BPM Scouring Repair
6497-55-001 · let Nov 12, 2026 · Denton, Dallas · Bridge Preventative Maintenance - Sealed
$493,320Low bid: ROAD DOCTORS LLC-6.6% vs estimate $528,413
$25,748Left on the table5.2% gap to the second bid
6BiddersSpread 51% low to high
25Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ROAD DOCTORS LLC | $493,320 | -6.6% | $25,748 | 6+$66,556 | 2-$522,190 | |
| 2 | ICOS MANAGEMENT, LLC | $519,068 | +5.2% | -1.8% | $48,152 | 4+$34,853 | 2-$519,186 |
| 3 | TEXAS ROAD CONSTRUCTION, LLC | $567,220 | +15.0% | 7.3% | $31,578 | 3+$33,785 | 5-$520,035 |
| 4 | REAR CONTRACTORS LLC | $598,798 | +21.4% | 13.3% | $55,890 | 7+$61,390 | 4-$540,514 |
| 5 | PREMIER CONTRACTORS LLC | $654,688 | +32.7% | 23.9% | $91,521 | 6+$72,925 | 4-$540,514 |
| 6 | JR WEST TEXAS CONCRETE LLC | $746,209 | +51.3% | 41.2% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
ROAD DOCTORS LLC vs ICOS MANAGEMENT, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 459-7010 GABIONS (3' X 3')(GALV) | 190 CY | $200.00 | $420.00 | $319.83 | $41,800 |
| 420-7010 CL B CONC (FLUME) | 9 CY | $3,000.00 | $735.00 | $756.63 | -$20,385 |
| 104-7006 REMOV CONC (RIPRAP) | 217 SY | $100.00 | $21.00 | $14.32 | -$17,143 |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 1,231 CY | $180.00 | $189.00 | $190.61 | $11,079 |
| 500-7001 MOBILIZATION | 1 LS | $40,000.00 | $51,000.00 | $523,850.32 | $11,000 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,000.00 | $1.10 | $11,585.04 | -$7,996 |
| 400-7010 CEM STABIL BKFL | 93 CY | $250.00 | $315.00 | $138.14 | $6,045 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 80 LF | $125.00 | $63.00 | $15.92 | -$4,960 |
| 104-7041 REMOV CONC (FLUME) | 59 SY | $100.00 | $21.00 | $18.83 | -$4,661 |
| 505-7001 TMA (STATIONARY) | 67 DAY | $150.00 | $210.00 | $217.57 | $4,020 |
| 110-7002 EXCAV (CHANNEL) | 89 CY | $60.00 | $105.00 | $16.69 | $4,005 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 67 DAY | $150.00 | $189.00 | $87.82 | $2,613 |
| 432-7002 RIPRAP (CONC)(5 IN) | 11 CY | $500.00 | $735.00 | $585.15 | $2,585 |
| 401-7001 FLOWABLE BACKFILL | 164 CY | $300.00 | $315.00 | $298.77 | $2,460 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 50 LF | $65.00 | $21.00 | $71.34 | -$2,200 |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 22 CY | $250.00 | $189.00 | $179.97 | -$1,342 |
| 770-7010 REALIGN POSTS | 1 EA | $100.00 | $840.00 | $24.32 | $740 |
| 506-7011 ROCK FILTER DAMS (REMOVE) | 50 LF | $25.00 | $10.50 | $12.47 | -$725 |
| 752-7006 TREE REMOVAL (12" - 18" DIA) | 1 EA | $1,500.00 | $2,100.00 | $100.44 | $600 |
| 104-7003 REMOV CONC (MOWSTRIP) | 2 SY | $500.00 | $210.00 | $20.48 | -$580 |
Positive: the low bidder was cheaper on that item. These 20 items account for $26,955 of the $25,748 gap.
