| Bid code | Description | Unit | Jobs ▼ | Avg low bid | Last let |
|---|---|---|---|---|---|
| AR119511 | AIRPORT OBSTRUCTION LIGHT-SINGLE | EACH | 1 | $10,879.00 | Jan 17, 2020 |
| AR125401 | REPLACE LIGHT FIXTURE | EACH | 1 | $450.00 | Aug 2, 2019 |
| AR125412 | MITL-STAKE MOUNTED (FIXTURE ONLY) | EACH | 1 | $693.00 | Mar 9, 2018 |
| AR125417 | MITL-BASE MOUNTED IN SHOULDER | EACH | 1 | $2,149.29 | Jan 15, 2021 |
| AR125418 | MITL-BASE MOUNTED (FIXTURE ONLY) | EACH | 1 | $1,052.00 | Mar 9, 2018 |
| AR125447 | TAXI GUIDANCE SIGN, 7 CHARACTER | EACH | 1 | $7,700.00 | Jun 12, 2020 |
| AR125448 | TAXI GUIDANCE SIGN, 8 CHARACTER | EACH | 1 | $6,000.00 | Aug 2, 2019 |
| AR125506 | MIRL, STAKE MOUNTED-LED | EACH | 1 | $1,050.00 | Sep 17, 2021 |
| AR125540 | MI THRESHOLD LIGHT STAKE MTD | EACH | 1 | $750.00 | Nov 8, 2019 |
| AR125541 | MI THRESHOLD LIGHT STAKE MTD-LED | EACH | 1 | $1,075.00 | Sep 17, 2021 |
| AR125550 | HI THRESHOLD LIGHT BASE MTD | EACH | 1 | $2,470.00 | Jun 11, 2021 |
| AR125560 | RUNWAY DISTANCE REMAINING SIGN | EACH | 1 | $727.07 | Jan 15, 2021 |
| AR125801 | 5/8" X 10' COPPER COATED GROUND ROD | EACH | 1 | $134.50 | Apr 23, 2021 |
| AR125900 | REMOVE STAKE MOUNTED LIGHT (FIXTURE | EACH | 1 | $162.00 | Mar 9, 2018 |
| AR125905 | REMOVE RWY DISTANCE REMAIN SIGN | EACH | 1 | $220.25 | Nov 6, 2020 |
| AR125909 | REMOVE VASI | EACH | 1 | $2,500.00 | Aug 3, 2018 |
| AR125910 | REMOVE PLASI | EACH | 1 | $2,591.25 | Mar 6, 2020 |
| AR125911 | REMOVE RUNWAY GUARD LIGHT | EACH | 1 | $500.00 | Jan 17, 2020 |
| AR125913 | REMOVE EDGE LIGHT | EACH | 1 | $200.00 | Aug 2, 2019 |
| AR125921 | REPLACE STAKE MOUNTED LIGHT | EACH | 1 | $368.00 | Jan 15, 2021 |
| AR125927 | REPLACE REILS | PAIR | 1 | $26,300.00 | Jul 30, 2021 |
| AR125946 | ADJUST SPLICE CAN | EACH | 1 | $1,166.00 | Jul 31, 2020 |
| AR125968 | RELOCATE PAPI | EACH | 1 | $51,333.85 | Aug 5, 2022 |
| AR125975 | RELOCATE RUNWAY GUARD LIGHT | EACH | 1 | $1,250.00 | Jan 17, 2020 |
| AR150536 | LIGHTED RUNWAY CLOSURE MARKER | EACH | 1 | $18,250.00 | Apr 23, 2021 |
| AR150550 | CONSTRUCTION ACCESS | L.S. | 1 | $62,688.30 | Apr 26, 2019 |
| AR151410 | CLEARING | ACRE | 1 | $10,000.00 | Aug 5, 2022 |
| AR151431 | STUMP REMOVAL 2.5 - 5.0 FT. DIAM. | EACH | 1 | $150.00 | Jan 21, 2022 |
| AR151451 | CLEARING AND GRUBBING 0"-6" | ACRE | 1 | $1,014.89 | Apr 27, 2018 |
| AR151460 | MISC. CLEARING | L SUM | 1 | $3,500.00 | Jan 21, 2022 |
| AR152440 | BORROW EXCAVATION | C.Y. | 1 | $0.0100 | Jul 30, 2021 |
| AR152441 | ON-SITE BORROW | C.Y. | 1 | $10.00 | Jun 14, 2019 |
