| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| K0013060 | P PL SEDG MDW 2X4 DPG | UNIT | 11 | $300.83 | Nov 8, 2024 |
| K1004539 | PLANT WATERING | UNIT | 11 | $105.50 | Jan 16, 2026 |
| X0300266 | WOODEN FENCE REMOV | FOOT | 11 | $28.25 | Aug 2, 2024 |
| X0301797 | GATE REMOVAL | EACH | 11 | $424.48 | Jun 12, 2020 |
| X0301852 | DEWATERING STRUCT N1 | EACH | 11 | $12,946.31 | Jun 11, 2021 |
| X0301993 | REM & REIN C HWL P DR | EACH | 11 | $382.79 | Jun 16, 2023 |
| X0320015 | MAINT TRAFF ILL TLWY | L SUM | 11 | $26,918.36 | Nov 5, 2021 |
| X0320089 | TRAFFIC COUNTER- TIRTL SYSTEM | EACH | 11 | $45,371.30 | Jul 31, 2026 |
| X0321690 | BRICK WALL REMOV | FOOT | 11 | $31.61 | Jan 16, 2026 |
| X0322765 | REL VIDEO VEH DET SYS | EACH | 11 | $2,420.28 | Mar 8, 2024 |
| X0323957 | FOC SPLICE - MAINLINE | EACH | 11 | $5,264.38 | Jun 17, 2022 |
| X0324013 | NOISE AB WALL STR MT | SQ FT | 11 | $73.56 | Feb 27, 2026 |
| X0324603 | CB 1P 20A/120V EX CAB | EACH | 11 | $226.10 | Jan 16, 2026 |
| X0325476 | RADAR VEH DETECT SYST | EACH | 11 | $16,991.22 | Apr 28, 2023 |
| X0326144 | TAC/DET WARNING SURFC | SQ FT | 11 | $30.41 | Sep 22, 2023 |
| X0326662 | CUR-IN-PL PIPE LNR 24 | FOOT | 11 | $164.49 | Sep 23, 2022 |
| X0326671 | CONC SURF COLOR TRMNT | SQ FT | 11 | $12.55 | Jan 17, 2025 |
| X0326948 | CCTV CAMERA STR 50 MH | EACH | 11 | $8,580.73 | Feb 27, 2026 |
| X0327032 | TEMP VIDEO DETECTION | EACH | 11 | $9,585.32 | Nov 8, 2024 |
| X0327576 | TEMPORARY PATCHING | SQ YD | 11 | $32.53 | Mar 10, 2023 |
| X0783500 | P.S. MECHANICAL WORK | L SUM | 11 | $593,400.95 | Apr 25, 2025 |
| X0795800 | COARSE AGGREGATE | TON | 11 | $21.37 | Apr 28, 2023 |
| X1200246 | WATERMAIN CASING PIPE | FOOT | 11 | $456.15 | Jun 12, 2026 |
| X1400094 | LUM LED HM LOW WATT | EACH | 11 | $840.67 | Apr 26, 2019 |
| X1400156 | RADAR VEH DET SY SAFB | EACH | 11 | $9,398.79 | Aug 2, 2024 |
| X1400209 | 45 A LT P 15 DV ARM | EACH | 11 | $5,151.26 | Apr 24, 2026 |
| X1400514 | TACTICS LICENSE EXPNSN | EACH | 11 | $822.43 | Jun 12, 2026 |
| X1700037 | CONC BAR BS SP 2 | FOOT | 11 | $171.64 | Jan 16, 2026 |
| X2020114 | GRAD & SHAP DITCH SPL | FOOT | 11 | $25.56 | Jun 12, 2026 |
| X2300017 | STL RAILING TY SM SPL | FOOT | 11 | $238.87 | Sep 19, 2025 |
| X2800302 | TEMP DITCH CHECKS SPL | FOOT | 11 | $11.23 | Sep 19, 2025 |
| X4020500 | AGG SURF CSE B 6 | SQ YD | 11 | $12.57 | Apr 24, 2026 |
| X4406030 | PART DEP REM T1 3 | SQ YD | 11 | $119.25 | Jun 14, 2024 |
