IDOT Bid Averages

13,847 bid codes Sign up free

Average unit prices · Statewide

ExcelCSV
Bid codeDescriptionUnitJobs ▼QuantityAvg low bidAvg all bidsAvg estimateLow rangeLast let
AR119511AIRPORT OBSTRUCTION LIGHT-SINGLEEACH 13 $10,879.00$9,076.33— $10,879.00 – $10,879.00Jan 17, 2020
AR125401REPLACE LIGHT FIXTUREEACH 150 $450.00$450.00— $450.00 – $450.00Aug 2, 2019
AR125412MITL-STAKE MOUNTED (FIXTURE ONLY)EACH 188 $693.00$705.50— $693.00 – $693.00Mar 9, 2018
AR125417MITL-BASE MOUNTED IN SHOULDEREACH 17 $2,149.29$6,074.65— $2,149.29 – $2,149.29Jan 15, 2021
AR125418MITL-BASE MOUNTED (FIXTURE ONLY)EACH 114 $1,052.00$898.50— $1,052.00 – $1,052.00Mar 9, 2018
AR125447TAXI GUIDANCE SIGN, 7 CHARACTEREACH 18 $7,700.00$7,700.00— $7,700.00 – $7,700.00Jun 12, 2020
AR125448TAXI GUIDANCE SIGN, 8 CHARACTEREACH 14 $6,000.00$6,000.00— $6,000.00 – $6,000.00Aug 2, 2019
AR125506MIRL, STAKE MOUNTED-LEDEACH 131 $1,050.00$1,111.67— $1,050.00 – $1,050.00Sep 17, 2021
AR125540MI THRESHOLD LIGHT STAKE MTDEACH 112 $750.00$851.50— $750.00 – $750.00Nov 8, 2019
AR125541MI THRESHOLD LIGHT STAKE MTD-LEDEACH 114 $1,075.00$1,132.33— $1,075.00 – $1,075.00Sep 17, 2021
AR125550HI THRESHOLD LIGHT BASE MTDEACH 116 $2,470.00$2,706.42— $2,470.00 – $2,470.00Jun 11, 2021
AR125560RUNWAY DISTANCE REMAINING SIGNEACH 11 $727.07$3,863.54— $727.07 – $727.07Jan 15, 2021
AR1258015/8" X 10' COPPER COATED GROUND RODEACH 1830 $134.50$322.50— $134.50 – $134.50Apr 23, 2021
AR125900REMOVE STAKE MOUNTED LIGHT (FIXTUREEACH 188 $162.00$113.50— $162.00 – $162.00Mar 9, 2018
AR125905REMOVE RWY DISTANCE REMAIN SIGNEACH 18 $220.25$220.25— $220.25 – $220.25Nov 6, 2020
AR125909REMOVE VASIEACH 12 $2,500.00$4,455.20— $2,500.00 – $2,500.00Aug 3, 2018
AR125910REMOVE PLASIEACH 11 $2,591.25$2,045.63— $2,591.25 – $2,591.25Mar 6, 2020
AR125911REMOVE RUNWAY GUARD LIGHTEACH 12 $500.00$497.50— $500.00 – $500.00Jan 17, 2020
AR125913REMOVE EDGE LIGHTEACH 1292 $200.00$200.00— $200.00 – $200.00Aug 2, 2019
AR125921REPLACE STAKE MOUNTED LIGHTEACH 133 $368.00$358.88— $368.00 – $368.00Jan 15, 2021
AR125927REPLACE REILSPAIR 12 $26,300.00$31,162.00— $26,300.00 – $26,300.00Jul 30, 2021
AR125946ADJUST SPLICE CANEACH 16 $1,166.00$967.31— $1,166.00 – $1,166.00Jul 31, 2020
AR125968RELOCATE PAPIEACH 12 $51,333.85$38,816.93— $51,333.85 – $51,333.85Aug 5, 2022
AR125975RELOCATE RUNWAY GUARD LIGHTEACH 12 $1,250.00$1,285.00— $1,250.00 – $1,250.00Jan 17, 2020
AR150536LIGHTED RUNWAY CLOSURE MARKEREACH 12 $18,250.00$17,000.00— $18,250.00 – $18,250.00Apr 23, 2021
AR150550CONSTRUCTION ACCESSL.S. 11 $62,688.30$62,688.30— $62,688.30 – $62,688.30Apr 26, 2019
AR151410CLEARINGACRE 111.7 $10,000.00$10,000.00— $10,000.00 – $10,000.00Aug 5, 2022
AR151431STUMP REMOVAL 2.5 - 5.0 FT. DIAM.EACH 11 $150.00$1,040.00— $150.00 – $150.00Jan 21, 2022
AR151451CLEARING AND GRUBBING 0"-6"ACRE 12.4 $1,014.89$4,601.54— $1,014.89 – $1,014.89Apr 27, 2018
AR151460MISC. CLEARINGL SUM 11 $3,500.00$3,540.00— $3,500.00 – $3,500.00Jan 21, 2022
