| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 244 | CY |
$8.00 |
$32.81 |
| 2 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 504 | CY |
$10.00 |
$23.34 |
| 3 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 326 | CY |
$100.00 |
$106.04 |
| 4 | 275-6001 |
CEMENT | 24 | TON |
$150.00 |
$211.00 |
| 5 | 276-6205 |
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(6") | 1,956 | SY |
$40.00 |
$22.29 |
| 6 | 310-6009 |
PRIME COAT (MC-30) | 374 | GAL |
$5.00 |
$7.86 |
| 7 | 316-6001 |
ASPH (MULTI OPTION) | 696 | GAL |
$5.00 |
$5.05 |
| 8 | 316-6002 |
AGGR (MULTI OPTION) | 16 | CY |
$100.00 |
$554.31 |
| 9 | 340-6104 |
D-GR HMA(SQ) TY-D SAC-B PG64-22 | 187 | TON |
$100.00 |
$160.32 |
| 10 | 403-6006 |
TEMPORARY SPL SHORING (COFFERDAM) | 2,228 | SF |
$25.00 |
$62.05 |
| 11 | 407-6005 |
SHEET PILING (PZ - 22) | 4,980 | SF |
$50.00 |
$47.89 |
| 12 | 420-6065 |
CL C CONC (COPING)(SRC) | 48 | CY |
$1,000.00 |
$2,645.27 |
| 13 | 420-6074 |
CL C CONC (MISC) | 3 | CY |
$1,200.00 |
$3,338.12 |
| 14 | 432-6003 |
RIPRAP (CONC)(6 IN) | 118 | CY |
$800.00 |
$567.84 |
| 15 | 432-6017 |
RIPRAP (STONE TY R)(DRY)(18 IN) | 868 | CY |
$150.00 |
$173.52 |
| 16 | 450-6047 |
RAIL (HANDRAIL)(TY A) | 28 | LF |
$300.00 |
$123.71 |
| 17 | 500-6001 |
MOBILIZATION | 1 | LS |
$75,000.00 |
$100,600.00 |
| 18 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$1,000.00 |
$1,150.00 |
| 19 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 78 | SY |
$50.00 |
$28.73 |
| 20 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 78 | SY |
$15.00 |
$6.73 |
| 21 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,535 | LF |
$2.00 |
$2.27 |
| 22 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,535 | LF |
$1.00 |
$0.9500 |
| 23 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 1,530 | LF |
$0.5000 |
$1.71 |
| 24 | 672-6009 |
REFL PAV MRKR TY II-A-A | 20 | EA |
$3.00 |
$11.40 |
| 25 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 51 | DAY |
$70.00 |
$106.78 |