| X4420579 | CL A PATCH T4 12 SPL | SQ YD | 11 | $210.97 | Jun 13, 2025 |
| X4421021 | CL B PATCH T4 12 SPL | SQ YD | 11 | $190.41 | Apr 24, 2026 |
| X4421829 | CL D PTCH T3 9 SPL | SQ YD | 11 | $138.10 | Apr 26, 2024 |
| X5090850 | ORNAMENTAL RAILING | FOOT | 11 | $291.81 | Jul 31, 2026 |
| X5091730 | BRIDGE FENCE RAIL SP | FOOT | 11 | $244.06 | Apr 24, 2026 |
| X5230176 | DRAINAGE SCUPPR DS-12 | EACH | 11 | $2,967.84 | Sep 18, 2026 |
| X5420201 | DROP BOX NO.1 | EACH | 11 | $25,968.21 | Jun 12, 2026 |
| X5538800 | SS CLEANED 48 | FOOT | 11 | $20.32 | Aug 1, 2025 |
| X5610804 | NON-PRES CONN EX WM | EACH | 11 | $4,147.47 | Jul 31, 2026 |
| X5630405 | REM EX WATER VALVE | EACH | 11 | $990.29 | Jun 12, 2026 |
| X6020065 | INLETS TG-1 DBL (SPL) | EACH | 11 | $8,734.11 | Jun 12, 2026 |
| X6020076 | INLETS SPL W/SPL F&G | EACH | 11 | $4,002.58 | Jul 31, 2026 |
| X6020293 | MH TA 8D W/2 T1FCL RP | EACH | 11 | $27,457.49 | Jun 12, 2026 |
| X6022930 | MAN TA 5 DIA SPL F&G | EACH | 11 | $7,392.55 | Jul 31, 2026 |
| X6029510 | CB TC W/SPL F&G | EACH | 11 | $2,413.01 | Apr 24, 2026 |
| X6310306 | REP TB TERM T1 SP PST | EACH | 11 | $82.68 | Sep 18, 2026 |
| X6330800 | GDRL POST VERT ADJUST | EACH | 11 | $81.19 | Sep 18, 2026 |
| X6640302 | CH LK FENCE REMOV SP | FOOT | 11 | $8.43 | Nov 7, 2025 |
| X7010809 | TRAF CONT-PROT TC9 | EACH | 11 | $1,131.49 | Sep 18, 2026 |
| X7010817 | TRAF CONT-PROT TC17 | EACH | 11 | $962.99 | Sep 18, 2026 |
| X7200085 | RPL/TIGH CLP PER SIGN | EACH | 11 | $775.46 | Mar 7, 2025 |
| X7200200 | WIDE LOAD SIGNING | L SUM | 11 | $3,388.23 | Jan 20, 2023 |
| X7230200 | INSTALL SIGN PANEL T2 | SQ FT | 11 | $22.97 | Nov 7, 2025 |
| X7330112 | SAFETY CHAIN | EACH | 11 | $223.48 | Jan 16, 2026 |
| X8030110 | LOC UNDERGR CABLE SPL | EACH | 11 | $26.35 | Jun 12, 2026 |
| X8211125 | LUM LED HM SPL | EACH | 11 | $957.66 | Apr 24, 2020 |
| X8212031 | LUMINAIRE, TYPE A SPL | EACH | 11 | $2,023.40 | Apr 24, 2026 |
| X8302125 | WOOD POLE 25 CL 4 | EACH | 11 | $2,179.15 | Jul 31, 2026 |
| X8710054 | FO TERM PANEL 12F 24F | EACH | 11 | $1,459.87 | Feb 27, 2026 |
| X8800101 | PED PUSH-BUTTON SPL | EACH | 11 | $752.95 | Aug 1, 2025 |
| XX003803 | SAN SEW SERVICE 6 | FOOT | 11 | $109.90 | Jul 31, 2026 |
| XX005940 | REMOTE CONTR VIDEO SY | EACH | 11 | $5,223.82 | Jul 31, 2026 |
| XX007092 | REC REF PVT MARKR REM | EACH | 11 | $29.91 | Jul 31, 2026 |
