| AR800567 | FILL PIPE WITH CLSM | L.F. | 1 | $39.00 | Jan 15, 2021 |
| AR800568 | 16" HDPE PIPE | L.F. | 1 | $74.00 | Jan 15, 2021 |
| AR800569 | 18" HDPE PIPE | L.F. | 1 | $92.00 | Jan 15, 2021 |
| AR800571 | PAVEMENT MARKING-SPEC., HAND. SYM. | EACH | 1 | $365.00 | Apr 27, 2018 |
| AR800574 | PAVEMENT MARKING-SPEC., ARR.-RIGHT | EACH | 1 | $100.00 | Jun 15, 2018 |
| AR800586 | REMOVE EXISTING FUELING FACILITY | L.S. | 1 | $5,500.00 | Nov 9, 2018 |
| AR800589 | BIT.MILLINGS SUBBASE, 6" | S.Y. | 1 | $4.49 | Aug 3, 2018 |
| AR800597 | CLEAN EXISTING DRAINAGE STRUCTURE | EACH | 1 | $1,400.00 | Apr 26, 2019 |
| AR800816 | L-804 RGL ELEVATED, BASE MOUNTED | EACH | 1 | $5,060.00 | Jan 21, 2022 |
| AR800860 | REMOVE AND REPLACE INLET | EACH | 1 | $1,500.00 | Mar 5, 2021 |
| AR800873 | REPLACE BASE MNTD RWY THRESHOLD LGH | EACH | 1 | $478.00 | Apr 24, 2020 |
| AR800874 | REPLACE 5 CHAR SIGN ON EXIST. FOUND | EACH | 1 | $3,488.00 | Apr 24, 2020 |
| AR800875 | RELOCATE EXIST 2 CHAR SIGN TO NEW F | EACH | 1 | $8,883.00 | Apr 24, 2020 |
| AR800876 | RELOCATE EXIST 5 CHAR SIGN TO NEW F | EACH | 1 | $9,460.00 | Apr 24, 2020 |
| AR800877 | RELOCATE EXIST 6 CHAR SIGN TO NEW F | EACH | 1 | $9,460.00 | Apr 24, 2020 |
| AR800878 | REMOVE BIT PVMNT & REPLACE W/ NEW P | S.Y. | 1 | $328.00 | Apr 24, 2020 |
| AR800893 | 2-WAY 2" DIRECTIONAL BORE | FOOT | 1 | $91.04 | Aug 5, 2022 |
| AR800894 | 3-WAY 3" DIRECTIONAL BORE | FOOT | 1 | $97.49 | Aug 5, 2022 |
| AR800895 | 2-WAY 2" PVC SCHEDULE 80 CONDUIT, D | FOOT | 1 | $49.63 | Aug 5, 2022 |
| AR800896 | 3-WAY 3" PVC SCHEDULE 80 CONDUIT, D | FOOT | 1 | $69.12 | Aug 5, 2022 |
| AR800897 | 2 #6 XLP-USE, 1 #8 GND IN 1" UD | FOOT | 1 | $10.81 | Aug 5, 2022 |
| AR800898 | 3 #6 XLP-USE, 1 #8 GND IN 1" UD | FOOT | 1 | $12.01 | Aug 5, 2022 |
| AR800899 | 2 #8 XLP-USE, 1 #8 GND IN 1" UD | FOOT | 1 | $13.12 | Aug 5, 2022 |
| AR800910 | BITUMINOUS PRESSURE RELIEF JOINT | L.F. | 1 | $20.00 | Aug 2, 2019 |
| AR800934 | TEMP. CONSTRUCT. SIGNS | L.S. | 1 | $2,250.00 | Aug 3, 2018 |
| AR800985 | FIELD LIGHTNING ARRESTOR | EACH | 1 | $606.00 | Sep 20, 2019 |
| AR800986 | PAVEMENT SWEEPING | L.S. | 1 | $28,000.00 | Apr 24, 2020 |
| AR800999 | PAVEMENT RESTORATION | S.Y. | 1 | $228.29 | Jan 17, 2020 |
| AR801001 | PCC PATCH | S.Y. | 1 | $150.00 | Jul 31, 2020 |
| AR801002 | ADJUST MANHOLE & REPLACE CASTING | EACH | 1 | $850.00 | Jul 31, 2020 |
| AR801003 | EXTEND CONC. ENCASED SPLIT DUCT | L.F. | 1 | $425.00 | Jul 31, 2020 |
| AR801004 | INFILTRATION TRENCH | L.F. | 1 | $50.00 | Jul 31, 2020 |
