| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X8362247 | CON F 24 1 1/4A 15B 7 | EACH | 6 | $3,701.46 | Jan 16, 2026 |
| X8440128 | REM EX LIGHTING SYSTM | L SUM | 6 | $41,270.85 | Jan 16, 2026 |
| X8510200 | PAINT TRAF SIG EQUIP | L SUM | 6 | $26,401.21 | Mar 8, 2024 |
| X8570015 | CONTROLLER (SPECIAL) | EACH | 6 | $14,169.13 | Nov 7, 2025 |
| X8710101 | ETHERNET MNG SWITCH | EACH | 6 | $8,104.60 | Apr 24, 2026 |
| X8760002 | APS EXT BRACKET | EACH | 6 | $430.98 | Jan 16, 2026 |
| X8770136 | S C MAA&P 36 SPL | EACH | 6 | $27,871.17 | Sep 20, 2024 |
| X8770154 | S C MAA&P 54 SPL | EACH | 6 | $33,753.82 | Apr 25, 2025 |
| X8800081 | SH LED 4F 1S SWM | EACH | 6 | $1,775.56 | Jun 14, 2024 |
| X8950060 | REM EX CONTROLLER | EACH | 6 | $296.90 | Apr 24, 2026 |
| X8950115 | RELOC LIGHT DET | EACH | 6 | $552.00 | Jul 31, 2026 |
| X8950508 | REMV CBL FROM CONDUIT | FOOT | 6 | $2.23 | Jul 31, 2026 |
| XP000017 | SERVICE TRUCK BUCKET | HOUR | 6 | $33.48 | Sep 23, 2022 |
| XP000019 | PERCENT MARK-UP VALUE | L SUM | 6 | $64,665.67 | Sep 23, 2022 |
| XP000183 | BACKPLATE ABS PLAS 3S | EACH | 6 | $0.0100 | Jun 17, 2022 |
| XP000184 | BACKPLATE ABS PLAS 4S | EACH | 6 | $0.0100 | Jun 17, 2022 |
| XP000185 | BACKPLATE ABS PLAS 5S | EACH | 6 | $0.0100 | Jun 17, 2022 |
| XP000201 | CONTROLLER, SIGNAL | EACH | 6 | $1,158.34 | Jun 17, 2022 |
| XP000212 | CCTV DOME CAMERA HD | EACH | 6 | $10,198.54 | Jun 12, 2026 |
| XX000503 | SPLIT RAIL FENCE | FOOT | 6 | $40.32 | Jan 16, 2026 |
| XX000836 | PRES TEST & DISINFECT | L SUM | 6 | $7,740.00 | Nov 8, 2024 |
| XX000856 | MAILBOX REM & RELOC | EACH | 6 | $469.45 | Jun 13, 2025 |
| XX003219 | UNIT PAVERS | SQ FT | 6 | $22.35 | Jun 13, 2025 |
| XX003516 | CONN EX W MN NP 8 | EACH | 6 | $3,482.67 | Apr 24, 2026 |
| XX003517 | CONN EX W MN NP 6 | EACH | 6 | $3,011.62 | Apr 24, 2026 |
| XX005106 | PVC CASING PIPE 18 | FOOT | 6 | $267.62 | Aug 1, 2025 |
| XX005206 | EXPLOR EXCAVATION | FOOT | 6 | $34.91 | Jul 31, 2026 |
| XX005569 | MAILBX REM & REINSTL | EACH | 6 | $635.99 | Jan 16, 2026 |
| XX006655 | LYR II DATALINK SWTCH | EACH | 6 | $5,742.32 | Nov 5, 2021 |
| XX006729 | PERIM EROS BAR ROL EX | FOOT | 6 | $4.27 | Mar 5, 2021 |
| XX006826 | R&REL LAWN SPRINK SYS | FOOT | 6 | $19.31 | Jan 17, 2025 |
| XX006985 | SHOULDER EXCAVATION | CU YD | 6 | $47.20 | Mar 7, 2025 |
| XX007061 | OUTFALL STRUCTURE | EACH | 6 | $4,372.73 | Sep 18, 2026 |
