| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| X0327354 | STORMWTR TRTMT SYS L2 | L SUM | 1 | $13,592.24 | Nov 9, 2018 |
| X0327366 | TEMP AGGREGATE WEDGE | TON | 1 | $63.00 | Nov 18, 2022 |
| X0327374 | REM TEMP SOIL RET SYS | SQ FT | 1 | $20.00 | Jun 17, 2022 |
| X0327377 | SAN SEWER DI 6 | FOOT | 1 | $254.30 | Jun 12, 2026 |
| X0327393 | WOOD POLE 100 CL 2 | EACH | 1 | $5,427.30 | Jun 15, 2018 |
| X0327395 | ID DISP EXIST RR TIES | L SUM | 1 | $233,000.00 | Aug 2, 2019 |
| X0327404 | DRINK FOUNT REM REPL | EACH | 1 | $3,900.00 | Jan 17, 2020 |
| X0327407 | CORR FIBER SID PANELS | SQ FT | 1 | $76.00 | Apr 26, 2024 |
| X0327410 | CAST ALUM SP PED BASE | EACH | 1 | $1,736.37 | Nov 8, 2019 |
| X0327412 | RAILROAD TIES REMOVED | FOOT | 1 | $25.00 | Apr 26, 2024 |
| X0327426 | BRICK PAVER BANDING | SQ FT | 1 | $18.00 | Apr 28, 2023 |
| X0327450 | CONN EX CONC TRAN FDN | EACH | 1 | $140.16 | Nov 8, 2019 |
| X0327469 | MASONRY FC BRICK REPR | SQ FT | 1 | $85.60 | Jun 17, 2022 |
| X0327470 | MASONRY SEALER | SQ FT | 1 | $5.60 | Jun 17, 2022 |
| X0327472 | ROOF SMPLG & ACM ID | L SUM | 1 | $1,000.00 | Jan 20, 2023 |
| X0327473 | HANDLING OF ACM | L SUM | 1 | $19,000.00 | Jan 20, 2023 |
| X0327510 | GRANITE BLOCK REPLACE | SQ FT | 1 | $120.00 | Nov 8, 2019 |
| X0327545 | SOIL SAMPLE & TESTING | EACH | 1 | $100,000.00 | Apr 26, 2019 |
| X0327549 | SAN SEW ML REPAIR 10 | FOOT | 1 | $250.00 | Jan 21, 2022 |
| X0327550 | SAN SEW ML REPAIR 12 | FOOT | 1 | $372.00 | Jan 21, 2022 |
| X0327551 | SAN SEW ML REPAIR 15 | FOOT | 1 | $450.00 | Jan 21, 2022 |
| X0327575 | SS DI 30 | FOOT | 1 | $3,050.00 | Jan 17, 2020 |
| X0327578 | GATE VALVE 10 VAULT 4 | EACH | 1 | $6,338.00 | Mar 6, 2020 |
| X0327595 | REM EX KIOSK &SALVAGE | EACH | 1 | $1,000.00 | Jun 12, 2020 |
| X0327596 | P P CONC I-BM REPAIR | L SUM | 1 | $13,380.58 | Sep 21, 2018 |
| X0327598 | LOCATE TUNNEL | L SUM | 1 | $5,000.00 | Apr 24, 2020 |
| X0327599 | BULKHEAD TUNNEL | L SUM | 1 | $165,000.00 | Jun 14, 2019 |
| X0327613 | REM EX WEATHER STATION | L SUM | 1 | $8,740.90 | Jun 12, 2026 |
| X0327679 | STL CAS P AUG/JKD 30 | FOOT | 1 | $1,130.00 | Jun 17, 2022 |
| X0327686 | STL CAS PIP JCKBOR 24 | FOOT | 1 | $967.00 | Sep 19, 2025 |
| X0327691 | GRATING CONC HDWL N1 | EACH | 1 | $8,497.47 | Jun 15, 2018 |
| X0327692 | GRATING CONC HDWL N2 | EACH | 1 | $8,376.47 | Jun 15, 2018 |
| X0327707 | FLOW METER | EACH | 1 | $35,000.00 | Nov 6, 2020 |
