Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate—
1 Plote Construction, Inc. Low bidder $2,294,000
2 Curran Contracting Company $2,410,988 +5.1%
3 Arrow Road Construction Co. $2,497,386 +8.9%

Bid tab: unit prices 39 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Plote Construct…#2 Curran Contract…#3 Arrow Road Cons…
1AR108088 1/C #8 XLP-USE3,500L.F. $7.50 $7.53 $7.70
2AR108656 3/C #6 600 V UG CABLE IN UD1,850L.F. $13.00 $13.05 $13.35
3AR110014 4" DIRECTIONAL BORE45L.F. $141.00 $141.58 $145.00
4AR110502 2-WAY CONCRETE ENCASED DUCT155L.F. $183.00 $183.75 $188.00
5AR110550 SPLIT DUCT30L.F. $185.00 $185.76 $190.00
6AR115610 ELECTRICAL HANDHOLE2EACH $10,200.00 $10,241.65 $10,500.00
7AR125100 ELEVATED RETROREFLECTIVE MARKER5EACH $261.00 $262.07 $270.00
8AR125106 RELOC. ELEV. RETROREFLECTIVE MARKER37EACH $217.00 $217.89 $223.00
9AR125901 REMOVE STAKE MOUNTED LIGHT12EACH $104.00 $104.43 $107.00
10AR125931 REPLACE LIGHT LENSE18EACH $289.00 $290.18 $297.00
11AR125941 ADJUST STAKE MOUNTED LIGHT12EACH $759.00 $762.10 $780.00
12AR150510 ENGINEER'S FIELD OFFICE1L.S. $17,000.00 $30,000.00 $18,600.00
13AR150520 MOBILIZATION1L.S. $137,409.10 $340,000.00 $277,000.00
14AR152410 UNCLASSIFIED EXCAVATION15,050C.Y. $21.00 $16.00 $16.70
15AR152440 BORROW EXCAVATION3,800C.Y. $0.0100 $0.0100 $0.0100
16AR152540 SOIL STABILIZATION FABRIC1,150S.Y. $4.25 $3.00 $2.70
17AR156510 SILT FENCE3,580L.F. $2.25 $5.00 $2.70
18AR156520 INLET PROTECTION10EACH $450.00 $250.00 $180.00
19AR156531 EROSION CONTROL BLANKET7,275S.Y. $0.8000 $0.8000 $0.8500
20AR208515 POROUS GRANULAR EMBANKMENT560C.Y. $64.00 $51.15 $72.00
21AR209608 CRUSHED AGG. BASE COURSE - 8"32,815S.Y. $9.00 $10.80 $12.75
22AR401610 BITUMINOUS SURFACE COURSE4,275TON $105.00 $100.00 $111.75
23AR401620 BIT. SURFACE COURSE, LEVELING90TON $110.00 $130.00 $147.75
24AR401630 BITUMINOUS SURFACE TEST SECTION1EACH $9,000.00 $10,000.00 $5,000.00
25AR401650 BITUMINOUS PAVEMENT MILLING4,250S.Y. $4.00 $2.50 $4.10
26AR401900 REMOVE BITUMINOUS PAVEMENT21,015S.Y. $6.00 $2.01 $3.00
27AR403610 BITUMINOUS BASE COURSE7,415TON $75.00 $78.00 $81.40
28AR403630 BITUMINOUS BASE TEST SECTION1EACH $9,000.00 $10,000.00 $5,000.00
29AR602510 BITUMINOUS PRIME COAT9,875GAL. $0.0100 $0.0100 $0.8000
30AR603510 BITUMINOUS TACK COAT10,615GAL. $0.0100 $0.0100 $0.8000
31AR620520 PAVEMENT MARKING-WATERBORNE19,180S.F. $1.05 $1.10 $1.10
32AR620525 PAVEMENT MARKING-BLACK BORDER8,990S.F. $1.05 $1.10 $1.10
33AR620900 PAVEMENT MARKING REMOVAL50S.F. $100.00 $90.37 $46.00
34AR705526 6" PERFORATED UNDERDRAIN W/SOCK660L.F. $56.00 $56.23 $22.30
35AR705640 UNDERDRAIN CLEANOUT7EACH $2,110.00 $2,118.61 $955.00
36AR705900 REMOVE UNDERDRAIN485L.F. $6.00 $10.04 $14.40
37AR705904 REMOVE UNDERDRAIN CLEANOUT7EACH $400.00 $401.63 $180.00
38AR901510 SEEDING10ACRE $2,000.00 $2,008.17 $2,070.00
39AR908515 HEAVY-DUTY HYDRAULIC MULCH10ACRE $4,500.00 $4,518.37 $4,623.75