| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| 60200305 | CB TA 4 DIA T3F&G | EACH | 34 | $3,783.72 | Apr 24, 2026 |
| 60404300 | FR & GRATES T3 | EACH | 34 | $534.88 | Sep 18, 2026 |
| 60406001 | FR & LIDS T1 ADA COMPL OL | EACH | 34 | $810.63 | Sep 18, 2026 |
| 60500305 | FILL INLETS | EACH | 34 | $681.19 | Sep 18, 2026 |
| 60609200 | COMB CC&G TM6.12 | FOOT | 34 | $45.59 | Sep 18, 2026 |
| 63000009 | SPBGR TY B 9FT POSTS | FOOT | 34 | $49.59 | Jan 16, 2026 |
| 64200214 | SINUSOIDAL RUM STP 14 | FOOT | 34 | $0.5444 | Sep 18, 2026 |
| 70102631 | TR CONT & PROT 701601 | EACH | 34 | $6,984.85 | Sep 18, 2026 |
| 78004625 | PREF PL PM TD STD LN 5 | FOOT | 34 | $6.04 | Jul 31, 2026 |
| 81028330 | UNDRGRD C PVC 1 1/4 | FOOT | 34 | $18.91 | Jun 12, 2026 |
| 87702870 | STL COMB MAA&P 28 | EACH | 34 | $18,476.12 | Sep 18, 2026 |
| A2008470 | T-ULMUS AMER PRNC 2.5 | EACH | 34 | $595.05 | Nov 7, 2025 |
| X0327739 | MISC ELECTRICAL WORK | L SUM | 34 | $181,375.65 | Apr 24, 2026 |
| X0327989 | REMOVE EXSTNG BR PAV | SQ FT | 34 | $4.57 | Sep 18, 2026 |
| X0350805 | FOLD DOWN BOLLARDS | EACH | 34 | $1,634.14 | Jan 16, 2026 |
| X2010510 | CLEARING & GRUBBING | L SUM | 34 | $10,288.62 | Apr 24, 2026 |
| X6026200 | INLETS ADJUST SPL | EACH | 34 | $2,148.41 | Jul 31, 2026 |
| X7010239 | CHANGEABLE MSG SN SPL | CAL WK | 34 | $295.85 | Jun 12, 2026 |
| X7280105 | TELES STL SIN SUP SPL | FOOT | 34 | $16.14 | Apr 24, 2026 |
| X7800845 | HS THPL PM LN 8 | FOOT | 34 | $0.6763 | Sep 18, 2026 |
| X8620250 | UNINTER PS CAB SPL | EACH | 34 | $7,881.66 | Sep 18, 2026 |
| X8870300 | EVP SYSTEM | EACH | 34 | $13,302.30 | Apr 24, 2026 |
| XP000015 | DIGGER DERRICK | HOUR | 34 | $76.90 | Sep 18, 2026 |
| XP000106 | BUCHANAN FUSEHLDR KIT | EACH | 34 | $76.39 | Sep 18, 2026 |
| Z0003850 | BENCHES | EACH | 34 | $3,282.23 | Jul 31, 2026 |
| Z0018800 | DRAINAGE SYSTEM | L SUM | 34 | $71,732.45 | Sep 23, 2022 |
| Z0073400 | TEMP SUPPORT SYSTEM | EACH | 34 | $11,373.82 | Jun 12, 2026 |
| 30200650 | PROCESS MOD SOIL 12 | SQ YD | 33 | $4.10 | Jul 31, 2026 |
| 35300400 | PCC BSE CSE 9 | SQ YD | 33 | $64.61 | Jan 16, 2026 |
| 44201709 | CL D PATCH T3 5 | SQ YD | 33 | $41.48 | Jul 31, 2026 |
| 44201711 | CL D PATCH T4 5 | SQ YD | 33 | $53.58 | Jul 31, 2026 |
| 52000030 | PREF JOINT SEAL 2 1/2 | FOOT | 33 | $72.43 | Jan 16, 2026 |
| 52100505 | ANCHOR BOLTS 5/8 | EACH | 33 | $97.95 | Jan 19, 2024 |
