IDOT Bid Averages

13,847 bid codes Sign up free

Average unit prices · Statewide

ExcelCSV
Bid codeDescriptionUnitJobs ▼QuantityAvg low bidAvg all bidsAvg estimateLow rangeLast let
AW705645UNDERDRAIN CONNECTIONEACH 17 $1,292.95$1,292.95— $1,292.95 – $1,292.95Jun 11, 2021
AW751410INLETEACH 19 $5,583.20$5,583.20— $5,583.20 – $5,583.20Jun 11, 2021
AW751540MANHOLE 4'EACH 11 $6,347.22$6,347.22— $6,347.22 – $6,347.22Jun 11, 2021
AW751550MANHOLE 5'EACH 11 $7,287.55$7,287.55— $7,287.55 – $7,287.55Jun 11, 2021
AW751900REMOVE INLETEACH 12 $940.33$940.33— $940.33 – $940.33Jun 11, 2021
AW901510SEEDINGACRE 114.6 $2,674.06$2,674.06— $2,674.06 – $2,674.06Jun 11, 2021
AW904510SODDINGSQ YD 12,570 $37.03$37.03— $37.03 – $37.03Jun 11, 2021
AW908515HEAVY-DUTY HYDRAULIC MULCHACRE 114.6 $4,642.87$4,642.87— $4,642.87 – $4,642.87Jun 11, 2021
AW950110ROADWAY SIGN, STOPEACH 11 $5,477.20$5,477.20— $5,477.20 – $5,477.20Jun 11, 2021
AX109902REMOVE ELECTRICAL EQUIPMENTL SUM 11 $5,265.84$5,265.84— $5,265.84 – $5,265.84Jun 11, 2021
AX125901REMOVE STAKE MOUNTED LIGHTEACH 121 $78.99$78.99— $78.99 – $78.99Jun 11, 2021
AX125902REMOVE BASE MOUNTED LIGHTEACH 112 $276.46$276.46— $276.46 – $276.46Jun 11, 2021
AX125903REMOVE INPAVEMENT LIGHTEACH 11 $803.04$803.04— $803.04 – $803.04Jun 11, 2021
AX125904REMOVE TAXI GUIDANCE SIGNEACH 15 $408.10$408.10— $408.10 – $408.10Jun 11, 2021
AX125912REMOVE RETROREFLECTIVE MARKEREACH 18 $408.10$408.10— $408.10 – $408.10Jun 11, 2021
AX152410UNCLASSIFIED EXCAVATIONCU YD 19,150 $15.40$15.40— $15.40 – $15.40Jun 11, 2021
AX152621REMOVE CONCRETECU YD 1113 $144.16$144.16— $144.16 – $144.16Jun 11, 2021
AX156520INLET PROTECTIONEACH 17 $665.80$665.80— $665.80 – $665.80Jun 11, 2021
AX401650BITUMINOUS PAVEMENT MILLINGSQ YD 18,460 $20.84$20.84— $20.84 – $20.84Jun 11, 2021
AX501120RUBBLIZE PAVEMENTSQ YD 18,460 $25.05$25.05— $25.05 – $25.05Jun 11, 2021
AX901510SEEDINGACRE 15.3 $2,674.06$2,674.06— $2,674.06 – $2,674.06Jun 11, 2021
AX908515HEAVY-DUTY HYDRAULIC MULCHACRE 15.3 $4,642.87$4,642.87— $4,642.87 – $4,642.87Jun 11, 2021
AY152455EMBANKMENT IN PLACECU YD 113,610 $12.93$12.93— $12.93 – $12.93Jun 11, 2021
AY156520INLET PROTECTIONEACH 13 $1,153.36$1,153.36— $1,153.36 – $1,153.36Jun 11, 2021
AY401650BITUMINOUS PAVEMENT MILLINGSQ YD 115,170 $15.56$15.56— $15.56 – $15.56Jun 11, 2021
AY501120RUBBLIZE PAVEMENTSQ YD 120,410 $26.24$26.24— $26.24 – $26.24Jun 11, 2021
AY901510SEEDINGACRE 16.2 $2,674.06$2,674.06— $2,674.06 – $2,674.06Jun 11, 2021
AY908515HEAVY-DUTY HYDRAULIC MULCHACRE 16.2 $4,642.87$4,642.87— $4,642.87 – $4,642.87Jun 11, 2021
AZ1081081/C #8 5 KV UG CABLEFOOT 170 $3.36$3.36— $3.36 – $3.36Jun 11, 2021
AZ1081581/C #8 5 KV UG CABLE IN UDFOOT 11,620 $9.54$9.54— $9.54 – $9.54Jun 11, 2021
AZ1082582/C #8 5 KV UG CABLE IN UDFOOT 1640 $5.34$5.34— $5.34 – $5.34Jun 11, 2021
AZ1087061/C #6 COUNTERPOISEFOOT 12,330 $4.68$4.68— $4.68 – $4.68Jun 11, 2021