AR152440BORROW EXCAVATIONC.Y. 13,800 $0.0100$0.0100— $0.0100 – $0.0100Jul 30, 2021
AR152441ON-SITE BORROWC.Y. 11,528 $10.00$23.00— $10.00 – $10.00Jun 14, 2019
AR152451SHOULDER EMBANKMENTC.Y. 11,750 $78.00$78.00— $78.00 – $78.00Jun 12, 2020
AR152520UNDERCUTS.Y. 11,408 $19.80$35.91— $19.80 – $19.80Jan 18, 2019
AR152541STABILIZATION GEOGRIDS.Y. 11,350 $6.72$4.91— $6.72 – $6.72Aug 2, 2019
AR152550CRUSHED CONC. CONST. PLATFORM - 18"S.Y. 17,125 $14.00$45.50— $14.00 – $14.00Jan 17, 2020
AR152621REMOVE CONCRETEC.Y. 12 $2,003.41$2,003.41— $2,003.41 – $2,003.41Nov 6, 2020
AR153501CONTROLLED LOW-STRENGTH MATERIALL.F. 1720 $7.12$12.40— $7.12 – $7.12Nov 9, 2018
AR154506GRANULAR SUBBASE - 6"S.Y. 14,000 $58.36$58.36— $58.36 – $58.36Nov 6, 2020
AR154706CRUSHED AGG BASE COURSE - 6"S.Y. 17,125 $17.00$17.50— $17.00 – $17.00Jan 17, 2020
AR155530HYDRATED LIMETON 1157 $571.89$598.30— $571.89 – $571.89Jun 15, 2018
AR155612SOIL PROCESSING-12"S.Y. 18,130 $1.35$3.05— $1.35 – $1.35Jan 15, 2021
AR155616SOIL PROCESSING-16"S.Y. 14,325 $4.00$7.38— $4.00 – $4.00Nov 9, 2018
AR156532EXCELSIOR BLANKETS.Y. 1175 $2.25$2.25— $2.25 – $2.25Jan 18, 2019
AR156544RIPRAP-GRADATION NO. 4S.Y. 1100 $100.80$140.40— $100.80 – $100.80Aug 2, 2019
AR156550RIPRAPTON 1150 $99.00$73.18— $99.00 – $99.00Mar 8, 2019
AR162210CLASS E MANUAL SLIDE GATE-10'EACH 12 $10,768.00$10,834.00— $10,768.00 – $10,768.00Aug 2, 2019
AR162222CLASS E MANUAL SLIDE GATE-22'EACH 11 $12,800.00$13,300.00— $12,800.00 – $12,800.00Aug 2, 2019
AR162228CLASS E MANUAL SLIDE GATE - 28'EACH 14 $8,905.22$10,452.61— $8,905.22 – $8,905.22Apr 26, 2019
AR162570DETECTOR LOOPL.S. 11 $2,800.00$3,544.86— $2,800.00 – $2,800.00Apr 27, 2018
AR162571DETECTOR LOOPEACH 12 $1,942.50$1,942.50— $1,942.50 – $1,942.50Jun 15, 2018
AR162605CLASS E GATE-5'EACH 16 $529.57$1,514.79— $529.57 – $529.57Apr 26, 2019
AR162608CLASS E GATE-8'EACH 11 $8,319.00$5,206.33— $8,319.00 – $8,319.00Apr 23, 2021
AR162614CLASS E GATE 14'EACH 11 $1,050.00$3,914.25— $1,050.00 – $1,050.00Aug 2, 2019
AR162616CLASS E GATE-16'EACH 11 $1,250.00$4,769.75— $1,250.00 – $1,250.00Aug 2, 2019
AR162626CLASS E GATE - 26'EACH 11 $3,500.00$4,365.00— $3,500.00 – $3,500.00Jan 19, 2018
AR162712ELECTRIC GATE-12'EACH 11 $28,461.83$17,525.61— $28,461.83 – $28,461.83Apr 23, 2021
AR162720ELECTRIC GATE-20'EACH 13 $12,696.00$12,312.50— $12,696.00 – $12,696.00Aug 2, 2019
AR162722ELECTRIC GATE - 22'EACH 11 $13,275.00$13,992.25— $13,275.00 – $13,275.00Aug 2, 2019
AR162725ELECTRIC GATE-25'EACH 11 $13,640.00$14,365.75— $13,640.00 – $13,640.00Aug 2, 2019
AR162730ELECTRIC GATE-30'EACH 11 $14,352.00$14,978.00— $14,352.00 – $14,352.00Aug 2, 2019
AR162808CLASS E FENCE 8' W/2' BURIEDL.F. 13,140 $64.47$67.24— $64.47 – $64.47Apr 26, 2019
AR2085466" OVERSIZE AGGREGATES.Y. 110,133 $5.15$7.65— $5.15 – $5.15Jan 18, 2019
AR2086066" AGGREGATE BASE COURSES.Y. 1930 $13.44$16.22— $13.44 – $13.44Aug 2, 2019
AR20861010" AGGREGATE BASE COURSES.Y. 1755 $10.00$14.67— $10.00 – $10.00Apr 27, 2018
AR209600GEOTEXTILE FABRICS.Y. 12,125 $3.00$2.59— $3.00 – $3.00Jan 18, 2019