| 542C0217 | P CUL CL C 1 12 | FOOT | 33 | $79.03 | Jun 12, 2026 |
| 56105100 | WATER VALVES 10 | EACH | 33 | $3,907.92 | Jun 12, 2026 |
| 56300300 | ADJ WATER SERV LINES | FOOT | 33 | $63.16 | Apr 24, 2026 |
| 56500300 | DOM MET VLTS ADJ | EACH | 33 | $491.83 | Sep 18, 2026 |
| 61100500 | EXPLOR TRENCH 52 | FOOT | 33 | $4.31 | Feb 27, 2026 |
| 66900400 | SPL WAST GRD WAT DISP | GALLON | 33 | $0.6551 | Sep 18, 2026 |
| 70306100 | TEMP PVT MK LTR & SYM T3 TAPE | SQ FT | 33 | $3.34 | Apr 26, 2024 |
| 70600330 | IMP ATTN REL FRD TL3 | EACH | 33 | $2,875.31 | Jun 12, 2026 |
| 73300200 | OVHD SIN STR-SPAN T2A | FOOT | 33 | $1,201.39 | Apr 24, 2026 |
| 73600200 | REMOV OH SIN STR-CANT | EACH | 33 | $6,922.23 | Mar 7, 2025 |
| 85700300 | FAC T5 CAB | EACH | 33 | $30,713.51 | Jun 12, 2026 |
| 87700320 | S MAA & P 55 | EACH | 33 | $22,639.76 | Sep 18, 2026 |
| A2007616 | T-TAXODIUM DIS 2 | EACH | 33 | $440.91 | Apr 24, 2026 |
| AR108158 | 1/C #8 5 KV UG CABLE IN UD | L.F. | 33 | $6.92 | Aug 5, 2022 |
| X0300019 | REM REIN PARKING BLKS | EACH | 33 | $93.22 | Jun 12, 2026 |
| X0301430 | PREC CONC PARK BLOCK | EACH | 33 | $194.84 | Jul 31, 2026 |
| X0322278 | RODENT SHIELDS | EACH | 33 | $97.06 | Sep 18, 2026 |
| X0323388 | TRAFFIC COUNTER | EACH | 33 | $10,941.79 | Jul 31, 2026 |
| X0325893 | CLEAN EX END SECTION | EACH | 33 | $755.76 | Jun 12, 2026 |
| X0327640 | REAL-TIME TR CONT CBU | CAL MO | 33 | $2,526.00 | Apr 26, 2024 |
| X1400031 | REM PED PUSH-BUTTON | EACH | 33 | $202.25 | Sep 18, 2026 |
| X2500900 | SEEDING CL 1 SPL | ACRE | 33 | $11,732.55 | Jun 12, 2026 |
| X5030550 | PROTECTIVE COAT SPL | SQ YD | 33 | $32.47 | Jun 12, 2026 |
| X5051206 | STRUCT STEEL REPAIR | POUND | 33 | $28.27 | Jul 31, 2026 |
| X6020084 | MANHOLE SPECIAL | EACH | 33 | $29,825.37 | Apr 24, 2026 |
| X6025600 | MAN ADJUST SPL | EACH | 33 | $2,223.31 | Jul 31, 2026 |
| X7010118 | TEMP RUMBLE STRIPS SP | EACH | 33 | $1,529.03 | Sep 18, 2026 |
| X7050167 | TEMP TRBT T1 SPL TAN | EACH | 33 | $4,259.36 | Sep 18, 2026 |
| X7200075 | REM & REIN SIGN PANEL | SQ FT | 33 | $14.27 | Sep 18, 2026 |
| X8760055 | PED P-B POST TA | EACH | 33 | $1,070.79 | Jul 31, 2026 |
| Z0029658 | REP TB TERM T1 SP PST | EACH | 33 | $204.35 | Jun 14, 2024 |
| Z0033024 | MAINT EX LTG SYS | L SUM | 33 | $11,867.16 | Apr 24, 2026 |
| 21301072 | EXPLOR TRENCH 72 | FOOT | 32 | $42.12 | Jul 31, 2026 |
| 48203033 | HMA SHOULDERS 9 | SQ YD | 32 | $70.30 | Apr 24, 2026 |
