| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| 78006150 | PREF THPL PM LINE 12 | FOOT | 8 | $20.09 | Jan 16, 2026 |
| 78011095 | GRV RCSD PVT MRKG 19 | FOOT | 8 | $13.74 | Jun 12, 2026 |
| 81100220 | CON AT ST 3/4 PVC GS | FOOT | 8 | $75.02 | Feb 27, 2026 |
| 81603020 | UD 3#10#10GXLPUSE 3/4 | FOOT | 8 | $7.18 | Aug 2, 2024 |
| 81603030 | UD 2#4 #6G XLPUSE 1 | FOOT | 8 | $12.08 | Jul 31, 2026 |
| 81603034 | UD 2#6 #6G XLPUSE 3/4 | FOOT | 8 | $23.30 | Jan 16, 2026 |
| 81702145 | EC C XLP USE 1C 3 | FOOT | 8 | $3.40 | Apr 26, 2024 |
| 83001600 | LT P A 35MH 15DA | EACH | 8 | $4,108.61 | Jun 12, 2026 |
| 83007500 | LT P A 35MH 12MA | EACH | 8 | $3,079.19 | Apr 24, 2026 |
| 83050825 | LT P A 47.5MH 15DA | EACH | 8 | $4,386.84 | Apr 26, 2024 |
| 83700350 | LT TOWER FDN 54D | FOOT | 8 | $1,216.77 | Apr 26, 2024 |
| 87301265 | ELCBL C SIGNAL 14 9C | FOOT | 8 | $3.08 | Jun 12, 2026 |
| 87301790 | ELCBL C SERV 2 2C | FOOT | 8 | $8.35 | Jan 16, 2026 |
| 87702820 | STL COMB MAA&P 18 | EACH | 8 | $17,523.75 | Nov 7, 2025 |
| 88200310 | TS BACKPLATE LOU PLAS | EACH | 8 | $234.37 | Aug 1, 2025 |
| 88200400 | TS BACKPLATE F PLAST | EACH | 8 | $168.81 | Jan 16, 2026 |
| 88700090 | CONFIRMATION BEACON | EACH | 8 | $1,490.46 | Sep 22, 2023 |
| 89502215 | MOD EX CONTR FDN | EACH | 8 | $3,389.61 | Jun 13, 2025 |
| A2000316 | T-ACER MIY MOR 2 | EACH | 8 | $643.19 | Jul 31, 2026 |
| A2001020 | T-ACER RUBRM 2-1/2 | EACH | 8 | $543.20 | Nov 8, 2024 |
| A2002714 | T-CARYA OVATA 1-3/4 | EACH | 8 | $485.12 | Nov 7, 2025 |
| A2008120 | T-TILIA CORD GS 2-1/2 | EACH | 8 | $583.57 | Jun 12, 2026 |
| AR108960 | REMOVE CABLE | L.F. | 8 | $0.5438 | Jan 21, 2022 |
| AR109210 | VAULT MODIFICATIONS | L.S. | 8 | $57,802.34 | Jan 21, 2022 |
| AR110012 | 2" DIRECTIONAL BORE | L.F. | 8 | $23.52 | Aug 5, 2022 |
| AR125446 | TAXI GUIDANCE SIGN, 6 CHARACTER | EACH | 8 | $9,593.42 | Aug 5, 2022 |
| AR209604 | CRUSHED AGG. BASE COURSE - 4" | SQ YD | 8 | $9.59 | Jan 21, 2022 |
| AR608510 | EXISTING ASPHALT SURFACE TREATMENT | SQ YD | 8 | $1.60 | Apr 29, 2022 |
| AR751412 | INLET-TYPE B | EACH | 8 | $2,235.88 | Nov 6, 2020 |
| AR752412 | PRECAST REINFORCED CONC. FES 12" | EACH | 8 | $1,177.99 | Nov 6, 2020 |
| AR752900 | REMOVE END SECTION | EACH | 8 | $329.91 | Nov 6, 2020 |
| AS602510 | BITUMINOUS PRIME COAT | GAL. | 8 | $4.51 | Aug 5, 2022 |
| AS620520 | PAVEMENT MARKING-WATERBORNE | SQ FT | 8 | $1.67 | Aug 5, 2022 |
