| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| 35101600 | AGG BASE CSE B 4 | SQ YD | 457 | $8.92 | Sep 18, 2026 |
| 78011125 | GRV RCSD PVT MRKG 25 | FOOT | 451 | $6.71 | Sep 18, 2026 |
| 70106700 | TEMP RUMBLE STRIPS | EACH | 449 | $898.06 | Sep 18, 2026 |
| 70100405 | TRAF CONT-PROT 701321 | EACH | 441 | $18,313.43 | Sep 18, 2026 |
| Z0010501 | CLEAN & PT STL BR N1 | L SUM | 438 | $355,892.34 | Sep 18, 2026 |
| 81028240 | UNDRGRD C GALVS 4 | FOOT | 436 | $68.50 | Sep 18, 2026 |
| 88102717 | PED SH LED 1F BM CDT | EACH | 433 | $790.43 | Sep 18, 2026 |
| 40603085 | HMA BC IL-19.0 N70 | TON | 429 | $87.57 | Sep 18, 2026 |
| 50500505 | STUD SHEAR CONNECTORS | EACH | 429 | $4.52 | Sep 18, 2026 |
| 50157300 | PROTECTIVE SHIELD | SQ YD | 428 | $44.92 | Sep 18, 2026 |
| 87800415 | CONC FDN TY E 36D | FOOT | 428 | $457.93 | Sep 18, 2026 |
| Z0073510 | TEMP TR SIGNAL TIMING | EACH | 428 | $1,041.65 | Jan 16, 2026 |
| 20100500 | TREE REMOV ACRES | ACRE | 426 | $13,288.88 | Sep 18, 2026 |
| 78011000 | GRV RCSD PM LTR & SYM | SQ FT | 426 | $5.66 | Sep 18, 2026 |
| 70102622 | TR CONT & PROT 701502 | L SUM | 424 | $7,888.50 | Sep 18, 2026 |
| 550A0340 | STORM SEW CL A 2 12 | FOOT | 422 | $67.45 | Jul 31, 2026 |
| 78011065 | GRV RCSD PVT MRKG 13 | FOOT | 420 | $3.27 | Sep 18, 2026 |
| X7200061 | TEMP INFO SIGNING | SQ FT | 420 | $22.44 | Sep 18, 2026 |
| Z0062456 | TEMP PAVEMENT | SQ YD | 414 | $52.12 | Sep 18, 2026 |
| 50800105 | REINFORCEMENT BARS | POUND | 412 | $1.61 | Jul 31, 2026 |
| 88600600 | DET LOOP REPL | FOOT | 412 | $14.64 | Apr 26, 2024 |
| 64200116 | SHOULDER RUM STRIP 16 | FOOT | 411 | $0.4473 | Sep 18, 2026 |
| 60500040 | REMOV MANHOLES | EACH | 410 | $706.52 | Sep 18, 2026 |
| 87301305 | ELCBL C LEAD 14 1PR | FOOT | 410 | $2.13 | Sep 18, 2026 |
| 40604052 | HMA SC IL-9.5 C N70 | TON | 409 | $100.71 | Sep 18, 2026 |
| 70600260 | IMP ATTN TEMP FRN TL3 | EACH | 409 | $6,436.67 | Sep 18, 2026 |
| 44000159 | HMA SURF REM 2 1/2 | SQ YD | 405 | $3.73 | Sep 18, 2026 |
| 60300105 | FR & GRATES ADJUST | EACH | 405 | $552.35 | Sep 18, 2026 |
| 60618300 | CONC MEDIAN SURF 4 | SQ FT | 405 | $7.76 | Sep 18, 2026 |
| 40600295 | P BIT MATLS TACK CT | POUND | 404 | $1.07 | Sep 18, 2026 |
| 70100700 | TRAF CONT-PROT 701406 | L SUM | 403 | $20,517.33 | Sep 18, 2026 |
| 44200050 | WELDED WIRE REINF | SQ YD | 400 | $15.40 | Sep 18, 2026 |
| 89502376 | REBUILD EX HANDHOLE | EACH | 400 | $2,462.87 | Sep 18, 2026 |