| AR801005 | 1-WAY SPLIT DUCT, CONC. ENCASED | L.F. | 1 | $70.70 | Nov 6, 2020 |
| AR801009 | 2-WAY 4" PVC DUCT, DIRECT BURY | L.F. | 1 | $23.39 | Nov 6, 2020 |
| AR801010 | INFILTRATION TRENCH - TYPE A | L.F. | 1 | $79.25 | Nov 6, 2020 |
| AR801011 | INFILTRATION TRENCH - TYPE B | L.F. | 1 | $40.41 | Nov 6, 2020 |
| AR801012 | CONCRETE CABLE BOTTOM | S.Y. | 1 | $206.34 | Nov 6, 2020 |
| AR801013 | PROTECTION BOLLARD | EACH | 1 | $2,005.21 | Nov 6, 2020 |
| AR801259 | 12" CIPP | L.F. | 1 | $77.76 | Mar 8, 2019 |
| AR801260 | 15" CIPP | L.F. | 1 | $83.60 | Mar 8, 2019 |
| AR801261 | 24" CIPP | L.F. | 1 | $155.69 | Mar 8, 2019 |
| AR801262 | GROUT REPAIR OF 66" CMP | L.S. | 1 | $7,480.00 | Mar 8, 2019 |
| AR801263 | INSERTION LINING OF 66" CMP | L.F. | 1 | $234.85 | Mar 8, 2019 |
| AR801264 | INSERTION LINER GROUTING | L.S. | 1 | $35,134.00 | Mar 8, 2019 |
| AR801312 | 18" EQUIV RND ELLIPTICAL RCP, CL IV | FOOT | 1 | $100.00 | Mar 9, 2018 |
| AR801337 | DETECTABLE WARNING SUFRACE | S.F. | 1 | $18.00 | Jan 19, 2018 |
| AR801339 | REMOVE FLAG POLE AND FOUNDATION | EACH | 1 | $500.00 | Jan 19, 2018 |
| AR801358 | SPALL REPAIR | S.F. | 1 | $155.00 | Jul 31, 2020 |
| AR801650 | CONCRETE PAVERS | S.F. | 1 | $28.58 | Apr 27, 2018 |
| AR801651 | BENCH | EACH | 1 | $2,103.06 | Apr 27, 2018 |
| AR801652 | FLAG POLE | EACH | 1 | $5,162.06 | Apr 27, 2018 |
| AR801653 | HANDHOLE, HEAVY DUTY | EACH | 1 | $3,300.04 | Apr 27, 2018 |
| AR801654 | REFURBISH LIGHT POLE | EACH | 1 | $4,227.98 | Apr 27, 2018 |
| AR801655 | LIGHT POLE FOUNDATION | EACH | 1 | $1,379.62 | Apr 27, 2018 |
| AR801656 | LIGHT POLE FOUNDATION (TYPE F7A) | EACH | 1 | $1,763.71 | Apr 27, 2018 |
| AR801657 | LIGHTING CONTROLLER FOUNDATION | EACH | 1 | $2,894.45 | Apr 27, 2018 |
| AR801658 | REMOVE CONCRETE FOUNDATION | EACH | 1 | $915.66 | Apr 27, 2018 |
| AR801659 | RELOCATE EXISTING LIGHT POLE | EACH | 1 | $1,579.35 | Apr 27, 2018 |
| AR801660 | REMOVE & REINSTALL SECURITY EQUIP. | EACH | 1 | $1,450.30 | Apr 27, 2018 |
| AR801662 | PARKING LED LUMINAIRE, TYPE V DISTR | EACH | 1 | $1,720.69 | Apr 27, 2018 |
| AR801663 | PARKING LED LUMINAIRE, TYPE II DIST | EACH | 1 | $1,720.69 | Apr 27, 2018 |
| AR801664 | RDWY LIGHT POLE | EACH | 1 | $4,240.27 | Apr 27, 2018 |
| AR801665 | LUMINAIRE BRACKET | EACH | 1 | $132.74 | Apr 27, 2018 |
| AR801666 | RELOCATE LIGHTING CONTROLLER | EACH | 1 | $1,769.85 | Apr 27, 2018 |
| AR801667 | RELOCATE LED LUMINAIRE | EACH | 1 | $424.03 | Apr 27, 2018 |
| AR801668 | RDWY LIGHT POLE, W/2 ARMS AND LUMIN | EACH | 1 | $6,976.16 | Apr 27, 2018 |