| AR152451 | SHOULDER EMBANKMENT | C.Y. | 1 | $78.00 | Jun 12, 2020 |
| AR152520 | UNDERCUT | S.Y. | 1 | $19.80 | Jan 18, 2019 |
| AR152541 | STABILIZATION GEOGRID | S.Y. | 1 | $6.72 | Aug 2, 2019 |
| AR152550 | CRUSHED CONC. CONST. PLATFORM - 18" | S.Y. | 1 | $14.00 | Jan 17, 2020 |
| AR152621 | REMOVE CONCRETE | C.Y. | 1 | $2,003.41 | Nov 6, 2020 |
| AR153501 | CONTROLLED LOW-STRENGTH MATERIAL | L.F. | 1 | $7.12 | Nov 9, 2018 |
| AR154506 | GRANULAR SUBBASE - 6" | S.Y. | 1 | $58.36 | Nov 6, 2020 |
| AR154706 | CRUSHED AGG BASE COURSE - 6" | S.Y. | 1 | $17.00 | Jan 17, 2020 |
| AR155530 | HYDRATED LIME | TON | 1 | $571.89 | Jun 15, 2018 |
| AR155612 | SOIL PROCESSING-12" | S.Y. | 1 | $1.35 | Jan 15, 2021 |
| AR155616 | SOIL PROCESSING-16" | S.Y. | 1 | $4.00 | Nov 9, 2018 |
| AR156532 | EXCELSIOR BLANKET | S.Y. | 1 | $2.25 | Jan 18, 2019 |
| AR156544 | RIPRAP-GRADATION NO. 4 | S.Y. | 1 | $100.80 | Aug 2, 2019 |
| AR156550 | RIPRAP | TON | 1 | $99.00 | Mar 8, 2019 |
| AR162210 | CLASS E MANUAL SLIDE GATE-10' | EACH | 1 | $10,768.00 | Aug 2, 2019 |
| AR162222 | CLASS E MANUAL SLIDE GATE-22' | EACH | 1 | $12,800.00 | Aug 2, 2019 |
| AR162228 | CLASS E MANUAL SLIDE GATE - 28' | EACH | 1 | $8,905.22 | Apr 26, 2019 |
| AR162570 | DETECTOR LOOP | L.S. | 1 | $2,800.00 | Apr 27, 2018 |
| AR162571 | DETECTOR LOOP | EACH | 1 | $1,942.50 | Jun 15, 2018 |
| AR162605 | CLASS E GATE-5' | EACH | 1 | $529.57 | Apr 26, 2019 |
| AR162608 | CLASS E GATE-8' | EACH | 1 | $8,319.00 | Apr 23, 2021 |
| AR162614 | CLASS E GATE 14' | EACH | 1 | $1,050.00 | Aug 2, 2019 |
| AR162616 | CLASS E GATE-16' | EACH | 1 | $1,250.00 | Aug 2, 2019 |
| AR162626 | CLASS E GATE - 26' | EACH | 1 | $3,500.00 | Jan 19, 2018 |
| AR162712 | ELECTRIC GATE-12' | EACH | 1 | $28,461.83 | Apr 23, 2021 |
| AR162720 | ELECTRIC GATE-20' | EACH | 1 | $12,696.00 | Aug 2, 2019 |
| AR162722 | ELECTRIC GATE - 22' | EACH | 1 | $13,275.00 | Aug 2, 2019 |
| AR162725 | ELECTRIC GATE-25' | EACH | 1 | $13,640.00 | Aug 2, 2019 |
| AR162730 | ELECTRIC GATE-30' | EACH | 1 | $14,352.00 | Aug 2, 2019 |
| AR162808 | CLASS E FENCE 8' W/2' BURIED | L.F. | 1 | $64.47 | Apr 26, 2019 |
| AR208546 | 6" OVERSIZE AGGREGATE | S.Y. | 1 | $5.15 | Jan 18, 2019 |
| AR208606 | 6" AGGREGATE BASE COURSE | S.Y. | 1 | $13.44 | Aug 2, 2019 |
| AR208610 | 10" AGGREGATE BASE COURSE | S.Y. | 1 | $10.00 | Apr 27, 2018 |
| AR209600 | GEOTEXTILE FABRIC | S.Y. | 1 | $3.00 | Jan 18, 2019 |
| AR209609 | CRUSHED AGG. BASE COURSE-9" | S.Y. | 1 | $12.00 | Jan 18, 2019 |
| AR209611 | CRUSHED AGGREGATE BASE COURSE-11" | S.Y. | 1 | $12.25 | Aug 2, 2019 |
