327820 | PLNTG SOIL MIX F&P 30 | SQ YD | 3 | $92.97 | Nov 6, 2020 |
| X0327991 | REM EX PROTEC SHIELD | SQ YD | 3 | $24.22 | Sep 17, 2021 |
| X0328013 | PROT NET | SQ YD | 3 | $44.08 | Aug 2, 2024 |
| X0328032 | BUDG ALLOW NET DES AND INT | L SUM | 3 | $163,333.33 | Feb 27, 2026 |
| X0328034 | AS-BUILT DRAWINGS | L SUM | 3 | $3,683.33 | Jun 12, 2026 |
| X0328036 | WASH DEC LT SYSTEM | L SUM | 3 | $15,000.00 | Feb 27, 2026 |
| X0328502 | CCTV CAM STR GS 50 MH | EACH | 3 | $19,702.65 | Aug 2, 2024 |
| X0370069 | COMB SEW ESVCP 8 CDOT | FOOT | 3 | $197.79 | Jun 12, 2026 |
| X0370080 | COMB C&G B V.12(CDOT) | FOOT | 3 | $43.28 | Jun 12, 2020 |
| X0900027 | PROT SHLD PERM REM | SQ FT | 3 | $3.69 | Apr 23, 2021 |
| X0900033 | BRIDGE BALANCING | L SUM | 3 | $168,666.67 | Jun 14, 2024 |
| X0900037 | CLMN TENSIOND STRANDS | EACH | 3 | $852.64 | Nov 18, 2022 |
| X0900047 | PREF JOINT SEAL 3" | FOOT | 3 | $111.08 | Jun 15, 2018 |
| X0900052 | PREF JOINT SEAL 1 1/2 | FOOT | 3 | $93.30 | Nov 5, 2021 |
| X0900080 | TEMPORARY BOARDWALK | SQ FT | 3 | $22.73 | Nov 17, 2023 |
| X0900081 | TEMPORARY PED RAILING | FOOT | 3 | $40.62 | Jul 31, 2020 |
| X0900083 | PERM ST SHT PILE SPL | SQ FT | 3 | $38.92 | Jun 11, 2021 |
| X0900085 | REM EX JOINT | FOOT | 3 | $24.72 | Mar 5, 2021 |
| X0900086 | PREC PUMP STA BLDNG | L SUM | 3 | $988,450.33 | Aug 1, 2025 |
| X0900091 | PILE REMOVAL SPECIAL | FOOT | 3 | $22.65 | Jun 12, 2020 |
| X0900092 | REPAIR BRIDGE RAIL | FOOT | 3 | $185.42 | Jun 17, 2022 |
| X1200001 | DRAINAGE WEIR | EACH | 3 | $14,800.00 | Apr 24, 2026 |
| X1200018 | D I WM 6 RJ | FOOT | 3 | $157.99 | Mar 8, 2024 |
| X1200023 | CB A 5'D DUPG SAG F&G | EACH | 3 | $5,615.00 | Jan 16, 2026 |
| X1200024 | INTERIM T1 FRM & GRT | EACH | 3 | $447.32 | Sep 23, 2022 |
| X1200045 | TEMP STORM SEWER 15 | FOOT | 3 | $84.99 | Mar 10, 2023 |
| X1200061 | CLAY LINER | CU YD | 3 | $35.96 | Apr 25, 2025 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.