| 54213459 | END SECTIONS 24 | EACH | 32 | $638.45 | Jun 12, 2026 |
| 550A2560 | SS RG CL A 2 24 | FOOT | 32 | $92.11 | Feb 27, 2026 |
| 56106400 | ADJ WATER MAIN 8 | FOOT | 32 | $278.85 | Apr 24, 2026 |
| 56106600 | ADJ WATER MAIN 12 | FOOT | 32 | $333.81 | Jan 16, 2026 |
| 60605500 | COMB CC&G TB6.24 VWGF | FOOT | 32 | $64.18 | Apr 24, 2026 |
| 81100500 | CON AT ST 1 1/2 GALVS | FOOT | 32 | $47.09 | Jul 31, 2026 |
| 81603040 | UD 2#6 #8G XLPUSE 1 | FOOT | 32 | $13.97 | Sep 18, 2026 |
| 82500360 | LT CONT BASEM 480V100 | EACH | 32 | $14,121.02 | Jun 12, 2026 |
| 87300010 | GROUND HH FR & COVER | EACH | 32 | $211.04 | Jul 31, 2026 |
| AR401610 | BITUMINOUS SURFACE COURSE | TON | 32 | $118.53 | Aug 5, 2022 |
| K0013030 | P PL WETLND 2X4 DPPLG | UNIT | 32 | $422.66 | Jul 31, 2026 |
| X0326654 | ORNAM LIGHT UNIT COMP | EACH | 32 | $9,758.29 | Feb 27, 2026 |
| X0326862 | STRUCTURE ADJ | EACH | 32 | $525.94 | Jan 16, 2026 |
| X2800400 | PERIMETER EROS BAR SP | FOOT | 32 | $8.02 | Jun 12, 2026 |
| X5420624 | PIPE CULV CLEANED 24 | FOOT | 32 | $31.30 | Nov 5, 2021 |
| X6061702 | CONC MED TSM DOW | SQ FT | 32 | $17.32 | Jun 12, 2026 |
| X6310088 | TRAF BAR TERM T6A SPL | EACH | 32 | $3,068.41 | Jul 31, 2026 |
| X8420502 | REM LT TOWER NO SALV | EACH | 32 | $4,892.93 | Jan 16, 2026 |
| Z0051398 | REM EX SIGN POST | EACH | 32 | $151.83 | Jun 12, 2026 |
| Z0052000 | REPAIR SPBGR TY A | FOOT | 32 | $34.48 | Sep 20, 2024 |
| Z0056650 | SS 1 WAT MN 15 | FOOT | 32 | $140.08 | Apr 24, 2026 |
| Z0076870 | UNDR CONNECT TO STR | EACH | 32 | $477.40 | Apr 24, 2026 |
| 25100127 | MULCH METHOD 3A | ACRE | 31 | $3,569.39 | Sep 18, 2026 |
| 31100500 | SUB GRAN MAT A 6 | SQ YD | 31 | $13.82 | Nov 7, 2025 |
| 40604002 | HMA SC IL-9.5FG C N70 | TON | 31 | $120.28 | Jul 31, 2026 |
| 40604064 | HMA SC IL-9.5 D N90 | TON | 31 | $114.33 | Apr 24, 2026 |
| 44200148 | PAVT PATCH T3 12 | SQ YD | 31 | $192.55 | Jul 31, 2026 |
| 44200172 | PAVT PATCH T3 14 | SQ YD | 31 | $259.70 | Jun 12, 2026 |
| 44201373 | CL C PATCH T1 12 | SQ YD | 31 | $209.86 | Sep 18, 2026 |
| 44201403 | CL C PATCH T2 14 | SQ YD | 31 | $197.27 | Sep 18, 2026 |
| 50104701 | REM EX CONC DECK N1 | EACH | 31 | $593,022.36 | Feb 27, 2026 |
| 550A0110 | STORM SEW CL A 1 21 | FOOT | 31 | $90.35 | Jun 12, 2026 |
| 550A2540 | SS RG CL A 2 18 | FOOT | 31 | $70.48 | Feb 27, 2026 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.