| AR209622 | CRUSHED AGG. BASE COURSE - 22" | S.Y. | 1 | $25.00 | Jun 14, 2019 |
| AR209650 | AGGREGATE BASE PREPARATION | SQ YD | 1 | $2.10 | Aug 5, 2022 |
| AR209655 | AGGREGATE BASE REMOVAL | S.Y. | 1 | $11.00 | Jun 15, 2018 |
| AR209708 | CRUSHED AGG. SHOULDER - 8" | S.Y. | 1 | $21.04 | Nov 6, 2020 |
| AR401010 | CONTRACTOR QUALITY CONTROL PROGRAM | L.S. | 1 | $150,000.00 | Jun 12, 2020 |
| AR401502 | BITUMINOUS SURFACE COURSE-2" | SQ YD | 1 | $135.00 | Jun 17, 2022 |
| AR401611 | BIT. SURFACE COURSE-METHOD I | TON | 1 | $81.00 | Jan 19, 2018 |
| AR401654 | BITUMINOUS PAVEMENT MILLING - 4" | S.Y. | 1 | $7.00 | Apr 26, 2019 |
| AR401657 | BITUMINOUS PAVEMENT MILLING, 3" | S.Y. | 1 | $4.25 | Jun 12, 2020 |
| AR401658 | BITUMINOUS PAVEMENT MILLING, 8" AND | S.Y. | 1 | $8.75 | Jun 12, 2020 |
| AR401710 | BITUMINOUS BASE COURSE | TON | 1 | $137.00 | Jun 12, 2020 |
| AR501124 | RUBBLIZE PAVEMENT - 16" MAX | S.Y. | 1 | $3.17 | Jun 12, 2020 |
| AR501510 | 10" PCC PAVEMENT | S.Y. | 1 | $68.00 | Aug 3, 2018 |
| AR501512 | 12" PCC PAVEMENT | SQ YD | 1 | $115.70 | Apr 29, 2022 |
| AR501515 | 15" PCC PAVEMENT | S.Y. | 1 | $135.00 | Jul 31, 2020 |
| AR501517 | 17" PCC PAVEMENT | S.Y. | 1 | $205.50 | Jan 17, 2020 |
| AR501527 | 17.5" PCC PAVEMENT | S.Y. | 1 | $451.55 | Nov 6, 2020 |
| AR501606 | 6" PCC SIDEWALK | S.F. | 1 | $9.90 | Nov 6, 2020 |
| AR501665 | PCC PAVEMENT SAWING | L.F. | 1 | $4.00 | Aug 3, 2018 |
| AR501909 | 9" PCC PAVEMENT REMOVAL | S.Y. | 1 | $90.00 | Jul 31, 2020 |
| AR501915 | 15" PCC PAVEMENT REMOVAL | S.Y. | 1 | $60.00 | Jul 31, 2020 |
| AR501922 | PCC SPALL REPAIR | S.F. | 1 | $99.35 | Aug 2, 2019 |
| AR510511 | TIE DOWN-TYPE A | EACH | 1 | $900.00 | Jun 15, 2018 |
| AR608511 | NEW ASPHALT SURFACE TREATMENT | S.Y. | 1 | $4.09 | Jan 18, 2019 |
| AR610510 | STRUCTURAL PC CONCRETE | C.Y. | 1 | $500.00 | Aug 2, 2019 |
| AR620545 | PAVEMENT MARKING-WATERBORNE SPHPS | S.F. | 1 | $4.75 | Jan 17, 2020 |
| AR620595 | TEMPORARY MARKING & REMOVAL | S.F. | 1 | $8.80 | Aug 3, 2018 |
| AR620610 | PAVEMENT MARKING - SURFACE PAINTED | S.F. | 1 | $37.46 | Jun 12, 2020 |
| AR701008 | 8" PVC STORM SEWER | L.F. | 1 | $45.00 | Jan 18, 2019 |
| AR701010 | 10" PVC STORM SEWER | L.F. | 1 | $50.00 | Jan 19, 2018 |
| AR701015 | 15" PVC STORM SEWER | L.F. | 1 | $83.00 | Mar 9, 2018 |
| AR701173 | PRECAST CONC. BOX CULVERT 7'X3' | L.F. | 1 | $1,008.00 | Aug 2, 2019 |
Averages are weighted by quantity. "Avg low bid" uses the apparent low bidder's unit prices; "Avg all bids" uses every bidder; "Avg estimate" is TxDOT's engineer's estimate. Built from TxDOT bid tabulations loaded into Bid Potato.