Bid Tab X-ray: 6511-73-001

Nov 17, 2026 · Nueces Sign up free
Set your company to personalize scores

6511-73-001 Cement CCAO/AAO

6511-73-001 · let Nov 17, 2026 · Nueces, Corpus Christi · Material Maintenance Project

$222,080Low bid: AKA-MATERIALS-6.7% vs estimate $237,958
$3,640Left on the table1.6% gap to the second bid
2BiddersSpread 2% low to high
7Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1AKA-MATERIALS $222,080-6.7% $3,640 0 0
2TOUCHSTONE RESOURCES, LLC $225,720+1.6%-5.1% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

AKA-MATERIALS vs TOUCHSTONE RESOURCES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8009-7001 HYDRAULIC CEMENT(TY I)(DEL)(ST 1)500 TON $208.50$210.00$228.61 $750
8009-7002 HYDRAULIC CEMENT(TY I)(DEL)(ST 2)500 TON $208.50$210.00$217.14 $750
8009-7055 HYDRAULIC CEMENT(TY I)(DEL)(94LB)(ST 1)300 BAG $13.10$15.00$13.17 $570
8009-7056 HYDRAULIC CEMENT(TY I)(DEL)(94LB)(ST 2)300 BAG $13.20$15.00$12.70 $540
8009-7039 HYDRAULIC CEMENT(TY I)(DEL)(47LB)(ST 3)224 BAG $8.40$10.00$7.57 $358
8009-7037 HYDRAULIC CEMENT(TY I)(DEL)(47LB)(ST 1)224 BAG $8.50$10.00$7.98 $336
8009-7038 HYDRAULIC CEMENT(TY I)(DEL)(47LB)(ST 2)224 BAG $8.50$10.00$7.87 $336

Positive: the low bidder was cheaper on that item. These 7 items account for $3,640 of the $3,640 gap.