| AR801669 | DETECTABLE WARNING SURFACE | S.Y. | 1 | $344.14 | Apr 27, 2018 |
| AR801670 | PEDESTRIAN CROSSWALK TABLE | S.Y. | 1 | $111.13 | Apr 27, 2018 |
| AR801671 | PCC MEDIAN SURFACE 4" | S.F. | 1 | $7.65 | Apr 27, 2018 |
| AR801763 | METALLIC FRANGIBLE COUPLING | EACH | 1 | $201.00 | Apr 23, 2021 |
| AR801764 | LIGHT BASE REPLACEMENT | EACH | 1 | $1,000.00 | Apr 23, 2021 |
| AR803003 | CONCRETE CABLE BOTTOM | S.Y. | 1 | $225.00 | Aug 2, 2019 |
| AR803015 | TEMPORARY PAVEMENT | S.Y. | 1 | $32.00 | Aug 3, 2018 |
| AR803062 | 48" DIA. CATCH BASIN W/18R SNOUT & | EACH | 1 | $6,480.00 | Jan 18, 2019 |
| AR803065 | CONSTRUCTION ENTRANCE | L.S. | 1 | $3,327.70 | Jan 18, 2019 |
| AR803066 | CORE & CONNECT TO EXISTING BOX MANH | EACH | 1 | $1,080.00 | Jan 18, 2019 |
| AR803071 | COIR WATTLE | EACH | 1 | $267.50 | Jan 18, 2019 |
| AR908512 | MULCHING-METHOD 2 | ACRE | 1 | $2,594.69 | Apr 27, 2018 |
| AR910201 | SIGN PANEL | S.F. | 1 | $139.02 | Apr 27, 2018 |
| AR910216 | TEMPORARY CONSTRUCTION SIGNS | L.S. | 1 | $5,000.00 | Aug 2, 2019 |
| AR910240 | SIGN SUPPORT | EACH | 1 | $146.40 | Apr 27, 2018 |
| AR910250 | TELESCOPING SIGN SUPPORT | EACH | 1 | $221.23 | Apr 27, 2018 |
| AR910320 | RAISED RETROREFLECTIVE MARKER | EACH | 1 | $245.00 | Apr 26, 2019 |
| AR910420 | BOLLARD | EACH | 1 | $1,500.00 | Jun 17, 2022 |
| AR910905 | REMOVE RDWY LGT POLE W/FIXTURE | EACH | 1 | $3,310.02 | Nov 6, 2020 |
| AR910965 | RELOCATE RDWY LGT POLE W/FXTR | EACH | 1 | $4,674.63 | Jan 18, 2019 |
| AR950110 | ROADWAY SIGN, STOP | EACH | 1 | $306.17 | Apr 27, 2018 |
| AS101510 | AIRPORT ROTATING BEACON | EACH | 1 | $129,000.00 | Jan 21, 2022 |
| AS101900 | BEACON REMOVAL | EACH | 1 | $9,560.00 | Jan 21, 2022 |
| AS108258 | 2/C #8 5 KV UG CABLE IN UD | L.F. | 1 | $6.00 | Aug 2, 2019 |
| AS109341 | 20 KW REGULATOR, STYLE 1 | EACH | 1 | $20,700.00 | Jul 30, 2021 |
| AS109903 | REMOVE REGULATOR | EACH | 1 | $1,370.00 | Jul 30, 2021 |
| AS109909 | REMOVE CONTROL PANEL | L.S. | 1 | $4,080.00 | Jul 30, 2021 |
| AS110013 | 3" DIRECTIONAL BORE | L.F. | 1 | $21.50 | Jan 19, 2018 |
| AS110202 | 2" PVC DUCT, DIRECT BURY | L.F. | 1 | $18.00 | Aug 3, 2018 |
| AS125400 | REPLACE ISOLATION TRANSFORMER | EACH | 1 | $515.00 | Jun 14, 2019 |
| AS125410 | MITL - STAKE MOUNTED | EACH | 1 | $595.00 | Jan 19, 2018 |
| AS125411 | MITL-STAKE MOUNTED-LED | EACH | 1 | $506.00 | Apr 23, 2021 |
| AS125416 | MITL-BASE MOUNTED-LED | EACH | 1 | $1,000.00 | Aug 2, 2019 |
| AS125417 | MITL-BASE MOUNTED IN SHOULDER | EACH | 1 | $1,688.56 | Jan 15, 2021 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.