| XX008068 | LUMINAIRE INST TYPE 1 | EACH | 11 | $1,303.81 | Jan 17, 2025 |
| XX008269 | WAYFINDING SIGN | EACH | 11 | $4,032.96 | Jul 31, 2026 |
| XX009049 | R&R CURB & GUTTER SPL | FOOT | 11 | $41.81 | Feb 27, 2026 |
| XX127400 | PAVT REM & REPL SPL | TON | 11 | $275.28 | Apr 24, 2026 |
| XZ127900 | RETAINING WALL REMOV | FOOT | 11 | $37.58 | Nov 17, 2023 |
| XZ193300 | SURVEY MARKER T1 SPL | EACH | 11 | $546.72 | Mar 7, 2025 |
| Z0007610 | BLDG REMOV NO 10 | L SUM | 11 | $18,131.89 | Jun 12, 2026 |
| Z0007611 | BLDG REMOV NO 11 | L SUM | 11 | $23,711.88 | Jun 12, 2026 |
| Z0010511 | CLEAN & PT STL BR N11 | L SUM | 11 | $68,795.61 | Apr 24, 2026 |
| Z0017500 | DRAIN UTIL STR ADJ SP | EACH | 11 | $883.34 | Apr 24, 2026 |
| Z0021912 | SILICONE JT SEAL 2.5 | FOOT | 11 | $91.27 | Jan 16, 2026 |
| Z0022810 | FENCE REMOVAL SPECIAL | FOOT | 11 | $12.32 | Jun 14, 2024 |
| Z0029602 | TEMPORARY SIGNING | EACH | 11 | $387.21 | Apr 26, 2024 |
| Z0038113 | PVT REM FOR PATCH CC | CU YD | 11 | $584.83 | Sep 18, 2026 |
| Z0042500 | POST SPL | EACH | 11 | $242.73 | Apr 24, 2026 |
| Z0049802 | R&D FRIABL ASB BLD 2 | L SUM | 11 | $6,397.47 | Jan 16, 2026 |
| Z0050400 | REM & REPL ANCH BOLTS | EACH | 11 | $526.62 | Jun 12, 2026 |
| Z0052200 | REPAIR SPBGR TY C | FOOT | 11 | $22.32 | Sep 20, 2024 |
| Z0052395 | TIGHTEN U-BOLT | EACH | 11 | $335.87 | Jan 16, 2026 |
| Z0056624 | STORM SEW WM REQ 42 | FOOT | 11 | $579.54 | Feb 27, 2026 |
| Z0057200 | SAN SEW 15 | FOOT | 11 | $208.70 | Jan 16, 2026 |
| Z0062454 | PAVT REPLACE CONC SPL | CU YD | 11 | $1,139.07 | Sep 18, 2026 |
| Z0062455 | PAVT REPLACEMENT CONC | CU YD | 11 | $1,031.73 | Sep 18, 2026 |
| Z0065796 | RIPRAP SLURRY | SQ YD | 11 | $27.75 | Nov 17, 2023 |
| Z0073300 | TEMP SHORING & CRIB | L SUM | 11 | $21,623.68 | Jan 16, 2026 |
| 20600200 | GRAN EMBANK SPEC | CU YD | 10 | $65.37 | Aug 2, 2024 |
| 28100725 | STONE DUMP RIP CL B3 | SQ YD | 10 | $63.72 | Apr 24, 2026 |
| 31100900 | SUB GRAN MAT A 10 | SQ YD | 10 | $14.05 | Aug 1, 2025 |
| 35501300 | HMA BASE CSE 4 | SQ YD | 10 | $53.80 | Apr 24, 2026 |
| 35501315 | HMA BASE CSE 7 3/4 | SQ YD | 10 | $37.13 | Sep 19, 2025 |
| 35501326 | HMA BASE CSE 10 1/2 | SQ YD | 10 | $82.43 | Feb 27, 2026 |
| 40200300 | AGG SURF CSE A 4 | SQ YD | 10 | $13.07 | Aug 1, 2025 |
| 40604012 | HMA SC IL-9.5FG D N70 | TON | 10 | $129.75 | Apr 24, 2026 |
| 40604100 | P HMA SC 9.5FG C N50 | TON | 10 | $154.82 | Jun 12, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.