| X0327723 | STANDARD TEST CONN 1 | EACH | 1 | $100.00 | Mar 5, 2021 |
| X0327725 | ADD DEPTH OF MANHOLES | FOOT | 1 | $250.00 | Jun 15, 2018 |
| X0327726 | MEMBR WATERPR CULVERT | SQ YD | 1 | $55.00 | Aug 3, 2018 |
| X0327741 | ETHER SWTCH L324P MO | EACH | 1 | $10,280.00 | Mar 8, 2019 |
| X0327748 | REM & REPL ITS EQUIP | EACH | 1 | $134,000.00 | Apr 26, 2019 |
| X0327749 | DUCT IRON SLEEVE, 16" | EACH | 1 | $2,300.00 | Jul 30, 2021 |
| X0327762 | RAILROAD FLAGGER | L SUM | 1 | $6,000.00 | Nov 9, 2018 |
| X0327764 | COMM HUT ELECT WORK | L SUM | 1 | $30,425.51 | Sep 17, 2021 |
| X0327775 | ABUTMENT VLT DR RETROFIT | EACH | 1 | $1,900.00 | Mar 7, 2025 |
| X0327778 | HANGER ASSEMBLY ARCH | L SUM | 1 | $1,400,000.00 | Apr 26, 2019 |
| X0327780 | FRP RAILING | FOOT | 1 | $197.80 | Jul 31, 2020 |
| X0327782 | FRP STAIR SYSTEM | SQ FT | 1 | $117.15 | Jul 31, 2020 |
| X0327783 | REMOVAL OF TEMP BERM | CU YD | 1 | $30.00 | Mar 5, 2021 |
| X0327786 | CUR-IN-PL PIPE LNR 15 | FOOT | 1 | $60.00 | Nov 6, 2020 |
| X0327789 | CUR-IN-PL PIPE LNR 60 | FOOT | 1 | $610.00 | Sep 20, 2019 |
| X0327795 | WELL CASING REPAIR | L SUM | 1 | $67,100.00 | Jun 13, 2025 |
| X0327840 | LT P WD 90 CL4 2-15MA | EACH | 1 | $10,600.00 | Mar 9, 2018 |
| X0327850 | LT P WD 90 CL4 3-15MA | EACH | 1 | $10,950.00 | Mar 9, 2018 |
| X0327965 | ELCBL 19 50PR | FOOT | 1 | $16.26 | Jan 21, 2022 |
| X0327977 | TRACK MONITORING | L SUM | 1 | $70,100.00 | Jun 12, 2026 |
| X0327988 | PREF PL PM TB LINE 11 | FOOT | 1 | $17.00 | Jun 15, 2018 |
| X0327990 | BATHYMETRIC SURVEYS | L SUM | 1 | $20,000.00 | Sep 21, 2018 |
| X0327994 | CTA PROTECTIVE SHIELD | L SUM | 1 | $150,000.00 | Nov 9, 2018 |
| X0328002 | GROUT CURTAIN WALL | CU FT | 1 | $150.00 | Jul 12, 2019 |
| X0328007 | CUR-IN-PL PIPE LNR 32 | FOOT | 1 | $290.00 | Jun 17, 2022 |
| X0328010 | SEATWALL 19' HT | FOOT | 1 | $450.00 | Mar 11, 2022 |
| X0328011 | REM REINST STN PAVER | FOOT | 1 | $72.00 | Jan 21, 2022 |
| X0328012 | CNTRLDSTFNS COLUMN GRND IMPRV | L SUM | 1 | $212,000.00 | Jan 21, 2022 |
| X0328014 | REVLAC CNTRL SYS PT/C | L SUM | 1 | $100,000.00 | Jun 17, 2022 |
| X0328015 | FIBER LAYOUT | L SUM | 1 | $10,000.00 | Jun 17, 2022 |
| X0328019 | REM & RE ERECT MSE PANELS | SQ FT | 1 | $400.00 | Nov 18, 2022 |
| X0328021 | CENTRACS ADV CCTV MOD/SRVR | EACH | 1 | $105,359.80 | Sep 23, 2022 |
| X0328025 | TIMB FEND REPL | FOOT | 1 | $335.00 | Apr 26, 2024 |
| X0328028 | ROOF HATCH | EACH | 1 | $7,200.00 | Apr 26, 2024 |
