101CG-1
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Phoenix Corporation of the Quad Cities Low bidder | $280,449 | ||
| 2 | Stutz Excavating, Inc. | $369,321 | +31.7% | |
| 3 | Prado Construction | $473,374 | +68.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Phoenix Corpora… | #2 Stutz Excavatin… | #3 Prado Construct… |
|---|---|---|---|---|---|---|---|---|
| 1 | X4402720 | GUTTER REMOV SPL | 3,085 | FOOT | $9.00 | $13.00 | $13.00 | |
| 2 | X6062700 | CONC GUTTER TA SPL | 3,085 | FOOT | $43.00 | $54.55 | $87.52 | |
| 3 | X7010200 | TC-PROT 701316 SPL | 1 | EACH | $3,400.00 | $23,000.00 | $10,144.28 | |
| 4 | X7015005 | CHANGEABLE MESSAGE SN | 80 | CAL DA | $55.00 | $65.00 | $72.36 | |
| 5 | 28100705 | STONE DUMP RIP CL A3 | 12 | SQ YD | $215.00 | $160.00 | $50.40 | |
| 6 | 31101810 | SUB GRAN MAT B 12 | 1,714 | SQ YD | $19.00 | $15.00 | $36.60 | |
| 7 | 60600095 | CLASS SI CONC OUTLET | 13 | CU YD | $475.00 | $200.00 | $496.40 | |
| 8 | 67100100 | MOBILIZATION | 1 | L SUM | $40,265.50 | $21,000.00 | $9,895.66 | |
| 9 | 70106700 | TEMP RUMBLE STRIPS | 6 | EACH | $500.00 | $810.00 | $788.48 | |
| 10 | 70107006 | PAVT MK BLKOUT TAPE 6 | 6,540 | FOOT | $0.5000 | $2.20 | $2.00 | |
| 11 | 70300150 | SHRT TRM PAVT MK REM | 3,270 | SQ FT | $0.7500 | $0.8000 | $0.8200 | |
| 12 | 78008210 | POLYUREA PM T1 LN 4 | 3,085 | FOOT | $2.00 | $11.00 | $10.50 | |
| 13 | 89000075 | TEMP PORT BR TR S INS | 1 | EACH | $15,750.00 | $25,700.00 | $14,766.02 |