AZ1105044-WAY CONCRETE ENCASED DUCTFOOT 160 $76.35$76.35— $76.35 – $76.35Jun 11, 2021
AZ110610ELECTRICAL HANDHOLEEACH 12 $2,764.57$2,764.57— $2,764.57 – $2,764.57Jun 11, 2021
AZ125416MITL-BASE MOUNTED-LEDEACH 115 $1,843.04$1,843.04— $1,843.04 – $1,843.04Jun 11, 2021
AZ125443TAXI GUIDANCE SIGN, 3 CHARACTEREACH 11 $6,492.79$6,492.79— $6,492.79 – $6,492.79Jun 11, 2021
AZ125902REMOVE BASE MOUNTED LIGHTEACH 113 $276.46$276.46— $276.46 – $276.46Jun 11, 2021
AZ152410UNCLASSIFIED EXCAVATIONCU YD 14,120 $32.88$32.88— $32.88 – $32.88Jun 11, 2021
AZ152511SUBGRADE REPAIRSQ YD 1100 $83.57$83.57— $83.57 – $83.57Jun 11, 2021
AZ154506GRANULAR SUBBASE - 6"SQ YD 14,740 $53.06$53.06— $53.06 – $53.06Jun 11, 2021
AZ156513SEPARATION FABRICSQ YD 1100 $21.92$21.92— $21.92 – $21.92Jun 11, 2021
AZ156520INLET PROTECTIONEACH 112 $639.01$639.01— $639.01 – $639.01Jun 11, 2021
AZ209606CRUSHED AGG. BASE COURSE - 6"SQ YD 14,740 $60.13$60.13— $60.13 – $60.13Jun 11, 2021
AZ401610BITUMINOUS SURFACE COURSETON 11,020 $193.19$193.19— $193.19 – $193.19Jun 11, 2021
AZ403610BITUMINOUS BASE COURSETON 12,540 $201.50$201.50— $201.50 – $201.50Jun 11, 2021
AZ603510BITUMINOUS TACK COATGALLON 12,090 $9.93$9.93— $9.93 – $9.93Jun 11, 2021
AZ620520PAVEMENT MARKING-WATERBORNESQ FT 11,990 $1.70$1.70— $1.70 – $1.70Jun 11, 2021
AZ620525PAVEMENT MARKING-BLACK BORDERSQ FT 12,020 $2.17$2.17— $2.17 – $2.17Jun 11, 2021
AZ620900PAVEMENT MARKING REMOVALSQ FT 111,320 $1.35$1.35— $1.35 – $1.35Jun 11, 2021
AZ70151818" RCP, CLASS IVFOOT 1680 $117.54$117.54— $117.54 – $117.54Jun 11, 2021
AZ70152424" RCP, CLASS IVFOOT 11,015 $131.65$131.65— $131.65 – $131.65Jun 11, 2021
AZ701900REMOVE PIPEFOOT 11,030 $21.16$21.16— $21.16 – $21.16Jun 11, 2021
AZ7055244" PERFORATED UNDERDRAIN W/SOCKFOOT 11,540 $36.44$36.44— $36.44 – $36.44Jun 11, 2021
AZ705640UNDERDRAIN CLEANOUTEACH 13 $3,114.84$3,114.84— $3,114.84 – $3,114.84Jun 11, 2021
AZ705645UNDERDRAIN CONNECTIONEACH 12 $1,292.95$1,292.95— $1,292.95 – $1,292.95Jun 11, 2021
AZ751410INLETEACH 16 $5,465.66$5,465.66— $5,465.66 – $5,465.66Jun 11, 2021
AZ751560MANHOLE 6'EACH 14 $8,698.04$8,698.04— $8,698.04 – $8,698.04Jun 11, 2021
AZ751900REMOVE INLETEACH 11 $940.33$940.33— $940.33 – $940.33Jun 11, 2021
AZ901510SEEDINGACRE 14.8 $2,674.06$2,674.06— $2,674.06 – $2,674.06Jun 11, 2021
AZ904510SODDINGSQ YD 1830 $37.03$37.03— $37.03 – $37.03Jun 11, 2021
AZ908515HEAVY-DUTY HYDRAULIC MULCHACRE 14.8 $4,642.87$4,642.87— $4,642.87 – $4,642.87Jun 11, 2021
B2000112T-ACER CAMP TF 1-1/2EACH 19 $370.00$511.25— $370.00 – $370.00Apr 29, 2022
B2000116T-ACER CAMP TF 2EACH 15 $815.00$708.62— $815.00 – $815.00Jun 12, 2020
B2000121T-ACER TATRM TF 2EACH 14 $500.00$679.20— $500.00 – $500.00Nov 5, 2021
B2000122T-ACER TATRM TF 2-1/2EACH 15 $800.00$669.00— $800.00 – $800.00Apr 26, 2019
B2000131T-ACER FREM MAT 2EACH 15 $550.00$555.50— $550.00 – $550.00Apr 24, 2026