| B2000666 | T-AMELAN X GF SF 6' | EACH | 8 | $399.03 | Jun 12, 2026 |
| B2000767 | T-AMEL X GF AB CF 8' | EACH | 8 | $600.39 | Jul 31, 2026 |
| B2001666 | T-CRATAE CRU-I SF 6' | EACH | 8 | $516.72 | Jun 12, 2026 |
| B2004120 | T-MALUS PF TF 2-1/2 | EACH | 8 | $529.61 | Jul 31, 2026 |
| B2005385 | T-METASEQ GLYPTO 2 | EACH | 8 | $480.91 | Apr 24, 2026 |
| B2006016 | T-SYRING PEK TF 2 | EACH | 8 | $601.61 | Jun 12, 2026 |
| C20058G5 | S-RHUS AROMA GL 5G | EACH | 8 | $75.14 | Apr 25, 2025 |
| C2C03424 | S-HYDRA ARBOR AN 2'C | EACH | 8 | $52.33 | Jun 14, 2024 |
| C2C043G5 | S-LIND BENZOIN 5G | EACH | 8 | $98.06 | Jun 12, 2026 |
| D2001988 | E-PICEA GLAU DEN 8' | EACH | 8 | $667.02 | Jun 12, 2026 |
| E20220G1 | V-PARTHEN TRICUSP 1G | EACH | 8 | $31.97 | Nov 7, 2025 |
| LR400750 | CIP RECYCLING 5.0 | SQ YD | 8 | $5.08 | Jun 12, 2026 |
| X0120014 | WATER MAIN ABANDON | EACH | 8 | $3,588.28 | Aug 2, 2024 |
| X0300358 | ADDITIONAL TREATMT N1 | EACH | 8 | $10,487.36 | Jan 16, 2026 |
| X0300359 | ADDITIONAL TREATMT N2 | EACH | 8 | $9,674.45 | Jan 16, 2026 |
| X0301028 | PUMP STA SCADA EQUIP | L SUM | 8 | $448,437.50 | Aug 1, 2025 |
| X0301032 | SIGN FRAME S-325 DBL | FOOT | 8 | $83.00 | Jan 17, 2025 |
| X0301033 | SIGN FRAME S-325 SING | FOOT | 8 | $95.50 | Jan 17, 2025 |
| X0301036 | BASE PLATE S-325 | EACH | 8 | $328.13 | Jan 17, 2025 |
| X0301037 | BASE PLATE S-218 | EACH | 8 | $381.25 | Jan 17, 2025 |
| X0301372 | REPR/UPGR EX VAT-CAT | EACH | 8 | $341.11 | Feb 27, 2026 |
| X0321322 | DROP GATE | EACH | 8 | $2,540.83 | Jun 12, 2020 |
| X0322881 | TREE TRIMMING | EACH | 8 | $208.24 | Jan 20, 2023 |
| X0323260 | SEDIMENT BASIN | EACH | 8 | $2,917.16 | Sep 19, 2025 |
| X0323261 | TEMP SEDIMENT BASIN | EACH | 8 | $2,000.35 | Sep 19, 2025 |
| X0323814 | SAN SEW REMOV 18 | FOOT | 8 | $30.33 | Jun 17, 2022 |
| X0323868 | DRAINAGE RESTRICTOR | EACH | 8 | $2,650.88 | Jan 16, 2026 |
| X0323879 | SERVICE PATROL | CAL DA | 8 | $4,557.00 | Jan 16, 2026 |
| X0323906 | CAMERA POLE 45 FT | EACH | 8 | $7,205.35 | Jan 20, 2023 |
| X0324028 | GROUT FOR RIPRAP | CU YD | 8 | $370.55 | Apr 26, 2024 |
| X0324450 | SEG CONC BLK WALL, SP | SQ FT | 8 | $40.87 | Nov 18, 2022 |
| X0324915 | RELOC LT UNIT & POLE | EACH | 8 | $3,508.88 | Jun 17, 2022 |
| X0325130 | TUBULAR TRAF SGN POST | EACH | 8 | $116.82 | Jan 19, 2024 |
| X0325225 | BRICK PAVT REM & REPL | SQ FT | 8 | $15.70 | Mar 8, 2024 |