AR209609CRUSHED AGG. BASE COURSE-9"S.Y. 1562 $12.00$21.07— $12.00 – $12.00Jan 18, 2019
AR209611CRUSHED AGGREGATE BASE COURSE-11"S.Y. 120,443 $12.25$16.10— $12.25 – $12.25Aug 2, 2019
AR209622CRUSHED AGG. BASE COURSE - 22"S.Y. 12,773 $25.00$23.08— $25.00 – $25.00Jun 14, 2019
AR209650AGGREGATE BASE PREPARATIONSQ YD 13,400 $2.10$3.05— $2.10 – $2.10Aug 5, 2022
AR209655AGGREGATE BASE REMOVALS.Y. 1394 $11.00$10.73— $11.00 – $11.00Jun 15, 2018
AR209708CRUSHED AGG. SHOULDER - 8"S.Y. 1385 $21.04$21.01— $21.04 – $21.04Nov 6, 2020
AR401010CONTRACTOR QUALITY CONTROL PROGRAML.S. 11 $150,000.00$150,000.00— $150,000.00 – $150,000.00Jun 12, 2020
AR401502BITUMINOUS SURFACE COURSE-2"SQ YD 122 $135.00$217.50— $135.00 – $135.00Jun 17, 2022
AR401611BIT. SURFACE COURSE-METHOD ITON 1525 $81.00$87.75— $81.00 – $81.00Jan 19, 2018
AR401654BITUMINOUS PAVEMENT MILLING - 4"S.Y. 17,547 $7.00$7.10— $7.00 – $7.00Apr 26, 2019
AR401657BITUMINOUS PAVEMENT MILLING, 3"S.Y. 17,500 $4.25$4.25— $4.25 – $4.25Jun 12, 2020
AR401658BITUMINOUS PAVEMENT MILLING, 8" ANDS.Y. 132,500 $8.75$8.75— $8.75 – $8.75Jun 12, 2020
AR401710BITUMINOUS BASE COURSETON 123,495 $137.00$137.00— $137.00 – $137.00Jun 12, 2020
AR501124RUBBLIZE PAVEMENT - 16" MAXS.Y. 178,300 $3.17$3.17— $3.17 – $3.17Jun 12, 2020
AR50151010" PCC PAVEMENTS.Y. 18,490 $68.00$68.00— $68.00 – $68.00Aug 3, 2018
AR50151212" PCC PAVEMENTSQ YD 110,664 $115.70$115.70— $115.70 – $115.70Apr 29, 2022
AR50151515" PCC PAVEMENTS.Y. 1429 $135.00$153.79— $135.00 – $135.00Jul 31, 2020
AR50151717" PCC PAVEMENTS.Y. 17,460 $205.50$238.88— $205.50 – $205.50Jan 17, 2020
AR50152717.5" PCC PAVEMENTS.Y. 13,800 $451.55$451.55— $451.55 – $451.55Nov 6, 2020
AR5016066" PCC SIDEWALKS.F. 1644 $9.90$10.69— $9.90 – $9.90Nov 6, 2020
AR501665PCC PAVEMENT SAWINGL.F. 191 $4.00$4.00— $4.00 – $4.00Aug 3, 2018
AR5019099" PCC PAVEMENT REMOVALS.Y. 197 $90.00$77.70— $90.00 – $90.00Jul 31, 2020
AR50191515" PCC PAVEMENT REMOVALS.Y. 1429 $60.00$66.36— $60.00 – $60.00Jul 31, 2020
AR501922PCC SPALL REPAIRS.F. 1950 $99.35$99.35— $99.35 – $99.35Aug 2, 2019
AR510511TIE DOWN-TYPE AEACH 117 $900.00$899.86— $900.00 – $900.00Jun 15, 2018
AR608511NEW ASPHALT SURFACE TREATMENTS.Y. 14,600 $4.09$6.05— $4.09 – $4.09Jan 18, 2019
AR610510STRUCTURAL PC CONCRETEC.Y. 15 $500.00$500.00— $500.00 – $500.00Aug 2, 2019
AR620545PAVEMENT MARKING-WATERBORNE SPHPSS.F. 11,172 $4.75$4.83— $4.75 – $4.75Jan 17, 2020
AR620595TEMPORARY MARKING & REMOVALS.F. 1275 $8.80$8.80— $8.80 – $8.80Aug 3, 2018
AR620610PAVEMENT MARKING - SURFACE PAINTEDS.F. 1240 $37.46$37.46— $37.46 – $37.46Jun 12, 2020
AR7010088" PVC STORM SEWERL.F. 167 $45.00$53.00— $45.00 – $45.00Jan 18, 2019
AR70101010" PVC STORM SEWERL.F. 163 $50.00$62.50— $50.00 – $50.00Jan 19, 2018
AR70101515" PVC STORM SEWERL.F. 120 $83.00$100.12— $83.00 – $83.00Mar 9, 2018
AR701173PRECAST CONC. BOX CULVERT 7'X3'L.F. 140 $1,008.00$893.00— $1,008.00 – $1,008.00Aug 2, 2019
10,401–10,500 of 13,847‹ PrevNext ›

Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.