| 40201000 | AGGREGATE-TEMP ACCESS | TON | 398 | $36.30 | Sep 18, 2026 |
| 44000164 | HMA SURF REM 3 3/4 | SQ YD | 398 | $4.63 | Sep 18, 2026 |
| 78011045 | GRV RCSD PVT MRKG 9 | FOOT | 396 | $1.45 | Sep 18, 2026 |
| 20101350 | TREE PRUN OVER 10 | EACH | 395 | $151.47 | Sep 18, 2026 |
| 28001100 | TEMP EROS CONTR BLANK | SQ YD | 395 | $0.5701 | Sep 18, 2026 |
| 21400100 | GRADING & SHAP DITCH | FOOT | 392 | $12.99 | Sep 18, 2026 |
| 42000060 | WELDED WIRE REINF | SQ YD | 391 | $11.51 | Sep 18, 2026 |
| 81028220 | UNDRGRD C GALVS 3 | FOOT | 391 | $46.81 | Sep 18, 2026 |
| 44000300 | CURB REM | FOOT | 388 | $10.03 | Sep 18, 2026 |
| Z0016002 | DECK SLAB REP (FD-T2) | SQ YD | 381 | $1,238.06 | Sep 18, 2026 |
| 20700220 | POROUS GRAN EMBANK | CU YD | 376 | $56.77 | Sep 18, 2026 |
| 20101100 | TREE TRUNK PROTECTION | EACH | 371 | $126.52 | Sep 18, 2026 |
| 25000200 | SEEDING CL 2 | ACRE | 371 | $2,052.66 | Sep 18, 2026 |
| 87301805 | ELCBL C SERV 6 2C | FOOT | 368 | $5.47 | Sep 18, 2026 |
| 54213669 | PRC FLAR END SEC 24 | EACH | 367 | $1,802.75 | Sep 18, 2026 |
| 59300100 | CONTR LOW-STRENG MATL | CU YD | 367 | $170.08 | Sep 18, 2026 |
| 52200020 | TEMP SOIL RETEN SYSTM | SQ FT | 366 | $46.78 | Sep 18, 2026 |
| 54213657 | PRC FLAR END SEC 12 | EACH | 363 | $1,214.06 | Sep 18, 2026 |
| 80400100 | ELECT SERV INSTALL | EACH | 359 | $6,453.67 | Sep 18, 2026 |
| 28100105 | STONE RIPRAP CL A3 | SQ YD | 358 | $39.88 | Sep 18, 2026 |
| 60406100 | FR & LIDS T1 CL | EACH | 357 | $415.22 | Sep 18, 2026 |
| 60250200 | CB ADJUST | EACH | 356 | $641.53 | Sep 18, 2026 |
| 63000003 | SPBGR TY A 9FT POSTS | FOOT | 356 | $34.03 | Sep 18, 2026 |
| 72400710 | RELOC SIGN PANEL T1 | SQ FT | 356 | $25.11 | Sep 18, 2026 |
| 60221100 | MAN TA 5 DIA T1F CL | EACH | 355 | $5,322.42 | Jul 31, 2026 |
| 73000100 | WOOD SIN SUPPORT | FOOT | 355 | $25.18 | Sep 18, 2026 |
| 58700300 | CONCRETE SEALER | SQ FT | 354 | $1.92 | Sep 18, 2026 |
| 60500050 | REMOV CATCH BAS | EACH | 353 | $658.71 | Sep 18, 2026 |
| 88500100 | INDUCTIVE LOOP DETECT | EACH | 348 | $230.82 | Sep 18, 2026 |
| Z0004562 | COMB C C&G REM & REPL | FOOT | 348 | $37.97 | Aug 2, 2024 |
| 35101800 | AGG BASE CSE B 6 | SQ YD | 347 | $12.20 | Sep 18, 2026 |
| X2501000 | SEEDING CL 2 SPL | ACRE | 342 | $5,800.57 | Sep 18, 2026 |
| X4400501 | COMB C&G REMOV REPL < = 10FT | FOOT | 342 | $54.55 | Sep 18, 2026 |
| 60108204 | PIPE UNDERDR T 2 4 | FOOT | 339 | $14.68 | Sep 18, 2026 |