| X0325256 | REP HIGH TC (BRIFEN) | FOOT | 8 | $14.11 | Sep 23, 2022 |
| X0325258 | REP HTCSEND (BRIFEN) | EACH | 8 | $910.67 | Sep 23, 2022 |
| X0325260 | REPAIR POSTS (BRIFEN) | EACH | 8 | $249.34 | Sep 23, 2022 |
| X0325850 | SONAR-JET TREATMENT | EACH | 8 | $49,584.80 | Jan 16, 2026 |
| X0325896 | WEED CNTRL TOTAL VEGN | GALLON | 8 | $1,100.42 | Apr 24, 2026 |
| X0325975 | REP HTCSEND (GBRLTAR) | EACH | 8 | $1,273.46 | Sep 23, 2022 |
| X0326020 | UTILTY PROTECTION PAD | SQ YD | 8 | $167.35 | Feb 27, 2026 |
| X0326174 | REPAIR EX SIGN ASSBLY | EACH | 8 | $55.44 | Nov 7, 2025 |
| X0326458 | PAVEMENT REPL SPL | SQ YD | 8 | $151.96 | Nov 8, 2024 |
| X0326461 | CCTV EQPT FBR OPT DST | EACH | 8 | $5,759.25 | Jun 12, 2026 |
| X0326712 | ABAN FILL EX SAN SEW | EACH | 8 | $1,381.14 | Mar 10, 2023 |
| X0326718 | INSTAL REST AREA SIGN | EACH | 8 | $244.58 | Jan 17, 2025 |
| X0326808 | INTERST WKEND CLSR SP | L SUM | 8 | $206,541.69 | Nov 17, 2023 |
| X0326863 | BRICK SIDEWALK | SQ FT | 8 | $17.50 | Jun 17, 2022 |
| X0326891 | TEMP ACCESS RD SP | SQ YD | 8 | $23.70 | Jun 12, 2026 |
| X0327111 | MAGNUM BREAKER | EACH | 8 | $31,646.15 | Jan 16, 2026 |
| X0327171 | SCARIFY EX SURFACE | SQ YD | 8 | $2.75 | Jul 31, 2026 |
| X0327350 | TEMP WP 50 CL4 15 MA | EACH | 8 | $1,564.07 | Jun 16, 2023 |
| X0327577 | PROT-MAINT EX UP LUM | L SUM | 8 | $38,772.79 | Jan 20, 2023 |
| X0327592 | LARGE ENTRANCE SIGN | EACH | 8 | $12,860.74 | Jul 31, 2026 |
| X0327601 | CCTV CAM STR FD 80 MH | FOOT | 8 | $1,067.61 | Jun 12, 2026 |
| X0327757 | FDN CONSTR EX OBSTRNS | EACH | 8 | $3,983.90 | Jun 14, 2024 |
| X0484300 | MEDIAN INLET BOX REM | EACH | 8 | $1,051.80 | Apr 28, 2023 |
| X0800003 | COARSE AGR BACKFIL SP | CU YD | 8 | $39.17 | Jun 16, 2023 |
| X0943700 | WELL CHEMICAL TREAT | EACH | 8 | $46,801.50 | Jan 16, 2026 |
| X0970001 | WZ SPEED L SIGN ASSEM | CAL DA | 8 | $8.47 | Jan 15, 2021 |
| X1200007 | TEMP WD POLE 80FT CL4 | EACH | 8 | $8,604.93 | Jun 14, 2024 |
| X1200016 | SAN SERVICE REPLCMNT | EACH | 8 | $699.44 | Feb 27, 2026 |
| X1200043 | PCC JUNCTION CHAMBER | EACH | 8 | $60,582.36 | Mar 8, 2024 |
| X1200140 | PCBC SPL | FOOT | 8 | $1,244.31 | Aug 2, 2024 |
| X1200211 | DEEP WELL VIDEO INSP | L SUM | 8 | $45,596.06 | Jan 16, 2026 |
| X1200230 | PRES TEST & DISINFECT | L SUM | 8 | $12,833.56 | Jul 31, 2026 |
| X1200234 | SHOULDER INLET WITH CURB | EACH | 8 | $6,449.23 | Jul 31, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.