ROAD DOCTORS LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 420-7010 CL B CONC (FLUME) | 9 CY | $3,000.00 | $756.63 | 3.96x | $20,190 |
| 104-7006 REMOV CONC (RIPRAP) | 217 SY | $100.00 | $14.32 | 6.98x | $18,593 |
| 400-7010 CEM STABIL BKFL | 93 CY | $250.00 | $138.14 | 1.81x | $10,403 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 80 LF | $125.00 | $15.92 | 7.85x | $8,727 |
| 104-7041 REMOV CONC (FLUME) | 59 SY | $100.00 | $18.83 | 5.31x | $4,789 |
| 110-7002 EXCAV (CHANNEL) | 89 CY | $60.00 | $16.69 | 3.59x | $3,854 |
| 500-7001 MOBILIZATION | 1 LS | $40,000.00 | $523,850.32 | 0.08x | -$483,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,000.00 | $11,585.04 | 0.17x | -$38,340 |
ICOS MANAGEMENT, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 400-7010 CEM STABIL BKFL | 93 CY | $315.00 | $138.14 | 2.28x | $16,448 |
| 110-7002 EXCAV (CHANNEL) | 89 CY | $105.00 | $16.69 | 6.29x | $7,859 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 67 DAY | $189.00 | $87.82 | 2.15x | $6,779 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 80 LF | $63.00 | $15.92 | 3.96x | $3,767 |
| 500-7001 MOBILIZATION | 1 LS | $51,000.00 | $523,850.32 | 0.10x | -$472,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.10 | $11,585.04 | 0.00x | -$46,336 |
TEXAS ROAD CONSTRUCTION, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 104-7006 REMOV CONC (RIPRAP) | 217 SY | $100.00 | $14.32 | 6.98x | $18,593 |
| 400-7010 CEM STABIL BKFL | 93 CY | $250.00 | $138.14 | 1.81x | $10,403 |
| 104-7041 REMOV CONC (FLUME) | 59 SY | $100.00 | $18.83 | 5.31x | $4,789 |
| 500-7001 MOBILIZATION | 1 LS | $70,000.00 | $523,850.32 | 0.13x | -$453,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1,000.00 | $11,585.04 | 0.09x | -$42,340 |
| 505-7001 TMA (STATIONARY) | 67 DAY | $1.00 | $217.57 | 0.00x | -$14,510 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 67 DAY | $1.00 | $87.82 | 0.01x | -$5,817 |
| 506-7003 ROCK FILTER DAMS (INSTALL) (TY 3) | 50 LF | $1.00 | $71.34 | 0.01x | -$3,517 |
REAR CONTRACTORS LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 400-7010 CEM STABIL BKFL | 93 CY | $400.00 | $138.14 | 2.90x | $24,353 |
| 104-7006 REMOV CONC (RIPRAP) | 217 SY | $50.00 | $14.32 | 3.49x | $7,743 |
| 110-7002 EXCAV (CHANNEL) | 89 CY | $100.00 | $16.69 | 5.99x | $7,414 |
| 432-7002 RIPRAP (CONC)(5 IN) | 11 CY | $1,200.00 | $585.15 | 2.05x | $6,763 |
| 420-7010 CL B CONC (FLUME) | 9 CY | $1,500.00 | $756.63 | 1.98x | $6,690 |
| 752-7006 TREE REMOVAL (12" - 18" DIA) | 1 EA | $5,000.00 | $100.44 | 49.78x | $4,900 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 80 LF | $60.00 | $15.92 | 3.77x | $3,527 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.00 | $11,585.04 | 0.00x | -$46,336 |
| 505-7001 TMA (STATIONARY) | 67 DAY | $1.00 | $217.57 | 0.00x | -$14,510 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 67 DAY | $1.00 | $87.82 | 0.01x | -$5,817 |
PREMIER CONTRACTORS LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 400-7010 CEM STABIL BKFL | 93 CY | $550.00 | $138.14 | 3.98x | $38,303 |
| 104-7006 REMOV CONC (RIPRAP) | 217 SY | $60.00 | $14.32 | 4.19x | $9,913 |
| 110-7002 EXCAV (CHANNEL) | 89 CY | $120.00 | $16.69 | 7.19x | $9,194 |
| 432-7002 RIPRAP (CONC)(5 IN) | 11 CY | $1,200.00 | $585.15 | 2.05x | $6,763 |
| 104-7041 REMOV CONC (FLUME) | 59 SY | $100.00 | $18.83 | 5.31x | $4,789 |
| 132-7005 EMBANK (FNL)(OC)(TY C) | 2 CY | $2,000.00 | $18.71 | 106.88x | $3,963 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1.00 | $11,585.04 | 0.00x | -$46,336 |
| 505-7001 TMA (STATIONARY) | 67 DAY | $1.00 | $217.57 | 0.00x | -$14,510 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 67 DAY | $1.00 | $87.82 | 0.01x | -$5,817 |