| XX007079 | CONCRETE RIBBON | FOOT | 6 | $35.75 | Jan 16, 2026 |
| XX007606 | LIMESTONE SCRN SURF 2 | SQ YD | 6 | $4.83 | Nov 7, 2025 |
| XX007852 | PED BENCH FUR & INST | EACH | 6 | $2,977.54 | Jan 16, 2026 |
| XX009301 | FIELD TILE ADJUST | FOOT | 6 | $43.26 | Jun 14, 2024 |
| XX009453 | STORM SEW CL B 1 8 | FOOT | 6 | $122.75 | Nov 7, 2025 |
| Z0001901 | JACK & REPOS BEARINGS | EACH | 6 | $3,909.03 | Mar 7, 2025 |
| Z0002400 | BALLAST | TON | 6 | $69.97 | Apr 24, 2026 |
| Z0002700 | BARRICADES | EACH | 6 | $13.11 | Jun 16, 2023 |
| Z0002750 | BARRICADES TYPE 3 | EACH | 6 | $97.08 | Aug 4, 2023 |
| Z0004560 | BRIDGE WEAR SURF REM | SQ YD | 6 | $39.40 | Aug 4, 2023 |
| Z0004910 | HMA F PATCH (H M) | TON | 6 | $527.55 | Jun 14, 2024 |
| Z0005600 | BREAKING PAVED DITCH | FOOT | 6 | $3.73 | Jun 16, 2023 |
| Z0006021 | BR DK LTX C OLY 3 1/4 | SQ YD | 6 | $161.82 | Mar 7, 2025 |
| Z0007123 | C&D LEAD PT CL RS N12 | L SUM | 6 | $27,887.93 | Apr 24, 2026 |
| Z0009700 | CH LK FABRIC SPL 6-0 | FOOT | 6 | $22.03 | Mar 8, 2024 |
| Z0010300 | CH LK FABRIC T3 SPL | FOOT | 6 | $18.99 | Apr 26, 2024 |
| Z0010514 | CLEAN & PT STL BR N14 | L SUM | 6 | $116,517.42 | Apr 24, 2026 |
| Z0012136 | BR DECK SCAR 1 1/2 | SQ YD | 6 | $60.79 | Apr 26, 2024 |
| Z0017800 | DR UTIL STR RECON SPL | EACH | 6 | $1,446.40 | Apr 29, 2022 |
| Z0018501 | DRA STR CLEANED SP | EACH | 6 | $829.81 | Feb 27, 2026 |
| Z0021903 | SILICONE JT SEAL 3/4 | FOOT | 6 | $75.66 | Jun 12, 2026 |
| Z0021920 | SILICONE JT SEALER SP | FOOT | 6 | $108.65 | Jul 31, 2026 |
| Z0026400 | FUR PLAC SAND FILL | CU YD | 6 | $37.55 | Sep 22, 2023 |
| Z0029656 | REP TB TERM T3 SPL | EACH | 6 | $2,299.46 | Sep 22, 2023 |
| Z0031200 | JACKING & CRIBBING | EACH | 6 | $12,938.43 | Jun 14, 2024 |
| Z0033058 | P MT FL BEAC INS SPL | EACH | 6 | $6,928.85 | Apr 24, 2026 |
| Z0033062 | RADIO TRANSCEIVER | EACH | 6 | $3,839.51 | Jun 13, 2025 |
| Z0038116 | PCC SUR REM 3/4 | SQ YD | 6 | $7.05 | Sep 22, 2023 |
| Z0038117 | PCC SUR REM 1 | SQ YD | 6 | $6.38 | Jun 14, 2024 |
| Z0049792 | RELO SADDLE SHIM BLCK | EACH | 6 | $1,875.00 | Jan 17, 2025 |
| Z0049907 | R&D NON-FR ASB BLD 7 | L SUM | 6 | $6,133.34 | Jun 12, 2026 |
| Z0049913 | R&D NON-FR ASB BLD 13 | L SUM | 6 | $4,637.73 | Jun 12, 2026 |
| Z0050100 | REM RE-ERECT EX HDRL | FOOT | 6 | $102.97 | Sep 20, 2024 |