| X0328029 | FIXED LOUVER | EACH | 1 | $6,800.00 | Apr 26, 2024 |
| X0328030 | FORMED METAL WALL PANELS | EACH | 1 | $12,000.00 | Apr 26, 2024 |
| X0328031 | HMA CL REPAIR 3 3/4 | SQ YD | 1 | $29.00 | Jun 16, 2023 |
| X0328035 | BRIDGE BARRIER | FOOT | 1 | $925.00 | Jun 14, 2024 |
| X0328037 | HI M T LOW D MOT MAT ONLY | EACH | 1 | $1,000.00 | Jun 14, 2024 |
| X0328038 | BRIDGE ROLL-IN | L SUM | 1 | $250,000.00 | Sep 19, 2025 |
| X0328039 | CENTRACS SWITCH | EACH | 1 | $9,435.01 | Jun 12, 2026 |
| X0328040 | CENTRACS SRVR SW | EACH | 1 | $598,883.47 | Jun 12, 2026 |
| X0328050 | BUILDING WIRING | L SUM | 1 | $9,988.53 | Apr 24, 2026 |
| X0328503 | TRAFFIC GATE ASS VW4 | EACH | 1 | $265,301.00 | Apr 25, 2025 |
| X0328504 | BOLLARDS SPL | EACH | 1 | $533.57 | Apr 25, 2025 |
| X0328542 | FRN MCHNY BRAKES LOC2 | EACH | 1 | $105,000.00 | Jan 16, 2026 |
| X0328552 | FRN MOTOR BRAKES LOC2 | EACH | 1 | $95,000.00 | Jan 16, 2026 |
| X0328560 | FRN RACK AND PINION | L SUM | 1 | $200,000.00 | Jan 16, 2026 |
| X0328561 | ELEC INCINRTNG TOILET | EACH | 1 | $5,375.00 | Jan 16, 2026 |
| X0328605 | SAN S DI 18" | FOOT | 1 | $471.00 | Apr 25, 2025 |
| X0328606 | STMP CLD PCCCWK 9 3/4 | SQ FT | 1 | $36.00 | Apr 25, 2025 |
| X0328607 | WTR MAIN ABNDND 14" | FOOT | 1 | $32.00 | Apr 25, 2025 |
| X0328608 | WTR SVC CONN SHRT RES | EACH | 1 | $2,980.00 | Apr 25, 2025 |
| X0328609 | WTR SVC CONN LNG RES | EACH | 1 | $5,450.00 | Apr 25, 2025 |
| X0328610 | WTR SVC CONN SRT COM | EACH | 1 | $10,500.00 | Apr 25, 2025 |
| X0328611 | WTR SVC CONN LNG COM | EACH | 1 | $17,900.00 | Apr 25, 2025 |
| X0328614 | SAN SEW PVC DR 25 30 | FOOT | 1 | $470.00 | Apr 25, 2025 |
| X0328615 | SAN SEW PVC DR 26 8 | FOOT | 1 | $232.00 | Apr 25, 2025 |
| X0328616 | SAN SEW PVC DR 26 10 | FOOT | 1 | $250.00 | Apr 25, 2025 |
| X0328617 | SAN SEW PVC DR 26 12 | FOOT | 1 | $265.00 | Apr 25, 2025 |
| X0328618 | SAN SEW PVC DR 21 10 | FOOT | 1 | $364.00 | Apr 25, 2025 |
| X0328619 | SAN SEW PVC DR 21 12 | FOOT | 1 | $273.00 | Apr 25, 2025 |
| X0328620 | SAN SEW PVC DR 18 6 | FOOT | 1 | $165.00 | Apr 25, 2025 |
| X0328621 | SAN SEW PVC DR 18 8 | FOOT | 1 | $490.00 | Apr 25, 2025 |
| X0328622 | SAN SEW PVC DR 18 12 | FOOT | 1 | $265.00 | Apr 25, 2025 |
| X0328623 | SAN SEW PVC DR 18 18 | FOOT | 1 | $350.00 | Apr 25, 2025 |
| X0328628 | ABNFL EX SANSEW CLSM4 | FOOT | 1 | $32.00 | Apr 25, 2025 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.