B2000170T-ACER CAMP CL 8'EACH 15 $617.00$617.00— $617.00 – $617.00Jun 12, 2026
B2000668T-AMELAN X GF SF 7'EACH 13 $815.00$780.14— $815.00 – $815.00Jan 16, 2026
B2000762T-AMEL X GF AB SF 4'EACH 14 $210.10$198.15— $210.10 – $210.10Jun 11, 2021
B2000774T-AMEL X GF AB TF 3EACH 14 $850.00$933.33— $850.00 – $850.00Apr 26, 2019
B2000962T-AMELAN LAEV CL 4'EACH 1283 $386.00$386.00— $386.00 – $386.00Jun 12, 2026
B2001064T-BETUL NIG LK CL 5'EACH 115 $450.00$428.33— $450.00 – $450.00Jun 12, 2020
B2001066T-BETUL NIG LK CL 6'EACH 13 $308.00$521.42— $308.00 – $308.00Jun 12, 2026
B2001206T-CERCIS CAN CER 2-1/2" CTFEACH 14 $565.00$583.33— $565.00 – $565.00Jun 16, 2023
B2001225T-CERCIS CAN COL ER 5'EACH 17 $480.00$484.80— $480.00 – $480.00Apr 24, 2026
B2001364T-CORNUS FLOR CL 5'EACH 120 $300.00$310.13— $300.00 – $300.00Jan 19, 2018
B2001366T-CORNUS FLOR CL 6'EACH 110 $230.00$230.00— $230.00 – $230.00Jan 21, 2022
B2001445T-CORNUS MAS GG CF 5EACH 117 $341.00$382.17— $341.00 – $341.00Apr 26, 2024
B2001462T-CORNUS MAS SF 4'EACH 110 $290.00$405.00— $290.00 – $290.00Apr 24, 2020
B2001468T-CORNUS MAS GG CF 6EACH 115 $398.00$352.67— $398.00 – $398.00Jan 20, 2023
B20014G5T-CORNUS MAS CG 5GEACH 153 $165.00$165.00— $165.00 – $165.00Sep 18, 2026
B2001564T-CRATAE CRUS SF 5'EACH 13 $349.00$424.33— $349.00 – $349.00Apr 26, 2024
B2001566T-CRATAE CRUS SF 6'EACH 12 $518.00$380.50— $518.00 – $518.00Mar 8, 2024
B2001570T-CRATAE CRUS SF 8'EACH 13 $340.00$332.33— $340.00 – $340.00Jun 12, 2020
B2001716T-CRAT C-I C TF 2EACH 15 $564.00$587.80— $564.00 – $564.00Aug 2, 2019
B2001864T-CRATAE MOLL CL 5'EACH 121 $188.00$287.00— $188.00 – $188.00Aug 3, 2018
B2001866T-CRATAE MOLL CL 6'EACH 131 $223.00$349.12— $223.00 – $223.00Apr 24, 2020
B2001920T-CRAT PHAE TF 2-1/2EACH 16 $498.48$993.91— $498.48 – $498.48Sep 23, 2022
B2001964T-CRAT PHAE CL 5'EACH 17 $375.00$362.50— $375.00 – $375.00Jan 17, 2020
B2002268T-CRAT VIR WK CL 7'EACH 110 $512.30$456.83— $512.30 – $512.30Jun 11, 2021
B2002302T-CRAT X MRD T TF 2EACH 19 $443.00$518.45— $443.00 – $443.00Apr 26, 2024
B2002364T-HALESIA TETR CL 5'EACH 19 $450.00$439.56— $450.00 – $450.00Apr 27, 2018
B2002410T-MAGNOL LOE MER CL8EACH 160 $600.00$775.00— $600.00 – $600.00Jul 31, 2026
B2002416T-MAGNOL SOL TF 2EACH 11 $560.00$560.00— $560.00 – $560.00Apr 28, 2023
B2002564T-MAGNOL STEL SF 5'EACH 124 $400.00$325.14— $400.00 – $400.00Sep 19, 2025
B2002566T-MAGNOL STEL SF 6'EACH 160 $600.00$740.00— $600.00 – $600.00Jul 31, 2026
B2002580T-JUNIP SCOP 2EACH 111 $800.00$791.67— $800.00 – $800.00Jan 16, 2026
B2002664T-MALUS ADAM CL 5'EACH 13 $485.00$730.00— $485.00 – $485.00Nov 17, 2023
B2002724T-MALUS ADIR TF 3EACH 18 $528.00$582.62— $528.00 – $528.00Jan 17, 2020
B2003094T-MALUS CENT TF 2EACH 111 $336.00$336.00— $336.00 – $336.00Aug 2, 2024
10,901–11,000 of 13,847‹ PrevNext ›

Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.