| X7011015 | TR C-PROT EXPRESSWAYS | L SUM | 339 | $334,538.36 | Sep 18, 2026 |
| Z0012130 | BR DECK SCAR 3/4 | SQ YD | 339 | $54.95 | Jul 31, 2026 |
| 20101300 | TREE PRUN 1-10 | EACH | 337 | $77.16 | Sep 18, 2026 |
| 40800029 | BIT MATLS TACK CT | POUND | 336 | $0.9203 | Sep 18, 2026 |
| 88030020 | SH LED 1F 3S MAM | EACH | 335 | $909.84 | Sep 18, 2026 |
| 89000100 | TEMP TR SIG INSTALL | EACH | 335 | $60,765.56 | Sep 18, 2026 |
| 60604400 | COMB CC&G TB6.18 | FOOT | 332 | $41.61 | Sep 18, 2026 |
| 81400300 | DBL HANDHOLE | EACH | 332 | $4,505.82 | Sep 18, 2026 |
| 55100700 | STORM SEWER REM 15 | FOOT | 329 | $20.80 | Sep 18, 2026 |
| 84200804 | REM POLE FDN | EACH | 329 | $579.91 | Sep 18, 2026 |
| 60146304 | P UNDR FOR STRUCT 4 | FOOT | 328 | $30.21 | Sep 18, 2026 |
| 81028350 | UNDRGRD C PVC 2 | FOOT | 323 | $17.96 | Sep 18, 2026 |
| X4022000 | TEMP ACCESS- COM ENT | EACH | 323 | $871.19 | Sep 18, 2026 |
| 42000080 | PVT CON PCC BR APP SL | SQ YD | 321 | $193.63 | Sep 18, 2026 |
| 87800150 | CONC FDN TY C | FOOT | 321 | $904.75 | Jul 31, 2026 |
| 78001130 | PAINT PVT MK LINE 6 | FOOT | 320 | $0.2337 | Jul 31, 2026 |
| 81400200 | HD HANDHOLE | EACH | 320 | $3,789.02 | Sep 18, 2026 |
| 52100010 | ELAST BEARING ASSY T1 | EACH | 319 | $1,825.52 | Sep 18, 2026 |
| 70100825 | TRAF CONT-PROT 701456 | L SUM | 319 | $7,605.52 | Sep 18, 2026 |
| 25000700 | AGR GROUND LIMESTONE | TON | 318 | $187.34 | Sep 18, 2026 |
| 63500105 | DELINEATORS | EACH | 316 | $74.55 | Jul 31, 2026 |
| 70300251 | TEMP PVT MK LINE 8 - PAINT | FOOT | 314 | $0.4306 | Sep 18, 2026 |
| 70300250 | TEMP PVT MK LINE 8 | FOOT | 313 | $0.4124 | Nov 5, 2021 |
| X5030250 | BR DECK GROOVING LONG | SQ YD | 313 | $8.34 | Sep 18, 2026 |
| 70400125 | PIN TEMP CONC BARRIER | EACH | 312 | $22.30 | Sep 18, 2026 |
| 72400200 | REMOV SIN PAN ASSY TB | EACH | 312 | $117.37 | Sep 18, 2026 |
| 50500405 | F & E STRUCT STEEL | POUND | 311 | $9.14 | Sep 18, 2026 |
| 54213660 | PRC FLAR END SEC 15 | EACH | 311 | $1,387.61 | Sep 18, 2026 |
| 44213000 | PATCH REINFORCEMENT | SQ YD | 308 | $60.54 | Sep 18, 2026 |
| Z0016200 | DECK SLAB REP (PART) | SQ YD | 308 | $466.34 | Sep 18, 2026 |
| Z0029090 | DIAMOND GRIND BR SEC | SQ YD | 307 | $11.75 | Sep 18, 2026 |
| 87502500 | TS POST GALVS 16 | EACH | 305 | $2,155.17 | Sep 18, 2026 |
| Z0007101 | C&D LEAD PT CL RS N1 | L SUM | 305 | $103,920.50 | Sep 18, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.