| Z0052394 | REPL U-BOLT | EACH | 6 | $632.93 | Jan 17, 2025 |
| Z0052550 | REPAIR TR BAR TERM 1B | EACH | 6 | $194.70 | Sep 22, 2023 |
| Z0052700 | REPAIR TR BAR TERM T3 | EACH | 6 | $193.33 | Jan 19, 2024 |
| Z0054408 | ROCK FILL - SUBGRADE | CU YD | 6 | $56.20 | Jan 19, 2024 |
| Z0056631 | SS WM REQ EQRS 24 | FOOT | 6 | $276.10 | Sep 19, 2025 |
| Z0056653 | SS 1 WAT MN 21 | FOOT | 6 | $170.82 | Apr 25, 2025 |
| Z0056657 | SS 1 WAT MN 36 | FOOT | 6 | $301.16 | Jan 16, 2026 |
| Z0064540 | SEEPAGE COLLAR | EACH | 6 | $1,126.80 | Sep 22, 2023 |
| Z0065704 | BIT CT AG SLOPEWALL 6 | SQ YD | 6 | $40.82 | Nov 6, 2020 |
| Z0070150 | REM RELOC EX MONUMENT | EACH | 6 | $4,126.56 | Sep 19, 2025 |
| Z0073346 | SLEEPER SLAB | SQ YD | 6 | $107.70 | Jan 16, 2026 |
| 28100113 | STONE RIPRAP CL A7 | SQ YD | 5 | $166.80 | Apr 25, 2025 |
| 30300130 | AGG SUBGRADE IMPR 30 | SQ YD | 5 | $33.89 | Jun 12, 2026 |
| 31001500 | LIME | TON | 5 | $40.70 | Jun 13, 2025 |
| 31101500 | SUB GRAN MAT B 7 | SQ YD | 5 | $13.84 | Nov 8, 2024 |
| 35200300 | PROC SOIL-CEM BC 8 | SQ YD | 5 | $4.56 | Jun 14, 2024 |
| 35400450 | PCC BASE CSE W 9.5 | SQ YD | 5 | $104.55 | Nov 7, 2025 |
| 35400510 | PCC BASE CSE W 11 | SQ YD | 5 | $146.16 | Jun 12, 2026 |
| 35501325 | HMA BASE CSE 10 1/4 | SQ YD | 5 | $112.23 | Nov 8, 2024 |
| 35600713 | HMA BC WID 9 1/4 | SQ YD | 5 | $62.75 | Mar 8, 2024 |
| 35600715 | HMA BC WID 9 3/4 | SQ YD | 5 | $57.50 | Feb 27, 2026 |
| 35600717 | HMA BC WID 10 1/4 | SQ YD | 5 | $62.50 | Jan 17, 2025 |
| 35600719 | HMA BC WID 10 3/4 | SQ YD | 5 | $84.63 | Apr 24, 2026 |
| 40600825 | P LEV BIND MM N50 | TON | 5 | $119.24 | Jun 14, 2019 |
| 40600829 | P LB MM IL-9.5FG N50 | TON | 5 | $83.92 | Jul 12, 2019 |
| 40603390 | HMA SC "F" N70 | TON | 5 | $72.93 | Jan 17, 2020 |
| 40603510 | P HMA SC "C" N50 | TON | 5 | $85.08 | Jun 14, 2019 |
| 40604072 | HMA SC IL-9.5 E N70 | TON | 5 | $148.87 | Jun 12, 2026 |
| 40701816 | HMA PAVT FD 6 3/4 | SQ YD | 5 | $46.97 | Jan 16, 2026 |
| 40701826 | HMA PAVT FD 7 1/4 | SQ YD | 5 | $33.23 | Jun 12, 2026 |
| 40701891 | HMA PAVT FD 10 1/2 | SQ YD | 5 | $62.67 | Sep 19, 2025 |
| 42000541 | PCC PVT 12 JOINTED | SQ YD | 5 | $82.40 | Sep 19, 2025 |
| 42000900 | HES PCC PVT 8 | SQ YD | 5 | $63.55 | Jun 13, 2025 |
| 42100350 | CONT R PCC PVT 12 1/2 | SQ YD | 5 | $76.36 | Aug 1, 2025 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.